Non-Conformance Report for Concession

MarcM

Registered
#1
Hi all,

First post and a quick question.

Is it normal practice to write a non-conformance report for any supplier parts received on a customer approved Concession?

Thanks

MM
 
Elsmar Forum Sponsor

Sidney Vianna

Post Responsibly
Staff member
Admin
#2
If there was a concession/waiver, chances are the part was nonconforming, thus, yes, someone should have identified the nonconforming situation, typically the supplier, with the AS-IS condition, in support of the request for concession.

Welcome to The Cove.
 

MarcM

Registered
#3
If there was a concession/waiver, chances are the part was nonconforming, thus, yes, someone should have identified the nonconforming situation, typically the supplier, with the AS-IS condition, in support of the request for concession.

Welcome to The Cove.
Thank you :)

Looking at it from another point of view. Since the Concession states the new condition of the part (although it is non-conforming to the original print) and it has been signed by the relevant parties, doesn't that now make the part conform to this new "IS" requirement on the Concession? and therefore is not Non-Conforming? Just a thought...
 

Sidney Vianna

Post Responsibly
Staff member
Admin
#4
doesn't that now make the part conform to this new "IS" requirement on the Concession? and therefore is not Non-Conforming? Just a thought...
Not sure if there is a hidden agenda here.

The ISO 9000 definition of concession:
permission to use or release a product or service that does not conform to specified requirements.

If the part were conforming, that would not be a need for a concession.

If the "AS-IS" condition is acceptable for a limited run, the concession should specify the limitation. If the "AS-IS" condition is good forever, the product specification should be revised accordingly.
 

Golfman25

Trusted Information Resource
#5
To me you either go down the concession branch or the non-conforming branch. If it's a concession it's usually proactive. A problem was noticed and rather than fix, the product is used with the defect. It is fixed at a later time. If it's non conforming, you need to fix it and do root cause analysis and corrective action. Sometimes you might do both.
 

MarcM

Registered
#6
Not sure if there is a hidden agenda here.

The ISO 9000 definition of concession:
permission to use or release a product or service that does not conform to specified requirements.

If the part were conforming, that would not be a need for a concession.

If the "AS-IS" condition is acceptable for a limited run, the concession should specify the limitation. If the "AS-IS" condition is good forever, the product specification should be revised accordingly.
To me you either go down the concession branch or the non-conforming branch. If it's a concession it's usually proactive. A problem was noticed and rather than fix, the product is used with the defect. It is fixed at a later time. If it's non conforming, you need to fix it and do root cause analysis and corrective action. Sometimes you might do both.
Fair point. I was under the same mindset but thought there might be a different view point. So, a concession identifies non-conforming part which means a non-conforming report must be generated.
 

Golfman25

Trusted Information Resource
#7
Fair point. I was under the same mindset but thought there might be a different view point. So, a concession identifies non-conforming part which means a non-conforming report must be generated.
NO, not necessarily.

Example. I have a part made in 304 Stainless steel but I can't find material for it. I can get 316 SS which is an upgrade in most cases. I can get a concession for the material switch on this order and go back to 304 next time. There was nothing non-conforming about it.

Or, I am making a part that just doesn't want to come into spec. Let's say it will take a lengthy tooling/machine repair. I can ask for a concession to allow the out of spec condition on this order to give me time to fix the tooling/machine for the next order. Maybe I issue a non-conformance or Corrective action, maybe not.

As distinguished by, I found a defect in final inspection (or the customer found it). I can issue a non-conformance, corrective action, and all of that. In the meantime, I can also maybe get a concession to use as is for now.

So short answer is "It Depends."
 

MarcM

Registered
#8
NO, not necessarily.

Example. I have a part made in 304 Stainless steel but I can't find material for it. I can get 316 SS which is an upgrade in most cases. I can get a concession for the material switch on this order and go back to 304 next time. There was nothing non-conforming about it.

Or, I am making a part that just doesn't want to come into spec. Let's say it will take a lengthy tooling/machine repair. I can ask for a concession to allow the out of spec condition on this order to give me time to fix the tooling/machine for the next order. Maybe I issue a non-conformance or Corrective action, maybe not.

As distinguished by, I found a defect in final inspection (or the customer found it). I can issue a non-conformance, corrective action, and all of that. In the meantime, I can also maybe get a concession to use as is for now.

So short answer is "It Depends."
That is kind of what I was thinking of along the lines of originally.

If a concession is approved with an "IS" condition, doesn't that become the "new" standard the part has to adhere to for the purpose of that concession? I mean its still deviating from the original type data but its conforming to the new agreed condition so does that make it conforming enough to not generate a Non-Conforming Report?
 

Ian_Morris

Involved In Discussions
#9
What an interesting discussion.

For my £0.02 it really depends on the reason that the concession is required and whether it was in your control or not.

Using the examples from Golfman, if you are using a material because your stock management was the cause, there is clearly a non-conformance in the process and that should be recorded and addressed, however if the issue is outside of your control, i.e. it is due to an urgent client requirement that does not allow for the ordering profile it would not be. Where a machine will not make the part, then there is a clear non-conformance as either the process is not stable enough to produce the part and this should have been identified in the planning phase, or there is a defect with the machine that could indicate a problem with preventive maintenance schedules.

Clearly every case is different based on the merits of the circumstance, but that is why we have continuous improvement and corrective action processes to reduce variation and improve performance.
 
#10
What an interesting discussion.

For my £0.02 it really depends on the reason that the concession is required and whether it was in your control or not.

