Part submission warrant for Level 1 PPAP

Jafri

Involved In Discussions
#1
We have revision change for a print. The change is in tolerances which have been relaxed.
So we have asked the supplier to only send us level 1 PPAP with PSW only, without samples.

But the PSW format has section for "Submission Results" and a "declaration" that the samples are good.
What should I ask the supplier to do about them? Should these sections be left blank?

Thanks.
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
They should be completed the same way as they were for the previous submission. Keep in mind that the submission level pertains to only what must be submitted. All of the elements must be completed by the supplier unless you explicitly waive them.
 
Thread starter Similar threads Forum Replies Date
J PSW (Part Submission Warrant) and Design Requirements APQP and PPAP 14
S Looking for a PPAP PSW, Part Submission Warrant, in Chinese APQP and PPAP 5
Moncia Part Submission Warrant - Customer Requirements for PSW Submission APQP and PPAP 7
D PSW (Part Submission Warrant) Question for Part Number Change APQP and PPAP 9
V Safety and/or Government Regulation question on a PSW (Part Submission Warrant) APQP and PPAP 6
V Is it OK to put 2 Part Numbers on 1 PSW (Part Submission Warrant)? APQP and PPAP 12
V What has more weight: Master Print or Part Submission Warrant? APQP and PPAP 4
A Does the PSW (Part Submission Warrant) need to be a controlled document? APQP and PPAP 7
automoto PPAP Forms - Part Submission (Warrant) form .xls Document Control Systems, Procedures, Forms and Templates 2
E PSW (Part Submission Warrant) for Service Parts APQP and PPAP 4
P PPAP Approval - Customer approval of PSW (part submission warrant) APQP and PPAP 5
S Material Supplier Part Submission Warrant (PSW) APQP and PPAP 2
I Confused on PPAP re-submission - Help on PSW (Part Submission Warrant) APQP and PPAP 3
M Spanish PSW (Part Submission Warrant) Needed APQP and PPAP 8
W Better Understanding of PSW (Part Submission Warrant) APQP and PPAP 7
B New PSW (Part Submission Warrant) - 4th Edition PPAP Manual APQP and PPAP 38
G Part Submission Warrant (PSW) dispute APQP and PPAP 19
S Can anybody tell me what the legal status of the Part Submission warrant (PSW) is? APQP and PPAP 3
D Seeking CURRENT PPAP Part Submission Warrant APQP and PPAP 7
M Part Submission Warrant - Omitting Parts of APQP and PPAP 5
D Truck Industry Part Submission Warrant APQP and PPAP 6
G Gage R&R - Where am I going wrong? Part of a FAIR submission (Aerospace) Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
JoCam Approving a Test House on a Medical Device as a part of a 510k Submission 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
S Is a Quality Manual part of a 510k Submission? Other US Medical Device Regulations 1
C Who in the supplier organization has to sign the PSW (Part Submission Warranty)? APQP and PPAP 6
P Part Submission Form - Need to submit PSW only once? APQP and PPAP 5
T Who signs PSW's? (PPAP Part Submission Warrants) APQP and PPAP 1
shimonv Bench Testing as part of 510(k) Submission US Food and Drug Administration (FDA) 1
B Salary Requirements as part of initial resume/CV submission Career and Occupation Discussions 13
B Quality Stand Down form - Part of a PPAP submission to Johnson Controls Document Control Systems, Procedures, Forms and Templates 12
C New PPAP submission required when changing part number? APQP and PPAP 11
J PPAP (Production Part Approval Process) Submission Level Differences - Forms attached APQP and PPAP 17
W PPAP (Production Part Approval Process) - Clarify When submission is required APQP and PPAP 10
W Classes and Applied Part IEC60601 Electromedical Equipment IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
E How to test 8.7.4.7 d) ? What "not protectively earthed accessible part" means? IEC 60601 - Medical Electrical Equipment Safety Standards Series 2
Anonymous16-2 Sinks and Sanitation - 21 CFR Part 111 Miscellaneous Environmental Standards and EMS Related Discussions 4
O PPAP'ed part manufacturer has discontinued production Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 7
N Reworked Finished Goods (FG) - Part of CoPQ? Misc. Quality Assurance and Business Systems Related Topics 3
O Should a Covid vaccine and testing policy be included as part of ISO9001 or AS9100 risk management? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
S 21 CFR part 11 version differences Qualification and Validation (including 21 CFR Part 11) 1
A Is computing Hardware part of the IVD CE Marking (Conformité Européene) / CB Scheme 3
abrego44 AIAG PPAP manual for service part APQP and PPAP 2
M Reference part calibration or verification General Measurement Device and Calibration Topics 12
cgaro62 Using internal audits as part of document reviews Document Control Systems, Procedures, Forms and Templates 21
A Dielectric withstand of applied part IEC 60601 - Medical Electrical Equipment Safety Standards Series 1
M List of FAA Part 145 Repair Stations in MS Excel format? Federal Aviation Administration (FAA) Standards and Requirements 0
K 10 parts, 4 operators, 3 replications and each part has 3 location to measure. Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
L FDA & 21 CFR Part 11 Medical Device and FDA Regulations and Standards News 19
Q Can I use Cpk to compare if one part is usable in another part? Capability, Accuracy and Stability - Processes, Machines, etc. 5
I PFD (Process Flow Diagram) approach. Setup details as part of PFD? APQP and PPAP 5

Similar threads

Top Bottom