MEP Method Statement during Tendering Stage of Railway Station

P

pesocom

#1
can you assist me for writing MEP method of statement during tendering stage of Railway station ..the client asked for MOS and i don't know is there templates to be a guide for me.please reply:(
 
Elsmar Forum Sponsor
Thread starter Similar threads Forum Replies Date
M V&V phase: Justification of acceptance criteria (statistical method ) - (Medical Device) Design and Development of Products and Processes 2
B AS9100D 7.1.5.2 Calibration or Verification Method using outside cal lab AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
Q Sampling method for Distributor verification activities EU Medical Device Regulations 1
D Difference between Test Method Validation and Gage R&R Qualification and Validation (including 21 CFR Part 11) 18
C Correct Calibration Method for Dial Depth Gage General Measurement Device and Calibration Topics 6
E Mentor for Test Method Validation (TMV) Design and Development of Products and Processes 2
earl62 IATF 16949 Clause 9.1.1.1 - What is the batch conformance to specification method? IATF 16949 - Automotive Quality Systems Standard 3
A Beginners help with ISO3951-2 Combined control s-method n>5 what is Phi ?? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
S What is the best method to bond urethane foam to urethane foam? Manufacturing and Related Processes 4
R BS EN 12060:1998 - Zinc and zinc alloys Method of sampling Specifications Manufacturing and Related Processes 4
M Test method validation - Is MSA (MSA1, MSA2, MSA3 and linearity) a good solution? Medical Device and FDA Regulations and Standards News 1
Pau Calvo How to motivate colleagues to use 8D method or similar Quality Manager and Management Related Issues 37
M Proper method to test flow of a regulator Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
V Minitab GRR crossed Xbar and r method macro needed Using Minitab Software 9
R Please share your method used for PEMS Validation IEC 62304 - Medical Device Software Life Cycle Processes 5
S AS9100D PEAR - Examples for organization's method for determining process results? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Y Post Market Surveillance Indicators and Analysis method EU Medical Device Regulations 1
silentmonkey Seeking efficient method to manage install base data Manufacturing and Related Processes 0
D 4M (Man, machine, method, materials) Management Manufacturing and Related Processes 3
Ron Rompen Measurement Method Challenge - Measure feature #91 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
C FDA on changing acceptance criteria re: analytical method validation US Food and Drug Administration (FDA) 1
M Issuing NCR for improper method statement submissions Internal Auditing 10
F Irradiation Sterilization Validation Maximum Dose - VDmax 25 method (ISO 11137) EU Medical Device Regulations 2
I "Method" vs "Process" - Differences Document Control Systems, Procedures, Forms and Templates 33
P Test Method Validation for Tensile Strength Tester Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 0
C ICP versus AA: How to determine appropriate specification for assay method verification Qualification and Validation (including 21 CFR Part 11) 1
I Flatness - Rectangular part using the three jack method Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10
B AS9102 Supplier Flow Down Method AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
M Control Method correspondence between PFMEA and CP FMEA and Control Plans 8
qualprod Qualitative or Quantitative? Risk method evaluation ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
Ron Rompen Dual level holes - Measurement method suggestions wanted General Measurement Device and Calibration Topics 9
D Sampling method that is representative of the devices supplied by that distributor EU Medical Device Regulations 5
P Production Line Pump Cleaning Validation Method Question Qualification and Validation (including 21 CFR Part 11) 0
A Risks related to Method Validation and Stability Studies Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 2
qualprod ISO 9001 Risk control method - What could be the better way to control risks? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
Ron Rompen Ford Method - Position Capability with MMC Modifier Capability, Accuracy and Stability - Processes, Machines, etc. 14
J Inspection method for T10 Hex driver General Measurement Device and Calibration Topics 13
qualprod ISO 9001:2015 - Right method to address clause 6.1? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
S Stakeholder analysis Method Six Sigma 1
T ER Checklist - Method(s) of conformity EU Medical Device Regulations 1
T ISO 17025 Method Verification - One sided “F” test or two sided “F” test ISO 17025 related Discussions 1
B Dosimeter Calibration Method General Measurement Device and Calibration Topics 5
A Test method for presence or absence of hexavalent chromium on a metal coating RoHS, REACH, ELV, IMDS and Restricted Substances 4
S Response Surface Method to create design matrix in Minitab Using Minitab Software 5
T Method to assess Measurement System of a Continuous Process Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
G HPLC Method Equivalence between USP and EP Various Other Specifications, Standards, and related Requirements 1
S Test Method Validation or MSA for Batch Manufacturing Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
A Test Method Validation on Elongation Machine General Measurement Device and Calibration Topics 0
B Gage R & R on Visual Inspection using the Cross Tabulation Method IATF 16949 - Automotive Quality Systems Standard 4
C Method of Monitoring our Internally Produced Non-Conforming Products Quality Tools, Improvement and Analysis 7

Similar threads

Top Bottom