Using the examples from Golfman, if you are using a material because your stock management was the cause, there is clearly a non-conformance in the process and that should be recorded and addressed, however if the issue is outside of your control, i.e. it is due to an urgent client requirement that does not allow for the ordering profile it would not be. Where a machine will not make the part, then there is a clear non-conformance as either the process is not stable enough to produce the part and this should have been identified in the planning phase, or there is a defect with the machine that could indicate a problem with preventive maintenance schedules.

Clearly every case is different based on the merits of the circumstance, but that is why we have continuous improvement and corrective action processes to reduce variation and improve performance.
Good point. It really does vary depending on situation.

Lets say it was decided not to write a Non-Conforming Report for the parts on Concession.
Parts are then stored in stock next to other conforming parts of same part number.
Parts are sent to production and during assembly/inspection it is noticed that these parts are "different" and as such scrutinized where it is determined that the parts are not conforming to print.
The part may then be put on a Non-Conforming Report, unless there is a process to look up that lot# in a Concession database and see if it came under a Concession. Otherwise you would need a method to identify Concession parts from good parts.

Now, if the parts on Concession were put on a Non-Conforming Report during receiving inspection, then that lot# would not be rejected again for same issue in production.

So question here is: should parts on Concession be put on a Non-Conforming Report regardless?
 
Thread starter Similar threads Forum Replies Date
N Non conformance Report to Risk Management-Plan ISO 14971 - Medical Device Risk Management 16
T Non Conformance Report Training Suggestions Training - Internal, External, Online and Distance Learning 5
A How to Tactfully Report upon a Non-Conformance Internal Auditing 24
G Non-Conformance Report vs. Corrective Action Report - Are they the same? Nonconformance and Corrective Action 8
M In-Process Non-Conformance Report Contents ISO 13485:2016 - Medical Device Quality Management Systems 12
M Who can Identify and Initiate a Request for a Non-Conformance Report? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
S Another Name for NCRs? "Non-Conformance Report" is too negative ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 25
T Quality Alert vs. Non Conformance Report - What is the difference? Nonconformance and Corrective Action 32
M Corrective Action Report (CAR) & Non-conformance Report (IQA) - Computer vs. Paper Document Control Systems, Procedures, Forms and Templates 2
blile Increasing PFMEA occurrence ranking after non-conformance FMEA and Control Plans 4
S Non-Conformance and Deviations ISO 13485:2016 - Medical Device Quality Management Systems 4
C If it doesn't prevent a non-conformance, is it a preventive action? IATF 16949 - Automotive Quality Systems Standard 13
T Non conformance product identification and traceability 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
I Non-Conformance vs OFI -- your best descriptions ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 61
W Non-Conformance from recent Audit carried out on Purchasing AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
M What to do about Non Conformance forms that are deleted or missing? Nonconformance and Corrective Action 4
C Neglect or legitimate deferral? Is excessive workload or lack of resources in a department or a team a valid root cause for a non-conformance? Problem Solving, Root Cause Fault and Failure Analysis 12
G Non Conformance During ISO 9001 Audit - Not All Internal Audits Completed General Auditing Discussions 19
C Fact or fiction - Repeat minor becomes a major IATF non-conformance IATF 16949 - Automotive Quality Systems Standard 7
P Line accums as a non-conformance? Supplier Quality Assurance and other Supplier Issues 2
S Returned product due to Customers fault, is it a Non-Conformance? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
I AS9100D Non-conformance for 10.2.1 b 2 and 10.2.1. b 3 e and f - Corrective Action AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
P Are red non-conformance bins required anywhere in the ISO or IATF standards? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
I "We don't have enough resources" as an Audit Non-conformance Response General Auditing Discussions 14
G Informational Is Past due calibration a non-conformance if tagged "Do Not Use"? General Measurement Device and Calibration Topics 9
D Minor non-conformance for not receiving a CofC from a heat treater Manufacturing and Related Processes 10
P Minor Non-Conformance - Maintenance Records Not Fully Completed ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 24
qualprod Minor non-conformance for not controlling local regulation laws? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 20
GoSpeedRacer How to handle operator involvement in the non conformance ISO 13485:2016 - Medical Device Quality Management Systems 5
qualprod An uncontrolled record is it a non-conformance? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
V Difference between Non-Conformance, Variance and Deviation ISO 13485:2016 - Medical Device Quality Management Systems 7
M Closing of a Non Conformance Nonconformance and Corrective Action 5
K Corrective and preventive action for Non Conformance on PFMEA FMEA and Control Plans 30
D Is Failure to achieve a Goal a Major Non-Conformance? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
W Can you have a Corrective Action without a Non-Conformance? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
K Bottle Labeling Machine Problems - Non conformance in FCMG industry Nonconformance and Corrective Action 8
M Procedure Non-Conformance=Corrective Action? Document Control Systems, Procedures, Forms and Templates 14
M Class II Medical Device Design Control Non Conformance 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
L Root Cause for Minor Non-conformance regarding Supplier Delegation Nonconformance and Corrective Action 5
D Calibration & Test Laboratory Non-Conformance Procedure Example wanted General Measurement Device and Calibration Topics 3
J Non-Conformance for Not Taking Exclusion AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
V Is non-conformance (incident) required for any observation in equipment qualification Nonconformance and Corrective Action 5
C The prudence of combining non-conformance reports with corrective/preventive action Nonconformance and Corrective Action 10
P Definition Nonconformance or Non-Conformance? Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 4
B Combining both Deviation and Non-Conformance Processes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
J Non Conformance Area Policies Misc. Quality Assurance and Business Systems Related Topics 8
P Non Conformance Reporting in GMP in the Control of Materials Nonconformance and Corrective Action 1
G Writing up BRC audit non-conformance Internal Auditing 9
M Definition Major vs. Minor Non Conformance Definitions Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 14
J Can An External Auditor Also Write The Same Non-Conformance As An Internal Auditor? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6

Similar threads