Most of the cases, molds were not approved at first trial, T1.
Current average is third trial, T3. Some cases goes up to T9.

What are the ways to reduce mold approval cycle?
 
Elsmar Forum Sponsor
#2
Re: Plastic mold approval

One critical step is to involve the mold maker in the part design process. Another is to develop a set of design guidelines which consider the manufacturability of design features.
 

DanteCaspian

Quite Involved in Discussions
#3
Re: Plastic Mold Approval

Establish a cross functional team:

1) As per above, include the mould maker in the design process. In our case we now have one dedicated technician that has proven his science of moulding abilities, and is doing all the trials, being involved from the beginning. and through the initial setup.

2) Involve the tool maker through the process Establish standards to be addressed during the entire trial process.

3) At a minimum, have a written SPI/procedure that addresses all checks and measures for best practice of: a) customer needs assessment, b) material choices (resin and mould) c) design of the tool (as well as fixtures and the like), d) build of the tool(s), e) processing of, and d) ECOs

4) production staff and process engineers should be included for initial work space set up, flow of people, parts info. as related to the job and use of other companies protocols. In our case, Lean tools and other in-house standards.
Such staff will also assist in packing standards or other manual processes post part ejection. It is here we build the work instructions for the job.
This also allows people empowerment-- I can say it works good for us!

5) In some cases, if not all, you may want to include customer service and sales in the team... keep them involved and updated as to the procedures. That way the customer is never going to be put on hold as all parties are aware of the progress.

6) Quality control. Our lab and document control are updated and involved during the initial stages of processing (once we have parts spitting out of the machine). Improvements are passed through them, or suggested by them as we more forward.


In some cases the trial is done and approved and we still do some improvement efforts to reduce wastes and improve efficiencies.

The PDCA cycle should be built in to the the prevention side of things as your develop procedures for mould trial.
I would also recommend you have a compliant coordinator/project manager head up all the mould trial processes. Such a person needs to be familiar with proper quality assurance methods design and tooling.

For our shop, we went from 3- 9 trials on products to 1-3 while developing these principles I outlined. We have many improvements to make yet as some of those points for us are not as solid as we would like. Some resource allocation is required for us, and we are moving in the right direction.
There is MUCH less internal irritation far less waste, and more value-added work now. Much of it was about establishing communication and standardization through the entire value stream!
 
Last edited:

Golfman25

Trusted Information Resource
#4
Re: Plastic Mold Approval

So you expect them to put some actual thought into what they are doing? :)

The biggest thing imo is designing the part for manufacturability. Have the moldmaker involved and make sure you don't have needless dimensions and tolerances. Of course, with this kid of support you can't buy your molds on price. Good luck.
 
M

mehmetke

#6
Re: Plastic mold approval

One critical step is to involve the mold maker in the part design process. Another is to develop a set of design guidelines which consider the manufacturability of design features.
My company is loceted in Europe and the moldmaker is located in China. There are three dedicated moldmakers. The moldmakers are involved in part design and mold design guidelines were set atstart up stage.

Trial1 (T1) is generally achived in 35 days. 4wks to T2 and another 4 wks to T3. ... Seems like cannot achive the dimensions correctly.

Any suggestion
 
#7
Re: Plastic mold approval

My company is loceted in Europe and the moldmaker is located in China. There are three dedicated moldmakers. The moldmakers are involved in part design and mold design guidelines were set atstart up stage.

Trial1 (T1) is generally achived in 35 days. 4wks to T2 and another 4 wks to T3. ... Seems like cannot achive the dimensions correctly.

Any suggestion
Aha, the downside of buying 'cheap' in China!

In my experience, key personnel have been sent to China to work with the mold maker, to ensure the first trial was good.
 
M

mehmetke

#8
Re: Plastic mold approval

Aha, the downside of buying 'cheap' in China!
Correct. Orginally, years ago, İtaly-> Spain -> Portugal -> Korea -> Taiwan -> and finally molds are produced in China.

Cannot convience purchasing people as usual.
 
Last edited by a moderator:

DanteCaspian

Quite Involved in Discussions
#9
Despite having a on site, staffed tool room and a local mould maker, we have some moulds outsourced in Asia as well.
Despite the stigma of 'China made', there are some good businesses out there; though, yes, you get what you pay for.

Some things that may help: Part approval before payment. Visiting the facility, seeing the process & measuring the results.
 
