Hi All,

Thanks in advance for any suggestions/advice you can offer. I'm in a small (30 of us) all-CNC machine shop. We do no design work as we produce to customer samples or sketches/drawings. Post-delivery activities are also non-applicable. Often we generate drawings from samples, and sketches/drawings often have missing/incorrect specifications. We have ISO-9001:2008 at the request of one customer and are transitioning to 2015.

First piece inspections are performed and any out of tolerance or near the edge of tolerance dimensions are corrected by adjusting the CNC program. This corrects the condition and only once have I seen a third piece submitted for inspection. In-process rejections rarely happen, and as many of our customers will accept out-of-tolerance since the parts will function for their need. Often this is done verbally and undocumented.

As for customer complaints and returns (a rare occurrence), I don't always get to see them and have explained that these need to be documented so we have a baseline and can show improvement. Still an uphill battle.

I'm at a loss on how to show continuous improvement considering the extremely low rejection rate and any in-process rejections are brought to the GM who often OK's the parts in question, as he knows the application of the parts from the customer. NCR's are few and far between. Corrective Actions usually come from the CB or one customer when they were on-site before my arrival.

I was brought in (as the QM by title) primarily to be the Management Representative and ISO SME. We did well on the surveillance audit and I'm finding it difficult to determine manufacturing KPI's and opportunities for CI. Some will need to come from top management.

I currently track First Piece first-time pass rate, Internal and External NCR's and customer complaints as KPI's and with very low numbers, it's not going to be easy showing improvement. Has anyone any suggestions for opportunities for CI which I can run with on my own, as support in effecting the QMS is more infrequent than an NCR?
 
Elsmar Forum Sponsor

Golfman25

Trusted Information Resource
#2
Hi All,

Thanks in advance for any suggestions/advice you can offer. I'm in a small (30 of us) all-CNC machine shop. We do no design work as we produce to customer samples or sketches/drawings. Post-delivery activities are also non-applicable. Often we generate drawings from samples, and sketches/drawings often have missing/incorrect specifications. We have ISO-9001:2008 at the request of one customer and are transitioning to 2015.

First piece inspections are performed and any out of tolerance or near the edge of tolerance dimensions are corrected by adjusting the CNC program. This corrects the condition and only once have I seen a third piece submitted for inspection. In-process rejections rarely happen, and as many of our customers will accept out-of-tolerance since the parts will function for their need. Often this is done verbally and undocumented.

As for customer complaints and returns (a rare occurrence), I don't always get to see them and have explained that these need to be documented so we have a baseline and can show improvement. Still an uphill battle.

I'm at a loss on how to show continuous improvement considering the extremely low rejection rate and any in-process rejections are brought to the GM who often OK's the parts in question, as he knows the application of the parts from the customer. NCR's are few and far between. Corrective Actions usually come from the CB or one customer when they were on-site before my arrival.

I was brought in (as the QM by title) primarily to be the Management Representative and ISO SME. We did well on the surveillance audit and I'm finding it difficult to determine manufacturing KPI's and opportunities for CI. Some will need to come from top management.

I currently track First Piece first-time pass rate, Internal and External NCR's and customer complaints as KPI's and with very low numbers, it's not going to be easy showing improvement. Has anyone any suggestions for opportunities for CI which I can run with on my own, as support in effecting the QMS is more infrequent than an NCR?
Widen your focus. Look at your shop as a whole. Things like on time delivery, lead times and throughput. You have any bottle necks? Improve those. Get suggestions from the operators. Setup reduction is always a good one. Or robotic machine tending. Good luck.
 

normzone

Trusted Information Resource
#3
"Get suggestions from the operators"

The verbal approvals of nonconforming material by an SME are understandable, but may come back to bite you someday. Good luck with that one.

"Get suggestions from the operators"

Did I mention that the operators probably have some useful input?
 

