We just performed our Nadcap audit for composites:

Here is the finding:

Requirement: 7.1 - Is tooling identified and referenced in the work instructions for traceability?

Finding: Reference Part 141N8631Y103, Job 120665ANX, Op 260. A clear, plastic template was used to locate a stiffener in the center of the metal bond lay-up. The template had no identification of any kind. Because there is no evidence the template was ever inspected it cannot be determined if the stiffener is properly located. An audit of the final inspection operation for the part revealed that the location of the stiffener is not verified.

Is a composites/metal bond scope to AC7118. The thing is that the auditor made this a major finding. The item not identified is used as a shop aid.

Our question is: Should this have been a major finding?
Although we agree that there is room for improvement here it does not justify a complete breakdown of the product or impact to product?

We are thinking about getting PRI to change this finding to a minor but we are new at this. Any help or ideas will be appreciated. Thanks
 

Ninja

Looking for Reality
Trusted Information Resource
Because there is no evidence the template was ever inspected it cannot be determined if the stiffener is properly located.

An audit of the final inspection operation for the part revealed that the location of the stiffener is not verified.


Although we agree that there is room for improvement here it does not justify a complete breakdown of the product or impact to product?

Hello Eloy,
I do not work in aerospace...

That being said, I just have one question area for clarification:
1. If you don't control the location jig...
2. And don't verify stiffener placement in further inspection (you said final inspection so this is an assumption)...
3. And location is important to the final part...

How do you know it doesn't impact the product? Maybe it does impact the product...or COULD impact the product?

There are a few assumptions implicit in my question, so please shed some light on the needs/requirements vs. controls around the finding.
 

dsanabria

Quite Involved in Discussions
We just performed our Nadcap audit for composites:

Here is the finding:

Requirement: 7.1 - Is tooling identified and referenced in the work instructions for traceability?

Finding: Reference Part 141N8631Y103, Job 120665ANX, Op 260. A clear, plastic template was used to locate a stiffener in the center of the metal bond lay-up. The template had no identification of any kind. Because there is no evidence the template was ever inspected it cannot be determined if the stiffener is properly located. An audit of the final inspection operation for the part revealed that the location of the stiffener is not verified.

Is a composites/metal bond scope to AC7118. The thing is that the auditor made this a major finding. The item not identified is used as a shop aid.

Our question is: Should this have been a major finding?
Although we agree that there is room for improvement here it does not justify a complete breakdown of the product or impact to product?

We are thinking about getting PRI to change this finding to a minor but we are new at this. Any help or ideas will be appreciated. Thanks

Time to call the technical adviser and challenge the level of the finding which does not meet the criteria of major finding. :confused:
 
A

andygr

From the finding stated above I have underlined the key items below
Finding: Reference Part 141N8631Y103, Job 120665ANX, Op 260. A clear, plastic template was used to locate a stiffener in the center of the metal bond lay-up. The template had no identification of any kind. Because there is no evidence the template was ever inspected it cannot be determined if the stiffener is properly located. An audit of the final inspection operation for the part revealed that the location of the stiffener is not verified.

From what the auditor stated the location of the stiffener is not verified durring or after fabrication. I am sure that there is a design requirement for its location. This elevates it to a major finding since there is no verification of conformance to design that could be seen by the auditor.

:2cents:
 

dsanabria

Quite Involved in Discussions
From the finding stated above I have underlined the key items below
Finding: Reference Part 141N8631Y103, Job 120665ANX, Op 260. A clear, plastic template was used to locate a stiffener in the center of the metal bond lay-up. The template had no identification of any kind. Because there is no evidence the template was ever inspected it cannot be determined if the stiffener is properly located. An audit of the final inspection operation for the part revealed that the location of the stiffener is not verified.

From what the auditor stated the location of the stiffener is not verified durring or after fabrication. I am sure that there is a design requirement for its location. This elevates it to a major finding since there is no verification of conformance to design that could be seen by the auditor.

:2cents:

Base on the following statement - a FAIR was performed and product was not affected - no complaint from customer - I presume :notme: life is good - time to challenge the auditor and your process.

"Is a composites/metal bond scope to AC7118. The thing is that the auditor made this a major finding. The item not identified is used as a shop aid.

Our question is: Should this have been a major finding?
Although we agree that there is room for improvement here it does not justify a complete breakdown of the product or impact to product?

We are thinking about getting PRI to change this finding to a minor but we are new at this. Any help or ideas will be appreciated. Thanks
 
A

andygr

NIP -07-02 para 5.7 coveres why this was clasified as a major
You can log in to eauditnet and see this document.

The finding is against the question and since the tool was not identified then it does not comply with "Requirement: 7.1 - Is tooling identified and referenced in the work instructions for traceability?" since it is stated that the tool is not identified.

