I have manufactured Heat Pump assembly unit. During assembly each unit required 2-3 days to complete.
These operation consist of 7 no. of stages.
Each stage has multiple defect observed.
I need to start measuring defect level.
Should I start with DPU concept? Is that Applicable here?
What are the requirements of defect per unit?
Should I collect all opportunities of defect at each stage?
Can any one help for addressing defect level in assembly operation?