Eredhel

Quality Manager
#4
You will likely have a unique QMS setup when it's all said and done and if you're a quality mindset person be prepared for some frustrations along the way :). But it's doable and you may be able to insert yourself into some things in the name of metrics, and that will help a lot. Look at what you and the others in your organization are doing and track it. Whatever "it" is. Maybe convince them to let you track out of tolerance acceptance on inspection forms for later use. Scrap and rework percentages are an easy way, if you can get into the process to start data for metrics later. Also don't be afraid to let the standard be the bad guy and drive some of what you need.

You're going to find you need to change 500+ things. But pick a handful and work at it. Keep that up and in a few years you'll be surprised how far they've come. I know this from experience :). I was employee #8, and now we're almost at 50.
 

SpinDr99

Involved In Discussions
#5
This is SUCH a unique operation. I tried tracking on-time delivery, but if a customer calls with a "must have" situation, it's common for setups to be broken down and a new job setup at almost any time. I've had operators complain that while working on one job, it's been interrupted 3 times for a "must have" call. Customers understand that, and it's a given that customer planning has much to be desired. One of our biggest strengths is that we're very responsive to their needs.
 
Last edited:

SpinDr99

Involved In Discussions
#6
Operators just go with the flow. Keeps the customer and management happy. Besides, some operators are little more that "button pushers" and not true machinists.
 
Last edited:

SpinDr99

Involved In Discussions
#7
Eredhel:

I've been letting the CB Auditor be the bad guy explaining that in-process needs to be done (an Observation during their initial certification audit), and parts/criticality/quantities vary so much that we've scrapped sampling. It wasn't happening according to the plan, so as long as we're doing SOMETHING, it's not a nonconformity. I explain what I need to have to show the auditor or "What will you tell the auditor when they ask about the low rejection rate? Nobody's THAT good."

Things are so loose here, I can't get operators to do PM on the machines (not that they knew what "PM" was before I got here), so it's being delegated to Lead/Setup people. I try to use the logic that it will prevent or at least lessen breakdowns and downtime.

Tracking out of tolerance acceptance occurrences can't happen if I don't know about it. Good thought, and I tried that but soon realized they're still in pre-ISO mode. Check with the boss and do what he says.
 

normzone

Trusted Information Resource
#9
Yeah, small shops come with their own fun.

Operators cut a bunch of pieces and select the best one for the "first article" sample verifying it's okay to do the run.

On Time Delivery is important - track it publicize it, and track the top five or so reasons why it didn't happen. Report it honestly, don't try to hide any thing or shield anybody. No blame required - explain to your crew that these are common issues every shop has and that the numbers are what they are. If somebody decides to improve the process you'll have data to support that, or the same data can show your auditor that it's no big deal and not worthy of drama.

Re the requirement for in process inspection, I understand it as a QA guy but what it the external auditor's point of view regarding it being necessary? Did they quote chapter and verse from the standard, or do they just want it ?
 

Golfman25

Trusted Information Resource
#10
This is SUCH a unique operation. I tried tracking on-time delivery, but if a customer calls with a "must have" situation, it's common for setups to be broken down and a new job setup at almost any time. I've had operators complain that while working on one job, it's been interrupted 3 times for a "must have" call. Customers understand that, and it's a given that customer planning has much to be desired. One of our biggest strengths is that we're very responsive to their needs.
So what. How do all those "break ins" affect your on-time delivery? Lots of improvement opportunities right there.
 
