Plan & Procedure to handle a Product that's being Withdrawn from the Market

D

dwayneq

I have searched both here and with Google on this subject but have not found either a good example of an EOL plan or a good write up on what a EOL plan should encompass. We already have a process in place for equipment that individually quits functioning so what I am looking for is the process of going through a decision to quit making a product, conveying the information to the install base and throughout the company, ensuring captive stock to cover outstanding warranties, final disposal of remaining stock after committed warranties have expired, etc..

Any help is greatly appreciated.
 
Last edited by a moderator:

somashekar

Leader
Admin
Re: Plan for a product that is End of Life (EOL)

We already have a process in place for equipment that individually quits functioning so what I am looking for is the process of going through a decision to quit making a product,
I am a bit mixed up with what you say and what you ask.
Your above statement more fits to the design life time of the product.
EOL is more a decision based on supply chain EOL or design upgrades which are also driven by regulations. Usually EOL will have information of which new product of your's is the best buy. All other supports can be based on the design lifetime of the EOL product from the last manufacturing.
 

sowmya

Involved - Posts
Re: Plan for a product that is End of Life (EOL)

TL 9000 clearly describes end of life planning
7.1.C.1 Life Cycle Model – The organization shall establish and maintain an integrated set of method(s)
that covers the life cycle of its products. The method(s) shall contain, as appropriate, the processes,
activities, and tasks involved in the concept, definition, development, introduction, production, operation,
maintenance, and disposal of products, spanning the life of the products. [6]
7.1.C.1-NOTE 1 A Life Cycle Model may include consideration and development of alternative solutions evaluated against selected criteria.
7.1.C.1-NOTE 2 The Life Cycle Model should take into consideration sustainability practices such as reduction of energy and resource consumption, ecologically-responsible disposal and proper end-of-life treatment.
7.1.C.1-NOTE 3 The new product introduction methods should include provisions for such programs as quality and reliability prediction studies, pilot production, demand and capacity studies, sales and service personnel training, customer documentation and training, and new product post-introduction evaluations.

basically you need to cover the stock disposition, documentation, and you need to plan how you are going to continually support till the end of life of the product. Also be careful about counterfeiting when you are using end of life parts.
 
D

dwayneq

Re: Plan for a product that is End of Life (EOL)

To help everyone understand better what I am working on, I am not defining how to handle the physical end of life of product out in the field. A better term for what I am trying to define a process for might be decommissioning a product due to changes in the marketplace and replacement with a better product. I'm looking help in defining of what internal and external processes need to take place to ensure the existing install base is supported though out their remaining warranty period, communication to customers that the product will no longer be available for sale after a certain date, and finally, how to handle inventory disposition at the appropriate time.

BTW - The product is class II.
 
Last edited by a moderator:

sowmya

Involved - Posts
Re: Plan for a product that is End of Life (EOL)

So, you are looking for quality system procedure. It is nothing but, how you want to define your process. you need to map how the process interaction has to happen, check and balances of the process and desired outcome of the process. we are CM, so we do not look in to direct communication to end customers. how ever, I have attached our End of life planning procedure. you can also create similar one considering all your processes.
 

Attachments

  • TLQMS-QSP-10 End of Life Planning.docx
    33.1 KB · Views: 196

harry

Trusted Information Resource
.............. A better term for what I am trying to define a process for might be decommissioning a product due to changes in the marketplace and replacement with a better product. I'm looking help in defining of what internal and external processes need to take place to ensure the existing install base is supported though out their remaining warranty period, communication to customers that the product will no longer be available for sale after a certain date, and finally, how to handle inventory disposition at the appropriate time.

BTW - The product is class II.

Does the amended thread title reflect your queries better?
 
D

dwayneq

Harry, Yes and thank you for helping to clarify. Since I posted I have been able to put together the skeleton and am now starting to work on adding substance. Below is the basic outlines to which I will add the specifics as required.

Product End of Life Steps

1) Initiate ? Initiator provides the following to EOL team members which will start the process
a. Identify product
b. Reason for initiating EOL
c. Replacement product or rationale
d. Proposed EOL announcement timeframe
2) Input ? EOL team members provide feedback
a. Transition plan to replacement product ? Product Manager
b. Warranty and repair impact ? Customer Service
c. Supplier commitments ? Operations
d. Financial impact ? Finance
e. Regulatory notifications ? Regulatory
f. Documentation ? Quality
3) Planning ? Initiator uses input create EOL plan
4) Approval ? Route plan for approval for cross functional approval
5) Announcement ? Official EOL announcement to customers and sales
6) Final build ? Build final inventory and repair parts
7) End Sales ? Official end of sales
8) End support ? No outstanding warranties and no further acceptance of repairs
9) Stock disposal ? Clear stock and write off

I will now be contacting the various departments to find out what input they will be looking for from other departments in order to provide input from their department for the EOL plan.
 
