Is the review of a medical device Product Requirements Document (PRD) a "Design Review"?
Background: We developed a PRD for a client. Before the PRD was finalized, the engineers that prepared the document, an independent reviewer, and the client met to review the draft PRD. Minutes from the meeting were issued, and after incorporation of the action items from the meeting, the PRD was signed. I call this meeting a "Design Review". Am I correct?
Background: We developed a PRD for a client. Before the PRD was finalized, the engineers that prepared the document, an independent reviewer, and the client met to review the draft PRD. Minutes from the meeting were issued, and after incorporation of the action items from the meeting, the PRD was signed. I call this meeting a "Design Review". Am I correct?