Hi all,

I am doing my project in PFMEA of Aluminium Die casting process.

Details:

Process-Aluminium- High pressure-Cold Chamber Die casting

Process flow:​

1) Raw material melting
2) Metal Pouring
3)Injection
4)Solidification
5)Casting Extraction
6)Die coat Spray
7)Runner Breakage
8)Trimming
9)Fettling
10)Inspection

From the last six month data ,we collected the various type of defects

Defects in the order of occurrence (High to low)

Blowholes
Poorflow
Casting Damage
White rust
Trimming Damage
Insert Blowholes
Bubbles
Airholes
Leakage(oil)
Unwash
Gate area Deep Broken

The doubts i have in mind are

i) Is Defect a Failure Mode
ii) If yes, Which defects mentioned above are failure modes to be considered for Process FMEA
iii) After identifying failure mode, how to identify the effect and cause
iv) i have little knowledge about casting process. pls specify the Potential effect and causes for the above defects
v)How can i assign severity for above defects
vi)can i use the past data to decide the severity level and occurrence


Pls explain me in detail


Thanks in advance

Karuna
 
Last edited by a moderator:
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration with a Mask on...
Staff member
Admin
#2
Can anyone help with this one? My Thanks in advance!
 
B

Bill Mitchell

#3
I personally cannot help but luckly I have a great team of Technical Experts. I will forward this to them and get some feedback for you. We have a a large background in PFMEA's so I am sure we can help.
 
B

Bill Mitchell

#4
Hi all,

I am doing my project in PFMEA of Aluminium Die casting process.

Details:

Process-Aluminium- High pressure-Cold Chamber Die casting

Process flow:​

1) Raw material melting
2) Metal Pouring
3)Injection
4)Solidification
5)Casting Extraction
6)Die coat Spray
7)Runner Breakage
8)Trimming
9)Fettling
10)Inspection

From the last six month data ,we collected the various type of defects

Defects in the order of occurrence (High to low)

Blowholes
Poorflow
Casting Damage
White rust
Trimming Damage
Insert Blowholes
Bubbles
Airholes
Leakage(oil)
Unwash
Gate area Deep Broken

The doubts i have in mind are

i) Is Defect a Failure Mode
ii) If yes, Which defects mentioned above are failure modes to be considered for Process FMEA
iii) After identifying failure mode, how to identify the effect and cause
iv) i have little knowledge about casting process. pls specify the Potential effect and causes for the above defects
v)How can i assign severity for above defects
vi)can i use the past data to decide the severity level and occurrence


Pls explain me in detail


Thanks in advance

Karuna
Hi:

I received a quick response from our technical person. Just so you are aware this individual has a backgroud in COre Tools and PFMEA. He has provide training and consulting to all big automotive companies.

Per his feed back: No this is not and effective PFMEA The process flow is not detailed enough to determine failure nodes. For example Injection has 4 to 8 steps in the process. These need to be included to review potential risk and failure.

In comparison t a plasitc mold injection process a PFMEA generally includes up to 60 steps.

Defects are not Failure modes and relate more to how they affect the customer.

This is a brief response and I hope it helps. Generally what you are asking is a 2 day class and would be impossible to relay on a blog.
 
B

Bill Mitchell

#5
My technical person just sent this over. He has added some feedback into the original post.

Hi all,

I am doing my project in PFMEA of Aluminium Die casting process.

Details:

Process-Aluminium- High pressure-Cold Chamber Die casting


Process flow:
Process flow is not detailed enough. Each process step must be defined and the specific requirements of the step then determined. Once the requirement is determined, the failure mode is the negative of the requirement. For example:

Step Requirement Potential Failure Mode
Pour melted material Pour at a rate of XX per minute Material not poured at a rate of XX per minute



1) Raw material melting
2) Metal Pouring
3)Injection
4)Solidification
5)Casting Extraction
6)Die coat Spray
7)Runner Breakage
8)Trimming
9)Fettling
10)Inspection


From the last six month data ,we collected the various type of defects

Defects in the order of occurrence (High to low)

Blowholes
Poorflow
Casting Damage
White rust
Trimming Damage
Insert Blowholes
Bubbles
Airholes
Leakage(oil)
Unwash
Gate area Deep Broken

The doubts i have in mind are

i) Is Defect a Failure Mode – No defects relate more to the effect. A failure mode is related to the process
ii) If yes, Which defects mentioned above are failure modes to be considered for Process FMEA
iii) After identifying failure mode, how to identify the effect and cause – The effect is what the customer would experience assuming the failure mode occurred. Causes can be determined using many different tools, cause and effect analysis being a key tool.
iv) i have little knowledge about casting process. pls specify the Potential effect and causes for the above defects – Response beyond the scope of this email. We can do this as part a an FMEA coaching / consulting project.
v)How can i assign severity for above defects – based on how the effect impacts the customer
vi)can i use the past data to decide the severity level and occurrence – It can be helpful with effects but it has more of a relationship with occurrence depending on the type of data.
 
T

tk5013

#6
Hi all,

Thanks for your reply.I'm really grateful to you all.

I got the process steps from the control plan

Raw material Testing

Ingot / Runner mixing

Pre heating of Dies

Plunger limit switch position.

