PFMEA (process FMEA) for Incoming Material stage

riosimbolon

Starting to get Involved
#1
Dear friends
on my PFMEA-incoming, we analyze source problem which related in our activities only, such as: handling when unloading, how to used handlift or forklift so the material not drop, how to keep the material protected from humidity or dust...etc

problem from supplier such as problem thickness material, different quantity, or not good quality incoming product, type of those problem are not categorized in our PFMEA because those caused in supplier.
What do you think about our opinion...and what kind concept problem should be evaluated in incoming area?

Thanks
Rio Simbolon
 
Elsmar Forum Sponsor

Chennaiite

Never-say-die
Trusted Information Resource
#2
Re: PFMEA in incoming

Dear friends
on my PFMEA-incoming, we analyze source problem which related in our activities only, such as: handling when unloading, how to used handlift or forklift so the material not drop, how to keep the material protected from humidity or dust...etc

problem from supplier such as problem thickness material, different quantity, or not good quality incoming product, type of those problem are not categorized in our PFMEA because those caused in supplier.
What do you think about our opinion...and what kind concept problem should be evaluated in incoming area?

Thanks
Rio Simbolon
Looks perfectly ok to me. Hope you also review Supplier's PFMEA.
 

Jim Wynne

Leader
Admin
#3
Dear friends
on my PFMEA-incoming, we analyze source problem which related in our activities only, such as: handling when unloading, how to used handlift or forklift so the material not drop, how to keep the material protected from humidity or dust...etc

problem from supplier such as problem thickness material, different quantity, or not good quality incoming product, type of those problem are not categorized in our PFMEA because those caused in supplier.
What do you think about our opinion...and what kind concept problem should be evaluated in incoming area?

Thanks
Rio Simbolon
Good for you! Your PFMEA should address only those variables that your organization controls. There are other ways of addressing supplier issues.
 

Kales Veggie

People: The Vital Few
#4
Dear friends
on my PFMEA-incoming, we analyze source problem which related in our activities only, such as: handling when unloading, how to used handlift or forklift so the material not drop, how to keep the material protected from humidity or dust...etc

problem from supplier such as problem thickness material, different quantity, or not good quality incoming product, type of those problem are not categorized in our PFMEA because those caused in supplier.
What do you think about our opinion...and what kind concept problem should be evaluated in incoming area?

Thanks
Rio Simbolon
Yes, your PFMEA should only address things you can control.
 

Jim Wynne

Leader
Admin
#6
Hi Jim & all,
I fully agree with your statement & often argue this point , I am looking for recognized body back up for this, would you know of any ?
I don't know of any in particular, although the AIAG FMEA manual probably addresses it at least implicitly. What sense is there in addressing things you have no control over?
 
