We are Electronics Contract Manufacturing, our product is the Printed Circuit Board Assemblied (PCBA) that will be installed to some kinds of medical devices / equipment by our customer as our their intended use such as install into a machine to measure pressure of blood in human body...

Regarding to Risk management at clause "7.1 Planning of product realization". Does anybody have any idea and give me concept about the requirement of risk managment to our PCBA product relization process? Does the PCBA product need to apply risk management?

Does anybody have an example of documented procedure for risk management please share with me.

Many thanks in advance.
 
Elsmar Forum Sponsor

howste

Thaumaturge
Super Moderator
#2
My first advice is to get a copy of ISO 14971 if you don't already have one. It is the standard that describes risk management for medical devices.

Because you're a contract manufacturer, your customer should be responsible for risk management for design. You should definitely focus on risk managment for the PCBA manufacturing side. Working with your customer, you should develop risk assessment and risk management activities based on their inputs. The results may be in the form of a process FMEA or FMECA with recommended actions.

Sorry, I don't have a risk management procedure I can share. Anyone else?
 
P

Pat McGhie

#3
Re: ISO 13485 Clause 7.1 Planning of product realization - Risk management

I am struggling with this a bit also. I have the standard on Risk Management but I have limited exposure today and am looking for a simple procedure. I do not see an samples yet.

Pat in NH
 
K

Katydid

#4
Re: ISO 13485 Clause 7.1 Planning of product realization - Risk management

We are a tier 1 contract manufacturer for orthopaedics. Up to this point, our Risk Analysis has been limited to the section below as found in the quality planning process. The customer base seems to be changing their requirements (especially the last month or so) and some will now start requiring more info for validation and risk analysis, which means they will be providing more information to me to help in this effort. I see a Quality Manual revision and process change on the horizon. This is not exactly what you asked for, but I thought you may be interested.

Good Luck!!!!



3. RISK ANALYSIS

3.1. Our Customers maintain design control over all products manufactured by *&%*#@. The customer is responsible for performing Design Risk Analysis including FMEA’s and other Risk Analysis techniques during their planning process in order to meet FDA requirements for 510(k) filings.

3.2. All information provided to *&%*#@ by the Customer is reviewed and approved prior to manufacturing to ensure products are produced per customer and regulatory requirements. Documents such as Customer Provided Inspection Sheets are used as a guideline for creation of our internal inspection criteria and frequencies.

3.3. Internal Risk Analysis can only be based on information the customer is willing to provide. Therefore, internally our risks are controlled by our quality planning and production control systems because access to design FMEA’s, customer process FMEA’s, and end user feedback information is not available from the Customer for our use.

3.4. Internal Risks are analyzed throughout Quality Planning and Product Realization. The analyses are evidenced by (but not limited to):

3.4.1. Sales Order Review Forms
3.4.2. Specification Review Forms
3.4.3. Quality Planning Meeting Record, Other Risks section for new processes or other risks.
3.4.4. Master Router Creation
3.4.5. Creation of Process Drawings
3.4.6. Creation of Inspection Sheets based upon available Customer Supplied Inspection Sheets (which provide a link to the Customer’s risk assessment systems). The Internal Inspection Sheets include stages of inspection, criteria to be inspected, gages to be used, and frequency of the checks.
3.4.7. Engineering Change Request adverse effect evaluations as documented on the ECR Form.
3.4.8. Rework adverse effect evaluations as documented on the Temporary Process Requirements Form or in (MANAGEMENT SOFTWARE) Comments for a rework job.
3.4.9. Communication Records are retained electronically on the Preventive Action Communication form by part number. These records document conversations with customers or vendors regarding product quality, specifications, requirements, or other risks associated with producing a product.

3.5. During the Design and Planning stages of our Quality Management System, certain manufacturing risks were identified and addressed by system requirements. Some of these systems include (but are not limited to):

3.5.1. First Piece Inspections by operator and a separate independent person to verify programs, gaging, tooling, and equipment.

3.5.2. Preventive Maintenance.

3.5.3. Procedures addressing the details of processes with many requirements such as Passivation.

3.5.4. Creation, Use, and Retention of our detailed Job History Files.

3.5.5. Training Programs.

3.6. If at any time *&%*#@ files a 510(k) with the FDA, the Quality Manager will be responsible to ensure all regulatory requirements are met including completion of the FMEA, and implementing a Design Control system.
 
P

Pat McGhie

#5
Re: ISO 13485 Clause 7.1 Planning of product realization - Risk management

Katydid,

Thank You! This is an excellent example for me... I will use it as a "reference" and generate something for management here to review.

Pat McGhie in NH
 
K

km214

#6
First I will begin with a resounding "I LOVE THIS FORUM" I was initially looking to confirm my perspective on risk management as it applies to contract manufactuing. Due to my 15 + years in quality my initial presumption was validated. Most of the burden of risk assessment lies with the designer of the product, however we as the manufacturer are required to analyze any risk our processes would add to the product during production of it. We have performed PFMEA's on our critical processes so we are there. Have some work to do in validating our processes but again we are getting there as well.
I appreciate the great minds here in the cove sharing their wisdom with us all.

I also appreciate the additional components offered here regarding not only risk management, but the regulatory and appropriate methods of documenting things like rework and more importantly the issues the contracting firm faces with their submission of the product's 510K. Some companies do not take into consideration that their customer has submitted the production plan for the part in the 510K submission in the sense that if a particular step is modified or other, the production process has changed and that change needs to be first-approved by the customer and second-may require a modification to their 510K submission. As we do not do 510K submissions here, my knowledge and expertise in this area is unrecognized and unfortunately dismissed.
Here to say thanks again for the info sharing!
 

