Hello
the standard requires in (7.6.1)MSA for each type of measuring equipments, it means that not need MSA for all measuring equipments but just only one equipment for each type.
 
Elsmar Forum Sponsor
M

Malfreds

#32
Hi,
I liked the last post. Our customer is Ford and we have presented for approval to our STA/SQE the following:
-GR&R for each critical characteristic, no matter if we measure several dimensions with same instrument. For example, we have one CMM that we use to check 10 dimensions, so we perform 10 GR&R studies.
-Full MSA study (linearity,bias,stability,gr&r) for each instrument stated in CP. For example: One CMM to check 10 dimensions, one vernier to check 3 dimensions, one thickness meter to check 1 dimension, one go/nogo to check 4 dimensions; totally we perform 3 full MSA because go/nogo gage does not apply for linearity/bias/stability (at least as far as I know).

We present this within our PPAP documentation and also for ISO/TS recertification and we have been receiving green light each time.

One last thing. If for some reason we start to use another vernier to check a fourth dimension, we still don't perform full MSA for that new vernier because we have one for the other.

Let me know what you think about our process.

Thank you.
 

qusys

Trusted Information Resource
#33
Hi,
I liked the last post. Our customer is Ford and we have presented for approval to our STA/SQE the following:
-GR&R for each critical characteristic, no matter if we measure several dimensions with same instrument. For example, we have one CMM that we use to check 10 dimensions, so we perform 10 GR&R studies.
-Full MSA study (linearity,bias,stability,gr&r) for each instrument stated in CP. For example: One CMM to check 10 dimensions, one vernier to check 3 dimensions, one thickness meter to check 1 dimension, one go/nogo to check 4 dimensions; totally we perform 3 full MSA because go/nogo gage does not apply for linearity/bias/stability (at least as far as I know).

We present this within our PPAP documentation and also for ISO/TS recertification and we have been receiving green light each time.

One last thing. If for some reason we start to use another vernier to check a fourth dimension, we still don't perform full MSA for that new vernier because we have one for the other.

Let me know what you think about our process.

Thank you.
Could it be also depended on the sector of the business? In the semiconductor arena the equipment are automatic and operator who loads the equipment does not influence R&R. What about?
 

bobdoering

Stop X-bar/R Madness!!
Trusted Information Resource
#34
Could it be also depended on the sector of the business? In the semiconductor arena the equipment are automatic and operator who loads the equipment does not influence R&R. What about?
For such a case AIAG recommends Gage R and stabililty studies.
 

qusys

Trusted Information Resource
#35
For such a case AIAG recommends Gage R and stabililty studies.
Coul it be ok this solution?
Gr & R on one equipment of a family group, calibration on weekly basis of the other equipment with respect to a certificated primaty standard with point charged on SPC?:bigwave:
 

bobdoering

Stop X-bar/R Madness!!
Trusted Information Resource
#36
Coul it be ok this solution?
Gr & R on one equipment of a family group, calibration on weekly basis of the other equipment with respect to a certificated primaty standard with point charged on SPC?:bigwave:
As long as the family is similar automated machines with no operator impact on variation, then it is a possible.
 
Thread starter Similar threads Forum Replies Date
R MSA studies for Heat Treatment Equipment Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
P IATF 16949 MSA Studies for CMM machines IATF 16949 - Automotive Quality Systems Standard 3
L Number of Distinct Categories" or NDC Calculation in MSA Studies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 8
P Frequency and Sample Size Requirements for an MSA Studies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
Ron Rompen MSA Studies of Instruments in a Paint Shop Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
A Is conducting of all MSA studies required, even if not required by the customer? IATF 16949 - Automotive Quality Systems Standard 23
B For a measuring instrument, should MSA be done first or the Capability studies? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
B Best Methods for conducting Shadowgraph MSA Studies Quality Manager and Management Related Issues 2
D Requiring a "bad" part for attribute MSA studies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
B How many MSA studies are required and at what interval(s)? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9
J Analysis of GRR studies, MSA 4th Ed, Chapter III section B - Rigid Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
G Traceability Studies and Requirements for MSA (Measurement Systems Analysis) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
G Dealing with Excessive Within-Part Variation when doing MSA and Cpk studies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
B How many Samples are required in Attribute Data MSA Studies? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
S What is the Reference Value when we do Attribute MSA Studies? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 17
S The assessment of ndc figures in MSA studies. Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
J ANOVA Method for MSA studies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
S TS 16949 MSA Study Requirements - MSA Studies by Family Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7
P MSA Attribute Studies - Calculate Cross Tabs, Effectiveness, Miss Rate, False Alarm Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10
Ron Rompen MSA to perform Linearity and Stability studies on Variable Gauges with Minitab Ver 15 Using Minitab Software 6
L Is it necessary to carry out all the MSA studies? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
M MSA Studies when not required by a customer Statistical Analysis Tools, Techniques and SPC 6
R "Gauge (Gage) R&R Studies per MSA Manual" - Customer Audit Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 13
D MSA - Can Regular Calibration Replace Bias, Linearity and Stability Studies? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
J What MSA studies do you include in PPAP level 3? APQP and PPAP 2
C What are the minimum required MSA studies for a TS 16949 PPAP? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
Courier MSA Tools - Excel templates for doing the Linearity & Bias, & Stability Studies Excel .xls Spreadsheet Templates and Tools 13
D Measurement System Analysis (MSA) - Requirement to also do gage stability studies? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
X MSA Studies on a scale that is used in the calculation of Specific Gravity (SG) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7
Y MSA - Torque Wrenches - Statistical studies that cover requirements of MSA Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 15
G MSA Studies on heat shock tests - Should we just be calibrating the oven? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
B PPK Requirements & MSA Studies for PPAP APQP and PPAP 10
T APQP Control Plans - MSA studies for everything listed on the plan? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
Nihls MSA Study Type 2 (special conditions ) IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
Nihls When the MSA results show no operator influence Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
S MSA for attribute relation gage Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
Nihls MSA Study Type 1 (CMM) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
M MSA Study Type 1 not capable. We are at the limit. And manufacturing wants to continue producing. Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7
I Overwhelmed with attribute MSA requirement for visual inspection IATF 16949 - Automotive Quality Systems Standard 8
H Need MSA 4th ed. compliant attribute MSA template General Measurement Device and Calibration Topics 4
P MSA for titration Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6
P MSA - what exactly mean "system" and master sample Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
P MSA study for visual system with artifical inteligence Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
D MSA strategy Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
K Updated MSA with the Annual PPAP validations APQP and PPAP 8
E MSA for Push and Pull test Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9
6 MSA for Calculated Clearance Dimension Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
Ron Rompen MSA on automated measurement system - Multiple Step Vision System Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3
G MSA check list to audit IATF 16949 - Automotive Quality Systems Standard 10
R MSA for ATE (Automatic Test Equipment Embedded Software) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 9

Similar threads

Top Bottom