Thread starter Similar threads Forum Replies Date
K PFMEA (Process FMEA) - Can be common for 3000 products? FMEA and Control Plans 2
N In-Process Production Test Stations in PFMEA (Process FMEA) FMEA and Control Plans 18
R Is PFMEA (Process FMEA) for OEM sufficient to address Risk? ISO 13485:2016 - Medical Device Quality Management Systems 7
Z Pass-Though Characteristics in PFMEA (Process FMEA) FMEA and Control Plans 2
P PFMEA (Process FMEA) Recommended Actions help FMEA and Control Plans 9
G Very Basic PFMEA (Process FMEA) Guidelines FMEA and Control Plans 17
M PFMEA (Process FMEA) - What is the best approach? FMEA and Control Plans 14
M PFMEA (Process FMEA) for Attribute Data Inspection Process FMEA and Control Plans 2
T PFMEA (Process FMEA) Recommended Actions Column FMEA and Control Plans 10
B Process FMEA (PFMEA) Same Multiple Causes for Different Effects FMEA and Control Plans 6
M Changing PFMEA (Process FMEA) RPN Values based on a Rejection FMEA and Control Plans 5
Q Using a Custom Process FMEA (PFMEA) Form FMEA and Control Plans 4
D PFMEA (Process FMEA) Process and Rankings (S-O-D) Document Control Systems, Procedures, Forms and Templates 8
A PFMEA (Process FMEA) Detection Rating - Actions to Reduce RPN FMEA and Control Plans 3
L PFMEA (Process FMEA) Forms - Dyadem FMEA Software Products FMEA and Control Plans 5
L Rotational Molding and Machining PFMEA (Process FMEA) - Plastics - example wanted FMEA and Control Plans 6
Chennaiite PFMEA (Process FMEA) for Vehicle Assembly wanted FMEA and Control Plans 4
H How to perform interesting PFMEA (Process FMEA) Training Training - Internal, External, Online and Distance Learning 6
M PFMEA (Process FMEA - Potential Causes and Failure) - Operator's Role FMEA and Control Plans 11
5 Changes to Control Plans or PFMEA's (Process FMEA) FMEA and Control Plans 6
P PFMEA (Process FMEA) Acceptable Effectivity Rate for Reoccurances of Issues FMEA and Control Plans 1
T DFMEA (Design FMEA) - We already have a PFMEA (Process FMEA) FMEA and Control Plans 5
D Laser Welding PFMEA (Process FMEA) - Metal FMEA and Control Plans 15
Casana Detection level in PFMEA (Process FMEA) - Bulk Fluids FMEA and Control Plans 10
P Problem with "failure mode? interpretation in PFMEA (Process FMEA) FMEA and Control Plans 8
R Addressing Inspection in PFMEA (Process FMEA) FMEA and Control Plans 2
S Pfmea (Process FMEA) at Process Audit FMEA and Control Plans 4
J When to Update PFMEA (Process FMEA) - Rejection is found at the customer FMEA and Control Plans 12
V Integrating the FMEA process with problem investigation/RCA process and PFMEA FMEA and Control Plans 11
C DFMEA (Design FMEA) and PFMEA (Process FMEA) - Who should lead? FMEA and Control Plans 14
C PFMEA (Process FMEA) Detection Scale - Aerospace engine components FMEA and Control Plans 4
H How to Make PFMEA (Process FMEA) from the beginning to the end FMEA and Control Plans 4
H Corrective Action: When to update the Process FMEA (PFMEA) FMEA and Control Plans 15
M Process FMEA (PFMEA) Assumptions Regarding Causes Identification FMEA and Control Plans 6
M Process FMEA (PFMEA) for D.C. Welding of Sheet Metal Parts - Electrode Material FMEA and Control Plans 1
N How to Calculate RPN in Design FMEA (DFMEA) vs. Process FMEA (PFMEA) FMEA and Control Plans 9
J When to update a PFMEA (Process FMEA) FMEA and Control Plans 17
S Detection Criteria Examples - PFMEA (Process FMEA) - Emergency Safety Fixtures FMEA and Control Plans 2
E PFMEA (Process FMEA) Class Symbols FMEA and Control Plans 6
Kales Veggie Informational How to develop a Control Plan from a PFMEA (Process FMEA) FMEA and Control Plans 63
kedarg6500 Supplier PFMEA (Process FMEA) Audit Form FMEA and Control Plans 4
Y Process FMEA (PFMEA) vs. Equipment FMEA (EFMEA) Differences FMEA and Control Plans 15
J Updating a PFMEA (Process FMEA) after a Process Failure FMEA and Control Plans 3
J The real Link between a PFMEA (Process FMEA) and the Control Plan FMEA and Control Plans 19
W Actual examples of FMEA (DFMEA, PFMEA) for Car Assembly Process IATF 16949 - Automotive Quality Systems Standard 5
L PFMEA (Process FMEA) issue about lower RPN - AIAG 3rd edition page 55 FMEA and Control Plans 13
M Connections between PFMEA (Process FMEA) and the Control Plan. FMEA and Control Plans 20
M PFMEA Severity - What is Process FMEA Severity estimation based on? FMEA and Control Plans 77
K Change in Occurrence for Low Volume Assembly Process FMEA (PFMEA) FMEA and Control Plans 8
M Include Risk of Rework in a PFMEA (Process FMEA)? FMEA and Control Plans 5

Similar threads

Top Bottom