New AIAG Special Molding Assessment CQI-23

xfngrs

Quite Involved in Discussions
#1
I received notification from AIAG that they have a new CQI special assessment. Yea! - Never see those. :sarcasm: Anyway, has anyone heard any rumors that any of the OEMs are going to require this as they do so many of the other CQIs? I didn't find anything on the IATF website.

Thanks,
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#3
It's here at the AIAG site for those interested. Although I don't know anything specific, I do know that AIAG wouldn't have developed it if it weren't for the OEMs wanting it in place, so I would be surprised if it weren't being required of automotive molding shops in the near future.
 
A

AgrussoQSE

#4
First off - yes, the CQIs are all customer requirements....to consider. This is where the IATF Rules for auditor / certification will point an organization to "customer requirements" have been reviewed.

Mostly it's: "Does not apply" or "yup, applies, already got it covered" (if you know your business)" or "wait! What!? What's CQI-XX" I need to review / assess THAT one [to be sure]"

I can report the above because I just sat through a Stage 1 readiness review audit for ISO/TS certification. From the audit, I had to give evidence of CQIs that SO apply.

NOW - I work in plastic-extrusion, blow-molding of plastic resins (HDPE & EVOH); Does CQI-23 apply to this business?



Thanks for the assist
 
A

AgrussoQSE

#5
BTW, I do like the idea of a 'canned' format by AIAG to assess the CQIs. Beats me spending the time to create an assessment form or cover-letter of sorts. Might be worth the time to check it out (if the price is right).
 

xfngrs

Quite Involved in Discussions
#6
Thanks all for the input. As to if it applies, we do have a molding process, but I don't know if it is blow-molding. I'll have to ask the design engineer.
 
H

Hopesmommy

#7
It is an AIAG specific quality manual. It is referenced in the Chrysler specific section of TS. It was just added in August 2014.
I don?t know what is in the document but I assume the supplier can order it from AIAG.
We just learned about it recently.
 

Keith Childers

Quite Involved in Discussions
#8
IATF has posted new GM Customer Specifics, effective January 2015, which includes the addition of CQI-23.

4.1.15 Plastics Molding Processes

Clause 8.2.2.2 of ISO/TS 16949:2009 requires that the organization shall audit each manufacturing
process to determine its effectiveness. Applicability and effectiveness of plastics molding processes
shall be determined utilizing the most current version CQI-23 Special Process: Molding System
Assessment (CSA), published by AIAG, and records maintained. The effectiveness evaluation shall
include the organization?s self-assessment, actions taken, and that records are maintained.
This requirement shall also apply to molding suppliers to the organization pursuant to ISO/TS
16949:2009 Clause 7.4.1.2 (supplier development clause).

NOTE 1: 2nd Party assessment by a competent auditor and meeting the above requirements will satisfy
the self-assessment requirement.

NOTE 2: Implementation effectiveness should be based on evidence that the organization has a
process in place that includes elements such as auditors identified, schedule for self-assessment in
place including schedule adherence, supplier development process identified for applicable suppliers,
monitoring of progress, defined corrective action process and record-keeping.
 
M

Mike Murphy

#9
Unlike most other additions/ammendments to the Customer Specific Requirements GM is requiring that this special process assessment is implemented immediately. Essentially, you have to have this implemented and in-use between the release of CQI-23 and your upcoming TS surveillance/re-certification audit date. So, for those of you who have external TS audits coming up soon you better get moving. Registrars ARE auditing to this and are expecting to see outputs from the assessment.
 
T

trainerbob

#10
The people that I deal with in the injection molding business on a regular basis tell me that both Chrysler and GM are requiring CQI-23 assessment these days and expect all auditors to be able to handle that part of the business in the same manner they treat any other special processes.
 