Thread starter Similar threads Forum Replies Date
Doninina Biological evaluation procedure or plan EU Medical Device Regulations 3
G Control Plan & PFMEA Review Procedure? FMEA and Control Plans 10
DuncanGibbons Resources for aiding in procedure, work instruction and manufacturing plan development and management AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
A ISO 14001:2015 transition audit - Major NC due to the procedure and audit plan ISO 14001:2015 Specific Discussions 10
5 Counterfeit Parts Mitigation Plan/Procedure Details Requirement(s) Document Control Systems, Procedures, Forms and Templates 5
J New Procedure - Changes in measurement devices listed on the Control Plan FMEA and Control Plans 1
C Change Control Plan/Procedure for Slickline/Wireline Services (Oil Field) Quality Manager and Management Related Issues 1
J AS9100 Rev C Internal Audit Procedure/Plan - Addressing 8.2.2 - Customer Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
N Sampling Plan and Procedure wanted - Chemical Trading Company Inspection, Prints (Drawings), Testing, Sampling and Related Topics 17
O Difference between Configuration Management Procedure / Plan in IT context? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
T Advice regarding a Calibration Plan and Procedure wanted Calibration Frequency (Interval) 2
T Controlled Environment Procedure: Disaster Recovery Plan ISO 13485:2016 - Medical Device Quality Management Systems 14
M Internal Audit Plan for every Procedure? Internal Auditing 9
N Plan and Procedure for Calibration Laboratory Intermediate Checks General Measurement Device and Calibration Topics 2
B Software Beta Testing - Sample test plan or procedure wanted Other Medical Device and Orthopedic Related Topics 5
A Level 2 Sampling Plan SOP (Standard Operating Procedure) Request Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
S Difference between Control Plan and SOP (Standard Operating Procedure) Document Control Systems, Procedures, Forms and Templates 6
D Improvement Plan for Gage R&R > 20% - Seeking Procedure Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
M Product Launch Plan "Checklist" and Procedure Document Control Systems, Procedures, Forms and Templates 7
B Safe Launch Plan (SLP) - Seeking Example Procedure Document Control Systems, Procedures, Forms and Templates 8
S Support Process - Procedure or Control Plan or ??? IATF 16949 - Automotive Quality Systems Standard 4
M Receiving Inspection Plan of COTS and SCH Help Various Other Specifications, Standards, and related Requirements 6
G Test Plan - Pass/Fail Criteria for TR 60601-4-2 Other Medical Device Related Standards 0
G PEMS Validation Plan IEC 62304 - Medical Device Software Life Cycle Processes 4
R IATF 3 YEAR CALENDAR PLAN IATF 16949 - Automotive Quality Systems Standard 1
Dazzur ISO10005 Quality Plan Inputs ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
M What should be measurement method in control plan if you are defining Control method as work instruction. Manufacturing and Related Processes 5
T External Audit Plan Email Template AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
GreatNate Looking for Hazardous Material Management Plan example or HMMP assessment checklist Occupational Health & Safety Management Standards 6
Nawal Stability Plan US Medical Device Regulations 2
Crimpshrine13 Bulk Process (Electroplating), Control Plan, and Process Change IATF 16949 - Automotive Quality Systems Standard 1
G PMCF plan/outcome EU Medical Device Regulations 10
Q Documented action plan ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
M Risk Management Plan ISO 14971 - Medical Device Risk Management 13
O Process Flow Diagram, DFMEA, PFMEA, Control Plan integrated softwares FMEA and Control Plans 7
V Over 60 dimensions CMM measurement in control plan APQP and PPAP 8
T AS9100D Work Transfer Plan Analysis AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M Need to set up a "crisis management and business continuity plan" AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
Q Quality Plan for eQMS software ISO 13485:2016 - Medical Device Quality Management Systems 2
G FMEA versus control plan IATF 16949 - Automotive Quality Systems Standard 6
K ISO 2859-5 (single run production) control plan issues FMEA and Control Plans 2
T Work Transfer Plan AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
C Statistics/sampling plan for medical device Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10
S Control plan - Multiple batches Manufacturing and Related Processes 2
R MDR Clinical Evaluation Plan EU Medical Device Regulations 6
Bev D Acceptance Inspection Sampling Plan Calculators Misc. Quality Assurance and Business Systems Related Topics 0
Q Control Plan and the frequency of sampling FMEA and Control Plans 11
F Attribute sampling plan ISO 13485:2016 - Medical Device Quality Management Systems 7
Q Proven plan ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 21
D IATF NC Interaction of process diagram - Missing contingency plan Process Maps, Process Mapping and Turtle Diagrams 9

Similar threads

Top Bottom