Hello All,
I have proved out a measurement system utilizing a single-up fixture. I now want to utilize my automated vision system and make a 6-up fixture. I have thought about performing the R&R in the following manor:
utilize 10 parts
3 trials
1 operator
6 "stations
The operator will load, measure and unload all 10 parts in each station for 3 trials.
I have no idea if this is correct or possible. Please help out. Thanks.