SBS - The Best Value in QMS software

Part Submission Form - Need to submit PSW only once?

P

pourshams

#1
Hi,

Hello, sorry I am new to this community.

Can someone tell me if we just need to submit PSW once? as long as we dont change anything. and how many cirucits should be submitted along with the PSW? should all of them be measured. we do first article on one circuit.


.
 
Last edited by a moderator:
Elsmar Forum Sponsor
J

JLang

#2
Pourshams,

First of all welcome to the cove. I'm pretty new here myself, but have found it an extremely helpful place.

To answer your question, it can vary depending on the industry you are in and your customer's requirements. I am in the fastener distribution business and deal mostly with automotive companies.

Most of our customer's require us to submit six pieces with our PPAPs and to do some form of revalidation each year. If you deal in the automotive industry especially, I would suggest getting a copy of th AIAG PPAP Manual 4th Edition. Otherwise check with your customer and see what their submission expectations are.

That would be my first response. I would see what others with more experience have to say as well.
 
S

silentrunning

#3
Trying to do a PPAP without the guidance of the AIAG Manuals is frustrating at best. I would get the PPAP, FMEA, APQP, QSA, QS-9000 and SPC Manuals if I were going to work with automotive companies at all. Call AIAG at 1-313-358-3570 for ordering information.
 

Stijloor

Staff member
Super Moderator
#4
Trying to do a PPAP without the guidance of the AIAG Manuals is frustrating at best. I would get the PPAP, FMEA, APQP, QSA, QS-9000 and SPC Manuals if I were going to work with automotive companies at all. Call AIAG at 1-313-358-3570 for ordering information.
For clarification: QS-9000 has been withdrawn.
In its place we have ISO/TS 16949:2009. :agree1:

Stijloor.
 
P

pourshams

#5
Thanks I contacted them and I will get the manual. but how many parts you guys submit with the PSW usually? along with dimensioanl and electrical and visual checks.
 
S

sitapaty

#6
You have to submit one master sample and about ten or more parts as specified by the customer.If the part is large the sample qty can be reduced with consent.
You have to preserve one master sample with you.
Sitapaty
 
Thread starter Similar threads Forum Replies Date
automoto PPAP Forms - Part Submission (Warrant) form .xls Document Control Systems, Procedures, Forms and Templates 2
B Quality Stand Down form - Part of a PPAP submission to Johnson Controls Document Control Systems, Procedures, Forms and Templates 12
J Part submission warrant for Level 1 PPAP APQP and PPAP 1
G Gage R&R - Where am I going wrong? Part of a FAIR submission (Aerospace) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
J PSW (Part Submission Warrant) and Design Requirements APQP and PPAP 14
S Looking for a PPAP PSW, Part Submission Warrant, in Chinese APQP and PPAP 5
Moncia Part Submission Warrant - Customer Requirements for PSW Submission APQP and PPAP 7
D PSW (Part Submission Warrant) Question for Part Number Change APQP and PPAP 9
JoCam Approving a Test House on a Medical Device as a part of a 510k Submission 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
S Is a Quality Manual part of a 510k Submission? Other US Medical Device Regulations 1
C Who in the supplier organization has to sign the PSW (Part Submission Warranty)? APQP and PPAP 6
V Safety and/or Government Regulation question on a PSW (Part Submission Warrant) APQP and PPAP 6
T Who signs PSW's? (PPAP Part Submission Warrants) APQP and PPAP 1
shimonv Bench Testing as part of 510(k) Submission US Food and Drug Administration (FDA) 1
V Is it OK to put 2 Part Numbers on 1 PSW (Part Submission Warrant)? APQP and PPAP 12
V What has more weight: Master Print or Part Submission Warrant? APQP and PPAP 4
A Does the PSW (Part Submission Warrant) need to be a controlled document? APQP and PPAP 7
E PSW (Part Submission Warrant) for Service Parts APQP and PPAP 4
P PPAP Approval - Customer approval of PSW (part submission warrant) APQP and PPAP 5
S Material Supplier Part Submission Warrant (PSW) APQP and PPAP 2
I Confused on PPAP re-submission - Help on PSW (Part Submission Warrant) APQP and PPAP 3
B Salary Requirements as part of initial resume/CV submission Career and Occupation Discussions 13
M Spanish PSW (Part Submission Warrant) Needed APQP and PPAP 8
W Better Understanding of PSW (Part Submission Warrant) APQP and PPAP 7
B New PSW (Part Submission Warrant) - 4th Edition PPAP Manual APQP and PPAP 38
G Part Submission Warrant (PSW) dispute APQP and PPAP 19
S Can anybody tell me what the legal status of the Part Submission warrant (PSW) is? APQP and PPAP 3
D Seeking CURRENT PPAP Part Submission Warrant APQP and PPAP 7
C New PPAP submission required when changing part number? APQP and PPAP 11
J PPAP (Production Part Approval Process) Submission Level Differences - Forms attached APQP and PPAP 17
M Part Submission Warrant - Omitting Parts of APQP and PPAP 5
D Truck Industry Part Submission Warrant APQP and PPAP 6
W PPAP (Production Part Approval Process) - Clarify When submission is required APQP and PPAP 10
Q Can I use Cpk to compare if one part is usable in another part? Capability, Accuracy and Stability - Processes, Machines, etc. 5
I PFD (Process Flow Diagram) approach. Setup details as part of PFD? Manufacturing and Related Processes 3
B Combat Low Part to Part Variation in GRR Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 8
C Quality Manager as part of Management - 13485 ISO 13485:2016 - Medical Device Quality Management Systems 9
A Complaint review as part of the complaint handling process? ISO 13485:2016 - Medical Device Quality Management Systems 3
D FDA Guidance on Computer Software Assurance versus 21 CFR Part 11 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
F Physical Part Measurement General Measurement Device and Calibration Topics 6
S Clean room not part of my certification ISO 13485:2016 - Medical Device Quality Management Systems 3
A MDR ANNEX XI part A or Part B EU Medical Device Regulations 0
K How to handle GTINs for different configurations of one device with one part number? Other Medical Device Related Standards 0
A 60601-1 : Integrated Dry ECG Electrodes = 2 Patient connections inside 1 applied part? IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
E Zero part to part variation - Gage R&R project Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 15
0 To which part of 13485 does this refer? ISO 13485:2016 - Medical Device Quality Management Systems 3
D Separation of F-type applied part and remaining parts IEC 60601 - Medical Electrical Equipment Safety Standards Series 7
V Part selection for R&R studies Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 1
S ISO 9001:2015 vs 21 CFR Part 211 matrix Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 0
D CFR Title 14: Aeronautics and Space PART 120—DRUG AND ALCOHOL TESTING PROGRAM Federal Aviation Administration (FAA) Standards and Requirements 3

Similar threads

Top Bottom