Thread starter Similar threads Forum Replies Date
D AIAG FMEA 4? Ed. Explanation: Relationship between PFMEA and Special Characteristics FMEA and Control Plans 8
Audit Monkey Autocorrelation and special cause variation in the AIAG SPC manual Statistical Analysis Tools, Techniques and SPC 15
Stijloor Special Process Training from AIAG Training - Internal, External, Online and Distance Learning 0
Stijloor New Special Process Guidelines are now available from AIAG IATF 16949 - Automotive Quality Systems Standard 18
D HT2005 - AIAG Document - Ford heat treaters - Special Processes Various Other Specifications, Standards, and related Requirements 4
Anerol C Gage R&R Template AIAG 4th Edition IATF 16949 - Automotive Quality Systems Standard 3
J Which OEM or customers are now requiring the new AIAG/VDA FMEA format? FMEA and Control Plans 0
C AIAG/VDA FMEA - Is the new better? FMEA and Control Plans 0
A PFMEA new AIAG FMEA and Control Plans 0
P VDA AIAG FMEA - Slides for Quality Audience FMEA and Control Plans 4
B AIAG/VDA’s FMEA Manual Is a Major Advance (my take on this subject) FMEA and Control Plans 2
B AIAG-VDA FMEA - When the new format will be required FMEA and Control Plans 5
M How to complete structure Analysis and Function analysis sections' columns of AIAG-VDA DFMEA form FMEA and Control Plans 0
bobdoering Informational New AIAG PFMEA Process - Excel Template Attached FMEA and Control Plans 23
C FMEA Process assessment In the Draft for the AIAG/VDA FMEA Manual is gone FMEA and Control Plans 0
S AIAG CQI Auditor Qualification and 3rd Party Certification Requirements General Auditing Discussions 2
K AIAG/VDA FMEA & Process Control Plans FMEA and Control Plans 0
D FMEA-MSR in the AIAG-VDA Aligned Handbook - What is it? FMEA and Control Plans 4
bobdoering AIAG VDA FMEA Handbook - 2019 - something familiar about this.... FMEA and Control Plans 37
S New AIAG FMEA Process - How to complete the new format FMEA and Control Plans 32
C Detection Action for Failure Effects - AIAG 4th Edition Layout FMEA and Control Plans 5
S I have just purchased the all new Core Tools Software (CTS) from AIAG IATF 16949 - Automotive Quality Systems Standard 37
J AIAG PPAP: 2.2.11.3 Acceptance Criteria for Initial Study (page 9, 4th edition) APQP and PPAP 1
M Is there a published List of AIAG members requiring IATF certification ? IATF 16949 - Automotive Quality Systems Standard 2
A The FILE recommended by AIAG MSA 4ed for LINEARITY Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 0
I AIAG 2018 Quality Summit - Is it worth it? IATF 16949 - Automotive Quality Systems Standard 3
C AIAG's IATF 16949 section 7.1.5.1.1 - Torque MSA Requirement Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10
G AIAG FMEA - Major customers of the FMEA process FMEA and Control Plans 3
R Information on the roll out of the new harmonized DRAFT FMEA AIAG/VDA manual IATF 16949 - Automotive Quality Systems Standard 4
G ANOVA GR&R: Minitab vs AIAG MSA results Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 7
H Prerequisites for AIAG APQP/PPAP Certification Exam Training - Internal, External, Online and Distance Learning 2
xfngrs What are the VDA equivalents to AIAG manuals? VDA Standards - Germany's Automotive Standards 1
Marc When will Revision 5 of the AIAG FMEA Manual be released? FMEA and Control Plans 93
S Pre-release version of the upcoming AIAG FMEA Revision 5 FMEA and Control Plans 1
C PPAP Rejection for "MSA-GR&R are not using the latest AIAG format" APQP and PPAP 9
kedarg6500 Excel Spreadsheet for AIAG Example wanted Excel .xls Spreadsheet Templates and Tools 3
N AIAG 4th ed. FMEA Manual "Fit" Changed to "Appearance" - Fit severity? FMEA and Control Plans 2
G AIAG CQI-Audits and Auditor Training ASQ, ANAB, UKAS, IAF, IRCA, Exemplar Global and Related Organizations 3
Z Failure Mode Identification in PFMEA according to AIAG FMEA Rev.4 FMEA and Control Plans 6
B New to Metrology and told to complete Gage R&R with AIAG compliant software Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 16
M Where to buy AIAG Manuals ASQ, ANAB, UKAS, IAF, IRCA, Exemplar Global and Related Organizations 2
S Service Parts PPAP AIAG Manual - Opinions APQP and PPAP 4
L AIAG B-10 Labeling Standard vs. VDA 4902 ASQ, ANAB, UKAS, IAF, IRCA, Exemplar Global and Related Organizations 2
O Any recommendations on good book on Control Plans besides AIAG? FMEA and Control Plans 3
Stijloor AIAG Layered Process Audit 2nd Ed. (CQI-8) is now available. IATF 16949 - Automotive Quality Systems Standard 1
K 4th Edition AIAG FMEA Occurrence, Severity and Detection Criteria for Plastics FMEA and Control Plans 1
E CQI-7T Form - AIAG Process Identification Tool 95-2000 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
D What is an AIAG Sustainability Report? Miscellaneous Environmental Standards and EMS Related Discussions 1
Q Is AIAG PPAP section 2.1 waiver a solution? APQP and PPAP 7
E What's the difference: AIAG-PPAP's "Significant Production Run" and "Run @ Rate"? APQP and PPAP 11

Similar threads

Top Bottom