M
marcost
Control Plans
Hello everybody,
I have a doubt about making a control plan. In our company we have control plans made by process, but the operators doesn't have copies of those. We are not certified by QS and we dont need to, but we sell eletric motors to industries that produces washes machines and this area is auditing us based on this concepts of APQP. We are trying to make our quality system aligned with the QS.
But my main question is about how to make the control plan, and if is necessary the operator have a copy. We have a lot of other procedures detailing the informations ..
I am sending attached a model of our control plan. But we dont call like that, we just call TGP, its another procedure.
Hello everybody,
I have a doubt about making a control plan. In our company we have control plans made by process, but the operators doesn't have copies of those. We are not certified by QS and we dont need to, but we sell eletric motors to industries that produces washes machines and this area is auditing us based on this concepts of APQP. We are trying to make our quality system aligned with the QS.
But my main question is about how to make the control plan, and if is necessary the operator have a copy. We have a lot of other procedures detailing the informations ..
I am sending attached a model of our control plan. But we dont call like that, we just call TGP, its another procedure.