Hi,
I have two questions about an MSA Study Type 2.
It's about a special process. We want to carry out an MSA Study Type 2 on a specially manufactured measuring machine.
1- There are only two components available.
That's why I planned the "MSA Study Type 2" that way. 3x operator, 2x components and 5x repeat measurements each (3x2x5 = 30). Because it is recommended in the books at least 5 components.
Can an "MSA Study Type 2" be carried out with two components?
2-The second problem is the measurement time of a component.
The complete MSA Study Type 2 will take 2 days (4 shifts). The room is good air-conditioned. Is this MSA Study Type 2 acceptable?
I have two questions about an MSA Study Type 2.
It's about a special process. We want to carry out an MSA Study Type 2 on a specially manufactured measuring machine.
1- There are only two components available.
That's why I planned the "MSA Study Type 2" that way. 3x operator, 2x components and 5x repeat measurements each (3x2x5 = 30). Because it is recommended in the books at least 5 components.
Can an "MSA Study Type 2" be carried out with two components?
2-The second problem is the measurement time of a component.
The complete MSA Study Type 2 will take 2 days (4 shifts). The room is good air-conditioned. Is this MSA Study Type 2 acceptable?