In the clause 5.3c) in the Rules 4th, it says: The min. audit time in manufacturing process shall be a min. of one third of the total audit days.
Situation: a site with 5.5 md, but it has two RLs which are allocated as 1md (0.5md for each RL), so the total audit days on the site will be 4.5md. Which one is the correct calculation ?
5.5md/3 = 1.83md = 14H40min
4.5md/3 = 1.50md = 12H
Thanks
Jelly
Situation: a site with 5.5 md, but it has two RLs which are allocated as 1md (0.5md for each RL), so the total audit days on the site will be 4.5md. Which one is the correct calculation ?
5.5md/3 = 1.83md = 14H40min
4.5md/3 = 1.50md = 12H
Thanks
Jelly