Thread starter Similar threads Forum Replies Date
L Do I need a Procedure for Continuous Improvement (CI)? Preventive Action and Continuous Improvement 8
D What evidence to I need to supply as a remote location in relation to manufacturing sites? IATF 16949 - Automotive Quality Systems Standard 10
T Non API products need to comply to API Q1? Oil and Gas Industry Standards and Regulations 3
G Need journal and reference of abnormal bar chart SPC Statistical Analysis Tools, Techniques and SPC 3
MSeibert47 Daily Quality Topics - Need Ideas Please! Food Safety - ISO 22000, HACCP (21 CFR 120) 15
W Do Reference materials for IATF need to be 17025? IATF 16949 - Automotive Quality Systems Standard 15
D Need some Help on 8D fault tree analysis Problem Solving, Root Cause Fault and Failure Analysis 6
A Need to calculate tolerance Intervals with a set of non-normal data and 3-Parameter Weibull distribution Using Minitab Software 0
Melissa Risk Management Process, How far do I need to go? ISO 14971 - Medical Device Risk Management 10
F Need Quality Manager advice. Quality Manager and Management Related Issues 6
T Do we need an SOP for ISO 9001? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
B Do CTQs need to be equipment specific? FMEA and Control Plans 8
K Contract Manufacturer Do they need a complaint procedure? Medical Device and FDA Regulations and Standards News 8
K Screen printing ink and machine selection_ Need help Manufacturing and Related Processes 6
D Do employee training records need to be centralized? IATF 16949 - Automotive Quality Systems Standard 10
H Need of EU Representative Designation for Turkey? EU Medical Device Regulations 3
H If we use agile - do we still need to document TF as a waterfall just for the notified bodies need? IEC 62304 - Medical Device Software Life Cycle Processes 2
briteme4 AS9102 First Article Inspection - do I need a second reviewer and signer? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
J Furnace repaired - Do I need a new initial TUS? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B Does FDA Registration QSR need to cover non-medical devices for contract repackager? US Food and Drug Administration (FDA) 1
S Need ISO 15189:2012 Documentation toolkit. Document Control Systems, Procedures, Forms and Templates 0
J Need a contract monitoring Tool General Information Resources 0
P UDI-PI requirements on reusable surgical device, do we need serialisation? ISO 13485:2016 - Medical Device Quality Management Systems 3
J Need Help with FPY Data in Assembly Process Manufacturing and Related Processes 7
W 17025 and NIST handbook relationship (need advice) ISO 17025 related Discussions 8
lanley liao Does all of the suppliers need to integrated into the supplier list qualified of the company? Oil and Gas Industry Standards and Regulations 2
K Need procedure for D&D inputs? ISO 13485:2016 - Medical Device Quality Management Systems 4
S Need help on "Country of Origin" Medical Device and FDA Regulations and Standards News 0
Ed Panek Immediate need for 80601-2-56 Consulting expert. PM me for details Career and Occupation Discussions 0
Tagin You're Gonna Need a Bigger Root Cause Coffee Break and Water Cooler Discussions 12
M PSA Suppliers - CSR matrix and need the quality manual of PSA APQP and PPAP 6
M Need Help With Information Security Asset Risk Register IEC 27001 - Information Security Management Systems (ISMS) 2
K Interesting Discussion "World Class Product" based QM. I need advice. Quality Management System (QMS) Manuals 14
I Do I need to sign off my annual audit calendar? Internal Auditing 2
P Do we need to retrospectively use the "MD" symbol (indicating device is a medical device) on labels, e.g. finished devices within expiration date? EU Medical Device Regulations 2
M Do I need separation in my circuit with a medical charger? IEC 60601 - Medical Electrical Equipment Safety Standards Series 0
V Certified Auditor - Need of additional certification specific to industry ( GMPs) ASQ vs ECA vs others Professional Certifications and Degrees 1
D Low risk IVD study in the UK, do I need MHRA approval? UK Medical Device Regulations 1
A Medical Device Contract Manufacturer - Does the CM need to register with FDA? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
J Records Control - Does each individual record need to be numbered? Records and Data - Quality, Legal and Other Evidence 2
N Is there a need for clinical test of Class IIa products (for MDR)? EU Medical Device Regulations 2
J Do Software Subcontractors need to be ISO13485 compliant in the EU? EU Medical Device Regulations 3
K Do I need a "State of the art" plan? CE Marking (Conformité Européene) / CB Scheme 1
S Need advice for schooling Quality Manager and Management Related Issues 5
R What information do i need to get from the device manufacturer 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 0
S Need guidance on project ISO 13485:2016 - Medical Device Quality Management Systems 2
H Need MSA 4th ed. compliant attribute MSA template General Measurement Device and Calibration Topics 4
J Need Change Control Yes/No Decision Tree Template ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
C Does an accessory need an IFU if it use is discussed in the Parent device IFU? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
B Countries with no need for FSC (Free sales certificate) Other Medical Device Regulations World-Wide 0

Similar threads

Top Bottom