Hello, my name is Vinicius, and I'm an quality intern.
I'm doing in my company some MSA studies, and one of them is to qualify our tape measure.
I've done the studies folowing the manual and I am getting the results of the image below:
As it shows, the R - Chart is showing some bad results as it do not have any variation between the measurements of the inspectors, but the R&R values are way below the 10 % that is needed.
The main question is what should I do in this case, since the tape measure have a discrimination of 1 milimeter, so it will be very hard to train the company workers to read half of that. Can the study be approved withouth fixing that chart?
Thank you for your attention! I do apologize for any gramatical error, english is not my native language.
I'm doing in my company some MSA studies, and one of them is to qualify our tape measure.
I've done the studies folowing the manual and I am getting the results of the image below:

As it shows, the R - Chart is showing some bad results as it do not have any variation between the measurements of the inspectors, but the R&R values are way below the 10 % that is needed.
The main question is what should I do in this case, since the tape measure have a discrimination of 1 milimeter, so it will be very hard to train the company workers to read half of that. Can the study be approved withouth fixing that chart?
Thank you for your attention! I do apologize for any gramatical error, english is not my native language.