Now as part of the review of the condition noted the auditor added additional detail on the situation. You might get the identification issue against 7.1 changed to a minor finding but the added information addressing if the part does or does not meet design will just be moved to another question by the staff engineer ( which he has the right to add finding based on supplied information)such as 8.1.1 or 11.3.2 or 11.3.15
Then you will have 2 findings instead of one to address with the staff engineer and one of them will still be a major.
I would go with one finding over two any day of the week with Nadcap since the work to close them is the same for major vrs minor. The only time it realy makes a differance is if it would impact the criteria for failure.
:2cents:
 
Thread starter Similar threads Forum Replies Date
S Latest Nadcap AC 7102 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Missed uploading a NADCAP HT checklist Nonconformance and Corrective Action 1
bryan willemot Looking for NADCAP audit Excel spreadsheets template for vendors, specifically heat treat (Vacuum Furnace) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
S Nadcap - Heat Treatment Proof of Verification question for Digital results AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
J NADCAP Root Cause - Misinterpretation of Checklist Requirement Various Other Specifications, Standards, and related Requirements 5
B NADCAP Rejection Response to Root Cause Analysis and Corrective Action. Nonconformance and Corrective Action 1
J NCR- Failure of contract review process - NADCAP audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
N Nadcap AC7101/2 Rev. E Section 3.2 - Nonconformance AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
blackholequasar Looking into Nadcap for the first time AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
A Nadcap Accreditation Fee AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
M NADCAP mentoring program AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
S NADCAP approval for Conventional Machining and Chemical processes - need assistance AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
DuncanGibbons How does AS 9100D correlate or differ from NADCAP accreditation? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
B AS9100 - Are special process suppliers required to be NADCAP accredited? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 15
N Responding to NADCAP nonconformance - Control of External Documents AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
Q NADCAP NDT (specifically RT) - Calibration of eye loupe reticle & optical comparator AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
J NADCAP - Supplier Special Processes Certifications Manufacturing and Related Processes 1
Q NADCAP NDT (specifically RT) - Checklist AC7114 Rev. K, section 8.1.3 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
M NADCAP Chemical Processing: Question about testing sub-contractor requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
S Nadcap HT Auditor Advisory 17-003 Advice needed AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
S Double Thermocouple - Two types, same sheath (AMS2750/Nadcap) Manufacturing and Related Processes 9
I NADCAP In Manufacturing Facility with Small Laboratory - Measurement & Inspection AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
R NADCAP AC7108 - Tank Ambient Room Temperature Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
A Is it required to have first AS9100 before obtaining Nadcap? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
H NADCAP Audit Nonconformances - Vacuum Furnace Load Sensors AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
A Where can I find the NADCAP Audit Criteria for all the processes? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A Future as an AS9100/NADCAP Auditor AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
E Nadcap Major Audit Finding Question - Effectiveness of our RCCA AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
O NADCAP AC 7108 - Subcontractor Laboratory Certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
J Zinc Plating Process NADCAP Certification Guidance please AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
D Nadcap Certification for Soldering Iron? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
D Nadcap Certification for Printed Boards Assemblies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
J Nadcap Processor PO (Purchase Order) Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
S Implementing TS16949 from AS9100 and NADCAP Other ISO and International Standards and European Regulations 7
T Nadcap AC7004 - Going for AS9100? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
N Basic requirements and steps involved to get NADCAP Certification AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
JoCam NADCAP Initial Audit Cancellation AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
O NADCAP Nonconformance for Timer not used for Time period AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
Kronos147 Nadcap AC7112 & AC7112/3 requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
M Does 17025/NADCAP allow deferring Calibration Start Dates on Gages which are Stored? ISO 17025 related Discussions 10
S AS9100 and Nadcap vs. NAS412 (FOD program) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
K Nadcap (AC7107/7 C, paragraph 6.1.b) NCR - Machining Tensile Specimens AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
P NADCAP Certified - Heat Treat Continuous Belt Driven Oven question AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A NADCAP AC 7101/03 Heat Treatment Process Acceptance Tests AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
L Are Outside Calibration Companies required to NADCAP Certified? General Measurement Device and Calibration Topics 6
J Nadcap finding Inadequate Procedure and Inadequate Root Cause Analysis Nonconformance and Corrective Action 4
JoCam Nadcap AC7120 (Audit Criteria for Circuit Card Assemblies) - Acceptance Criteria AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
B What are the basic Nadcap certification requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
JoCam NADCAP AC7120 Rev A to B Documented Procedures Requirements Changes AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
C Major NADCAP Magnetic Inspection Nonconformance - How to answer it? Nonconformance and Corrective Action 2

Similar threads

Top Bottom