That is why my NCM report has a spot to check if ca is required.
I agree Carol (sidney aslo) we complete our NCR with the disposition and then if the manager deems it necessary he raises a CA to investigate deeper into the cause of the issue (or several that seem linked)
 
Elsmar Forum Sponsor
G

gutquality

#22
No where in standards tells you how specifically you should setup the system, all they want is that you comply to it. Best process put for this is to have everything in one form if possible. Nonconformity, disposition, correctinve action. Sometimes the Car is by your company and sometimes by outside source(vendor, supplier). As long as you state what you are doing with this form and what you're using for in your companies procedure explaining the outcome of your process , than you will comply with the standard. Remember the standard is there just to guide you and not to set rules on how to perform it, you just need to comply. Good luck.
 
S

Satch

#23
I may be a little late to the conversation but what I'm looking for is a standard generic NCR form I can use that can also include the MRB actions to be taken...an all-in-one...any ideas on where I can look?

:thanx:
 
A

AirdrieQPA

#24
We use two forms at my company. I had tried to incorporate one form, but my manager does not like the idea, how ever, the MRB is in fact very different than an the NCR. We also used to have three forms, a Nonconformance Report, A Corrective Action Report and the MRB form. When I came on board I believed that that was silly, I am a retired Airforce member, and was a flying Tech crewman and had to rely on taking as little as possbile, but the small amount I could store had to do as much as possible and repair as much as possible, otherwise I was in trouble when I was somewhere on the other side of the world. I blended the NCR and CAR report, and it became the our NCAR report, with an MRB block, my boss found that too radical so we have an NCAR report and the MRB form. I have now been able to slide an RCA block into the form with out much protesting, and I am now trying to introduce another major change to the form. I was successful in adding xreference blocks into the NCAR, where I could record my sources of investigative information. IE: Engineering Reports, ECO's, Audit Reports, Test records, Customer complaints etc. I did this as is speeds up time, this way on one form, I have documented where I am pulling my information from wrt to the NCAR. My biggest hurdle at the moment is trying to teach my boss the difference between Corrective action and preventative action.

This is my first response, sorry for the bable, but if you can do it with the least amount of forms and reports but be able to keep it simple but at the same time collect the most information then the form will be used more readily.
 
A

AirdrieQPA

#25
I may be a little late to the conversation but what I'm looking for is a standard generic NCR form I can use that can also include the MRB actions to be taken...an all-in-one...any ideas on where I can look?

:thanx:
If I can get my bosses permission, and if I am allowed to post here, I can provide a sample of our NCAR form for your examination. Can anyone tell me if this is allowed?

Or you can post your email addy here and I will remove our branding and send it too you.

Does that work?
 
J

Joelbear5

#26
In our system we use one form for product non-conformances. Just one NCR form. I don't understand why one would need an MRB form. The Material Review Board is just a group of people, and the results of that meeting should be the Corrective Action. Our NCR form includes the problem description, MRB team, disposition (and temporary remedial instructions), root cause, and corrective action. The problem description can be filled out by anyone, and given to their manager. The disposition can be signed off before the Corrective action is finished in order to speed up the process.

I am, however, thinking of splitting it up into two forms (NCR and CAR). The NCR would only have problem description and disposition. If corrective action was required, it would move on to the CA process. We also have to capture audit non-conformances and process non-conformances. Currently the CAR form is used for this, but if I split the NCR form up, I'll split the CAR form as well, so two forms for capturing problems (product non conformances and process non conformances) will segue into one CA form.
 

Wes Bucey

Quite Involved in Discussions
#27
In our system we use one form for product non-conformances. Just one NCR form. I don't understand why one would need an MRB form. The Material Review Board is just a group of people, and the results of that meeting should be the Corrective Action. Our NCR form includes the problem description, MRB team, disposition (and temporary remedial instructions), root cause, and corrective action. The problem description can be filled out by anyone, and given to their manager. The disposition can be signed off before the Corrective action is finished in order to speed up the process.

I am, however, thinking of splitting it up into two forms (NCR and CAR). The NCR would only have problem description and disposition. If corrective action was required, it would move on to the CA process. We also have to capture audit non-conformances and process non-conformances. Currently the CAR form is used for this, but if I split the NCR form up, I'll split the CAR form as well, so two forms for capturing problems (product non conformances and process non conformances) will segue into one CA form.
Food for thought:
"Sometimes," the MRB determines the original NCR was not valid. Usually, a good MRB report details the root cause investigation,while most NCR do not. Further, MRBs are usually empowered to work out "compromises" having to do with rebates, refunds, discounts, use-as-is, etc. regardless whether the MRB organization is the aggrieved party [customer] or supplier. The last part is one of the main advantages of having cross-functional MRB teams.
 
