My past experience was that only one sample piece from standard production was used to prepare a typical AS9102 FAIR. I am now at a company that requests between 13 and 30 units be submitted for FAI reporting. Problem is, there is no justification as to why.
This is very costly because of the preparation fees added by the suppliers.
What are other companies out there doing? Is 1 piece typical?
Also - Are most companies bubbling drawings and preparing the forms to later be filled out by their suppliers or are they leaving it up to the suppliers and then verify that they didn't miss anything?
Does anyone out there use the AS9102 data as the basis for preparing their receiving inspection quality plans? I would like to find a way to combine them both into an EXCEL spreadsheet so that I can monitor it all in one place.
Elsmar is a fantastic place for information! It is my go to place for things happeneing out there in the quality world. Thanks for being there!
Common Sense
This is very costly because of the preparation fees added by the suppliers.
What are other companies out there doing? Is 1 piece typical?
Also - Are most companies bubbling drawings and preparing the forms to later be filled out by their suppliers or are they leaving it up to the suppliers and then verify that they didn't miss anything?