Overall Equipment Efficiency (OEE) calculation of 2 different scenarios.

V

vane0326

Hi everyone,


I have a problem in my OEE calculation I do not know if a machine is scheduled to work for 7.67 hours and the employee who supposed to work on the machine called in sick. Is that consider downtime? I know it will effect the availability % But should effect the performance as well? I left an excel workbook below with 2 different scenarios in 2 different worksheets. Please help I've been working on this for days. What worksheet is correct?
 

Attachments

  • OEE.xls
    32 KB · Views: 639
Last edited by a moderator:
W

wmarhel

Re: OEE calculation of 2 different scenarios.

If an operator is absent, but the machine is capable of running; then the machine would be considered being "available". Availability is looked at as when a machine is capable of running. Downtime is usually a result of a stoppage or quality issue, but it hasn't been planned for.

Maintenance activities for example would reduce the time available, but they wouldn't necessarily be considered downtime if it was an activity that has been planned for, and scheduled.

Refer to the attachment in this post: OEE Worksheet

In your example, I would say that the machine was available, and that you did occur downtime. In this example, it should highlight the need for cross-training or a potential manning issue.

Wayne
 
V

vane0326

Re: OEE calculation of 2 different scenarios.

In your example, I would say that the machine was available, and that you did occur downtime. In this example, it should highlight the need for cross-training or a potential manning issue.

Wayne


Hi Wayne,

Thank you so much for replying. Just to be sure Worksheet "Downtime" is the one I should be using?
 
W

wmarhel

Yes. The machine was scheduled and it was available for operation, so it would be considered downtime.

Wayne
 
A

adrianpask - 2011

Might be worth considering some sort of OEE rule book to go with your monitoring system so that you can apply these rules consistently.

There's a cheeky part of me that says it doesn't actually matter where you put the loss so long as action is taken on it and that you're consistent and transparent.
 
Thread starter Similar threads Forum Replies Date
8 OEE (Overall Equipment Effectiveness/Efficiency) Help Lean in Manufacturing and Service Industries 17
Q Availability Calculation for monitoring Overall Equipment Efficiency Manufacturing and Related Processes 2
AnaMariaVR2 OEE (Overall Equipment Efficiency) on Pharma Packaging Lines Lean in Manufacturing and Service Industries 8
Y OEE (Overall Equipment Efficiency) help Lean in Manufacturing and Service Industries 6
S OEE (Overall Equipment Efficiency) - One question Manufacturing and Related Processes 17
B Overall Equipment Effectiveness of Efficiency Quality Tools, Improvement and Analysis 2
S OEE Software - Automating the collection of Overall Equipment Efficiency data Statistical Analysis Tools, Techniques and SPC 8
P OEE (Overall Equipment Efficiency) and Downtime Manufacturing and Related Processes 17
E Control Charts for OEE (Overall Equipment Efficiency) Statistical Analysis Tools, Techniques and SPC 19
M Can OEE (overall equipment effectiveness) exceed 100%? Manufacturing and Related Processes 2
M Where does OEE (Overall Equipment Effectiveness) belong? Quality Tools, Improvement and Analysis 11
L OEE (Overall Equipment Effectiveness) and Cost Savings Manufacturing and Related Processes 2
S Measuring OEE (Overall Equipment Effectiveness) for each Job, not for Machine Lean in Manufacturing and Service Industries 2
D Overall Equipment Effectiveness (OEE) Calculations Manufacturing and Related Processes 4
M Advice on how to introduce Overall Equipment Effectiveness - Machining Manufacturing and Related Processes 4
M OEE (Overall Equipment Effectiveness) Downtimes Calculation Manufacturing and Related Processes 8
J Overall Equipment Effectiveness Course - Word document .doc Manufacturing and Related Processes 4
D Definition OEE definition - Overall Equipment Effectiveness - Definition of A (Availability) Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 7
Marc Definition OEE (Overall Equipment Effectiveness) - Initials and Definition Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 0
A Overall equipment effectiveness - Computing OEE taking all machines taken together Manufacturing and Related Processes 12
H OEE (Overall Equipment Effectiveness) and Run at Rate IATF 16949 - Automotive Quality Systems Standard 5
A OEE - Overall Equipment Effectiveness QS-9000 - American Automotive Manufacturers Standard 1
A OEE - Overall Equipment Effectiveness - A Ford Requirement Customer and Company Specific Requirements 7
D Looking for 100% sort testing equipment for overall length, flatness, and parallelism General Measurement Device and Calibration Topics 1
I Estimation of overall residual risk. How to? EU Medical Device Regulations 11
I Realization processes input into overall risk ISO 14971 - Medical Device Risk Management 2
silentmonkey Overall Benefit/Risk Analysis - Risk Management VS Clinical Evaluation ISO 14971 - Medical Device Risk Management 3
M ISO 14971:2019: Criteria for overall residual risk ISO 14971 - Medical Device Risk Management 12
K Overall residual risk according to ISO 14971:2019 ISO 14971 - Medical Device Risk Management 5
C What is the difference between "Overall Risk" and "Risk"? (ISO 14971) ISO 14971 - Medical Device Risk Management 10
P Total Variation in Data - Overall Importance of the Principal Components Reliability Analysis - Predictions, Testing and Standards 1
Marc US wind capacity surpasses hydro, overall generation to follow World News 0
K Is there an overall standard for calibration of items used in TS 16949 Certified Co. IATF 16949 - Automotive Quality Systems Standard 3
Sam Lazzara ISO 14971 Clause 7 - Evaluation of Overall Residual Risk Acceptability ISO 14971 - Medical Device Risk Management 3
P Overall Cpk for Different Parts to Same Customer Statistical Analysis Tools, Techniques and SPC 6
S How to Calculate Overall FPY (First Pass Yield) Quality Tools, Improvement and Analysis 2
D QA's Role in the Overall Picture of the Organization and in Day to Day Activities Misc. Quality Assurance and Business Systems Related Topics 10
O Using SPC to determine overall Thread Quality Manufacturing and Related Processes 16
B Overall Process Capability - Simple question if you know how to answer it! Statistical Analysis Tools, Techniques and SPC 3
P Overall and Within/Between STDEV - Why not the same? Statistical Analysis Tools, Techniques and SPC 20
J Overall Residual Risk Procedure based on the 2007 version of ISO 14971 ISO 14971 - Medical Device Risk Management 4
V Emphasizing Severity more than Occurrence and Detection vs. Overall RPN FMEA and Control Plans 20
Raffy Is my machine setup control plan part of the overall control plan FMEA and Control Plans 2
J Calculating the overall MTTR for an MTBF of 476, given four subsystems Reliability Analysis - Predictions, Testing and Standards 1
M Capability level applicable to SPC process or overall process? Statistical Analysis Tools, Techniques and SPC 16
F Method for aggregating individual RPNs and determining an overall risk rating? FMEA and Control Plans 3
F How do you calculate Overall Residual Risk - Requirement of 14971 Risk Management ISO 14971 - Medical Device Risk Management 7
Marc Definition Expected "overall" performance - Definition - Process Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 0
Marc Performance - Expected "overall" performance - From Minitab Using Minitab Software 5
J Help with Mintab concepts: Expected "overall" performance vs. Observed performance Six Sigma 5

Similar threads

Top Bottom