Marcelo

Inactive Registered Visitor
#7
Great job Katydid!

But I would like to point that this procedure could be improved by not only expecting that your customer would do all the job of defining their requirements, you could also make a risk analysis of your board based on it´s intended "customer" use.

For example, it can be expected that there will be requirements for creepage and clearance distances, and flammability classification of your board (they´re all part of risk control requirements of medical electrical equipment safety standards), to control some risks on the final product in use. Shouldn´t you take this aspects into consideration "before" you customer say so?

You said that "end user feedback information is not available from the Customer for our use" but this is in fact part of a "customer requirements" definition from any regulatory or not design and development.

This approach would be also in concordance with the recent trend on systems parity (See my discussion in this thread for more info on that - http://elsmar.com/Forums/showthread.php?t=26591)
 
Thread starter Similar threads Forum Replies Date
Q Interpretation of Clause 7.1 Planning Of Product Realization in AS9100C standard AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S 7.1 Planning of Product Realization vs. 7.1.1 Project Management AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 13
H Planning of Product Realization - AS9100 Clause 7.1 - Can we exclude 7.1f? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
J Procedure doesn't define the process - 7.1 Planning of Product Realization AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 18
Sidney Vianna AS9120 - Should planning of product realization be excluded? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
H Planning of Product Realization (Quality Plans) - Clause 7.1 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A Planning of product realization EN 9100 Clause 7.1 e AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
D Planning for Product Realization example form, template or checklist Document Control Systems, Procedures, Forms and Templates 6
R TS 16949 - 5.4 Planning, 7.1 Planning of product realization, 7.5.1.1 Control Plan IATF 16949 - Automotive Quality Systems Standard 2
Sidney Vianna Informational APQP4Wind - Advanced Product Quality Planning for the Wind Power Supply Chain APQP and PPAP 3
H Operational planning and product and service provision when things happen so fast ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
W Core Process Metrics AS9100D for Product Planning? Quotes and sales? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
Sidney Vianna AS9100 News PPAP in the Aerospace Sector - What is it? AS9145 - Requirements for Advanced Product Quality Planning and Production Part Approval Process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
Sidney Vianna SCMH Awareness Webinar Focused on the revised Advanced Product Quality Planning APQP AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
A Medical Device Licensing - We are planning to sell another product Canada Medical Device Regulations 2
M Product Quality Planning Resposibility Matrix (APQP manual page 2) APQP and PPAP 3
C Product Quality Planning Summary and Sign Off Sheet APQP and PPAP 3
C API Q1 Clause 7.1.1 Planning of Product Realisation Oil and Gas Industry Standards and Regulations 2
M Compliance with ISO 9001 Clause 7.1 - Planning of Product Realisation ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 19
R APQP process as a planning tool for moving product lines to another factory APQP and PPAP 4
G APQP (advanced product quality planning) for cable assemblies APQP and PPAP 1
A When do you start the Advanced Product Quality Planning (APQP) Process? APQP and PPAP 10
J What is Risk Management Review (during Product Planning) Risk Management Principles and Generic Guidelines 8
S Planning of commercialization stages like new product planning ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
A First Article planning - Is an FAI timeline for the product the same thing? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
A Asked to assist in Reliability and Maintainability planning for a new product Reliability Analysis - Predictions, Testing and Standards 3
B Product Audit Planning / Frequency /Scope - Is anyone aware of preferred methods? General Auditing Discussions 11
A Audit day - Production Planning - Must we be producing product? General Auditing Discussions 14
A DCX (Daimler - Chrysler) - PSO (Process Sign-Off) and PAP (Product Planning) Info IATF 16949 - Automotive Quality Systems Standard 9
S Seeking Chrysler documents - PSFD027 - DaimlerChrysler Product Assurance Planning Customer and Company Specific Requirements 7
apestate Help Improve a Product Planning Process! ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
R APQP Appendix F - Product Quality Planning Summary And Sign-off APQP and PPAP 9
D APQP (Advanced Product Quality Planning) - Seeking a simple, effective format Document Control Systems, Procedures, Forms and Templates 6
lanley liao How to understand this words that the planning of internal audit shall take into consideration the results of previous audits? Oil and Gas Industry Standards and Regulations 10
qualprod Business Continuity Planning in ISO 9001? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
N Example for design and development planning,input,output,review,verification,validation and transfer Misc. Quality Assurance and Business Systems Related Topics 4
T 21 CFR 820.20 - Quality Planning Requirements? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 2
salaheddine96 Internal audit planning Internal Auditing 2
M FSMS Targets and Objectives in SMART planning Food Safety - ISO 22000, HACCP (21 CFR 120) 4
E Our company is planning to file MDD not MDR next month. Do we require to show chemical characterization report ? CE Marking (Conformité Européene) / CB Scheme 2
lanley liao How to understand the clause 6 Planning of ISO 9001:2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
NDesouza AS9100 - D Capacity Planning Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Moncia Production Planning procedure ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
Richard Regalado Top 10 operational risks of 2019 for business continuity planning Business Continuity & Resiliency Planning (BCRP) 6
E Resources for Planning for top quality Business Continuity & Resiliency Planning (BCRP) 6
I Questions to ask when auditing for Organizational Leadership and Planning for the QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M IATF 16949 (6.1.1 - Planning and Risk Analysis for a remote site) Process Maps, Process Mapping and Turtle Diagrams 5
DuncanGibbons Are there any aerospace specific requirements for material resource planning? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
S ISO 9001:2015 & ISO 14001:2015 - I need a format for Design & Development planning ISO 14001:2015 Specific Discussions 2
M Master Dot for quality planning/improvement Manufacturing and Related Processes 1

Similar threads

Top Bottom