S
I have been told that for every device on a control plan you should have an MSA study. Is this a requirement or a should have? I am at a steel mill and some things listed on our control plan are process oriented such as a pyrometer measuring temperature or an x-ray gauge measuring thickness. Measurement using these devicews are not reported on a customer material test report. Just wanted some advice on this.