C

cbehrens

#28
Be a little carefull! In some sectors (including Aerospace and Defense) MRB indicates the authority to internally authorize the shipment of non-conforming material to the customer without authorization. The term MRB has a different meaning. Make sure you know what your customers think MRB means. I have several customers that do not delegate MRB authority to our organization.
 
Thread starter Similar threads Forum Replies Date
Q ECR (Engineering Change Request) or NCR (Nonconformance Report) in Fabrication? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
S Is an 8D Report and a NCR (Nonconformance Report) the same? Nonconformance and Corrective Action 10
N NCR (Nonconformance Report) Combined with Corrective Action Report? Nonconformance and Corrective Action 1
B Format for Discrepant Material Report (DMR) - Nonconformance Report (NCR) Document Control Systems, Procedures, Forms and Templates 1
C NCR (Nonconformance Report) Root Cause - Cause Code AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
D AS9101D Clause 4.2.2.5 NCR (Nonconformance Report) Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 23
K NCR (Nonconformance Report) - Basic questions - When should an NCR be filled out? Nonconformance and Corrective Action 5
G NCR (nonconformance report) tracking and database help Nonconformance and Corrective Action 6
W NCR (Nonconformance Report System) Home Made Database or Software Recommendation Quality Assurance and Compliance Software Tools and Solutions 7
E NCR (Nonconformance Report) for device defects - Hot rolled coils Nonconformance and Corrective Action 1
J Is the NCR (Nonconformance Report) Confidential? Nonconformance and Corrective Action 27
W List of NCR (NonConformance Report) Defect Cause & Corrective Action Codes Nonconformance and Corrective Action 18
H NCR (Nonconformance Report) - External customer - Seeking Advice Nonconformance and Corrective Action 9
A Issuing Countermeasure Report - Does every nonconformance identified require an NCR? Nonconformance and Corrective Action 2
C NCR (Nonconformance System) Software Nonconformance and Corrective Action 7
qualprod When to write up a nonconformance and require a NCR - We produce labels ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
K NCR or CA? We're taking any issue we have and saying its a nonconformance Nonconformance and Corrective Action 11
R How do you perform verification of a NCR (Nonconformance)? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
W Process Effectiveness NCR's (Nonconformance Reports) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
L Audit Nonconformance - NCR because we exclude Design and Development ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
T Tracking NCR's (Nonconformance Reports) Nonconformance and Corrective Action 2
K My question is, what/when is a nonconformity? Therefore what requires an NCR? Nonconformance and Corrective Action 9
L How to write a proper defect description in a NCR Nonconformance and Corrective Action 4
B How to reply NCR on ineffectiveness of corrective action during IATF external audit? This is repeated issue whereby some mistake was done. IATF 16949 - Automotive Quality Systems Standard 7
M Issuing NCR for improper method statement submissions Internal Auditing 10
A Scrap is NCR or not - What regulation ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 33
Q Interaction of Processes IOP NCR Process Maps, Process Mapping and Turtle Diagrams 7
W Surveillance report along side an NCR program Nonconformance and Corrective Action 2
A NCR, NCMR, CAPA, Deviations - Medical Device Distributor Nonconformance and Corrective Action 2
D Can an AS9100 auditor issue an NCR a month after the audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
K AS9100 - No NCR's or CA's during Stage 2 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
W IATF 16949 Clause 6.1.1 - My first Major NCR (Management Review) IATF 16949 - Automotive Quality Systems Standard 57
S Re-validation NCR - In which cases re-validation of processes is required Oil and Gas Industry Standards and Regulations 6
Pancho United Airlines NCR Nonconformance and Corrective Action 43
Q Practical Way to raise NCR's in an Assembly Workshop ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
W NCR Performance KPI Monitoring in an Industry like Construction Nonconformance and Corrective Action 1
A ISO/TS 16949 - Sharing Certification Audit Report (NCR's) with the Customer IATF 16949 - Automotive Quality Systems Standard 8
N Any comment, if a supplier raise an NCR to the Client? Oil and Gas Industry Standards and Regulations 5
W Auditor Remorse for not issuing an NCR AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
Q Criteria for not rising NCR's in 8.3 of ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
I NCR for Customer not updating their drawings AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
N New to ISO 9001 - NCR for every defect? Nonconformance and Corrective Action 5
B Combining a CAR, an NCR, and an Accident Report ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
K Validity of Using NCR's to evaluate Performance Nonconformance and Corrective Action 7
P Differences between an NCR and CAR Internal Auditing 9
N NCR and CAPA in the FMCG (Fast Moving Consumer Goods) Industry Nonconformance and Corrective Action 1
T Do Customer Returns = NCR and CAR? Nonconformance and Corrective Action 5
K Nadcap (AC7107/7 C, paragraph 6.1.b) NCR - Machining Tensile Specimens AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
L How to track the NCR (Quality Notification, Services Notification) Nonconformance and Corrective Action 2
F AS9100 Management Review NCR help - Output of the MR is not Adequate AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5

Similar threads

Top Bottom