Pressure setting

Operation cycle setting

Oil temp

Die temp

Dycote mixing

Spraying

Molten metal Cleaning

PDC Process inspection

Runner breaking

Fettling

Visual inspection

Vacuum Impregnation

Casting Identification

Final inspection

Packing & Dispatch



Hope its perfect.

Can anyone list some potential failure modes for the above process and its effects.

Thanks in advance
Karuna
 
Thread starter Similar threads Forum Replies Date
P Equipment URS, pFMEA and dFMEA ISO 14971 - Medical Device Risk Management 3
W Pfmea function requirement and failure mode FMEA and Control Plans 6
G Control Plan & PFMEA Review Procedure? FMEA and Control Plans 1
M Material incoming to the production process reflected in PFMEA FMEA and Control Plans 9
R Power Failure or Cold Start Situation in PFMEA FMEA and Control Plans 6
M "Issue & continuous improvement" columns in AIAG-VDA PFMEA form FMEA and Control Plans 4
C AIAG-VDA PFMEA - 1st special Characteristics? [5step vs. 6step] FMEA and Control Plans 3
T Linking Control Plans and PFMEA's FMEA and Control Plans 3
T PFMEA and Control Plans on legacy product FMEA and Control Plans 5
R DFMEA/PFMEA mitigation of high severity (9-10) in low volume products IATF 16949 - Automotive Quality Systems Standard 1
T Annual Validation as a detection mode on a PFMEA? FMEA and Control Plans 5
P Understanding DFMEA and PFMEA - Supplier Related IATF 16949 - Automotive Quality Systems Standard 21
A ISO 14971 PFMEA Manufacturing Risk ISO 14971 - Medical Device Risk Management 2
D Can PFMEA be used in disposition of NC material? ISO 14971 - Medical Device Risk Management 4
J On PFMEA for danger labels - Label always should be assigned severity 10 ? FMEA and Control Plans 3
V Customer Print Specifications on PFMEA FMEA and Control Plans 13
blile Increasing PFMEA occurrence ranking after non-conformance FMEA and Control Plans 4
A PFMEA new AIAG FMEA and Control Plans 0
Q Is that any difficulty to do software DFMEA and PFMEA in ISO 13485? ISO 13485:2016 - Medical Device Quality Management Systems 5
bobdoering Informational New AIAG PFMEA Process - Excel Template Attached FMEA and Control Plans 23
A Redesigning our process flow chart, PFMEA and Control Plan Process Maps, Process Mapping and Turtle Diagrams 4
A PFMEA English language question IATF 16949 - Automotive Quality Systems Standard 4
S Is there any connection between PFMEA and Acceptance Plan FMEA and Control Plans 1
K PFMEA (Process FMEA) - Can be common for 3000 products? FMEA and Control Plans 2
N PFMEA repetitive failure modes in subsecuent stations. FMEA and Control Plans 1
T DFMEA/PFMEA and SCCAF alignment FMEA and Control Plans 19
N Control plan evaluation methods - Which methods should be carried over from the PFMEA? FMEA and Control Plans 3
A PFMEA - How long should the recommended actions remain in the recommended actions column? APQP and PPAP 3
S How to fulfill PFMEA "requirement" column? FMEA and Control Plans 2
T Informational Family or Baseline PFMEA Rules FMEA and Control Plans 22
A PFMEA severity score different applications FMEA and Control Plans 11
M Control Method correspondence between PFMEA and CP FMEA and Control Plans 8
O Difference Between PFMEA & Control Plan FMEA and Control Plans 3
N In-Process Production Test Stations in PFMEA (Process FMEA) FMEA and Control Plans 18
W Is the RPN (risk priority number) in the PFMEA really a RPN without the detectability ISO 14971 - Medical Device Risk Management 4
I Making a process PFMEA, no DFMEA (non-automotive toll manufacturer) FMEA and Control Plans 1
Proud Liberal DFMEA / PFMEA linkage - Where in the standards do I find it? FMEA and Control Plans 5
N PQC (Product Quality Characteristics) and PFMEA FMEA and Control Plans 3
N PFMEA Potential Failure Mode for Weight FMEA and Control Plans 5
M I need a sample Reverse PFMEA Process Checklist FMEA and Control Plans 2
C PFMEA example with machining (lathe+mill) FMEA and Control Plans 1
L Simple Example for PFMEA / Control Plan Training Training - Internal, External, Online and Distance Learning 1
B Proactive efforts to reduce risk - PFMEA risk reduction activities IATF 16949 - Automotive Quality Systems Standard 8
N PFMEA no effect ratings FMEA and Control Plans 15
N DFMEA, Drawings and PFMEA of an Assembly Process FMEA and Control Plans 12
A PFMEA for DC Motor FMEA and Control Plans 5
Crimpshrine13 PFMEA Scope - Oversized Special Characteristic FMEA and Control Plans 4
B PFMEA and Control Plan Links APQP and PPAP 2
B Update our PFMEA after Supplier updates their PFMEA? FMEA and Control Plans 4
Q PFMEA Scope and Detection Controls FMEA and Control Plans 1

Similar threads

Top Bottom