Thread starter Similar threads Forum Replies Date
A Plastic Injection Molding - Post Mold Labeling Manufacturing and Related Processes 3
H How to integrate ISO/TS 16949 & ISO9001 Quality Systems - Plastic Injection Mold IATF 16949 - Automotive Quality Systems Standard 7
P Short Molding Issue - Plastic Injection Molding from a Multi Cavity Mold Quality Manager and Management Related Issues 13
J Plastic Injection Molding Mold Change - PPAP Process Question APQP and PPAP 8
K Plastic mold injection manufacturing - Quality Manual examples please Quality Management System (QMS) Manuals 7
Stoic Details of Operational Qualification (OQ) test design for plastic extrusion processes, effect of material property noise, and GHTF/SG3/N99-10 US Medical Device Regulations 2
R Suggest modern equipment/instrument for plastic bottle inspection? Quality Tools, Improvement and Analysis 1
S Impeller Unbalancing inconsistancy on plastic impellers Manufacturing and Related Processes 0
M How to measure a plastic cap General Measurement Device and Calibration Topics 19
I Class VI certification on seals, o-ring and plastic for a WFI system Qualification and Validation (including 21 CFR Part 11) 0
D Suggestions for Ishikawa for hyperdetailed customer - plastic molding automotive parts Nonconformance and Corrective Action 9
D Measurables for Plastic Injection molding process Manufacturing and Related Processes 1
D Continuous Improvement Plan - Plastic injection molding IATF 16949 - Automotive Quality Systems Standard 1
Z Rapid audit template for plastic parts manufacturing process Manufacturing and Related Processes 12
D IMDS for Like Components (Interior Plastic, Leather/vinyl Armrest, etc.)other than Color APQP and PPAP 1
A Help establishing regulatory requirements - Plastic dental cartridge syringe US Food and Drug Administration (FDA) 0
C ABS plastic : which IEC 60601-1 tests to redo? IEC 60601 - Medical Electrical Equipment Safety Standards Series 6
A Glass and brittle plastic Policy - Required per FSSC 220002-4? Food Safety - ISO 22000, HACCP (21 CFR 120) 0
Nicole Desouza Plastic Extrusion of Medical Device Components - No ISO or AS 9100 Certifications Other Medical Device and Orthopedic Related Topics 7
Nicole Desouza AS9100D - Calibration of Dies & Tooling - Plastic Extrusion AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Fernando Drumond Calibration and Control of Plastic Volumetric Measurement Instruments General Measurement Device and Calibration Topics 1
erozas2003 Color test on molded plastic parts Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
Z CQI-15 Welding System Assessment - Robotic Ultrasonic Foam onto Plastic "Weld" applicable? Various Other Specifications, Standards, and related Requirements 3
M Informational 2019 Meeting Materials of the General and Plastic Surgery Devices Panel Medical Device and FDA Regulations and Standards News 0
M Informational The USFDA Announces General and Plastic Surgery Devices Panel of the Medical Devices Advisory Committee Meeting on March 25-26, 2019 Medical Device and FDA Regulations and Standards News 0
J Looking for FMEA plastic injection molding FMEA and Control Plans 8
John Broomfield Cleaning plastic from our oceans - The Ocean Cleanup Venture Sustainability, Green Initiatives and Ecology 33
Y How to fix weight tolerance for plastic injection molded part? Does it vary with material groups? Manufacturing and Related Processes 1
A Cleaning plastic parts for sterilized medical devices ISO 13485:2016 - Medical Device Quality Management Systems 15
smryan Chemistry and physics of plastic behavior - Any plastics experts in the house? Coffee Break and Water Cooler Discussions 1
K Sampling Plan for transparent tubular plastic parts from 32 different cavities Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
L I need an example rework procedure/instruction for injected plastic parts Document Control Systems, Procedures, Forms and Templates 2
J Finishes on Plastic Molded Parts Manufacturing and Related Processes 9
D Hot Plate Welded Plastic Strength Validation Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
K Testing Large Plastic Pipe Imported Legacy Blogs 0
L Product Requalification for Plastic Injected Parts APQP and PPAP 3
A Plastic Injection Molding Process Troubleshooting Guide Manufacturing and Related Processes 1
T Customer Requirement for Sorting - Visual Defect on Plastic Part IATF 16949 - Automotive Quality Systems Standard 9
M How to fix a plastic bag on leg with a bandage to take a shower Coffee Break and Water Cooler Discussions 15
M Kinds of plastic for molded parts in a main frame as structure Manufacturing and Related Processes 7
M Best Type of Grease for Vex Plastic Gears Manufacturing and Related Processes 5
M Lot Numbers of Plastic Disposables in an LDT (laboratory developed test) ISO 13485:2016 - Medical Device Quality Management Systems 6
S What is appropriate PPM level for a Plastic Injection Moulding Supplier Quality Tools, Improvement and Analysis 4
P Cross Section Issue - Dissecting a plastic part for measurement Manufacturing and Related Processes 4
N What Can I Do With Plastic Pellet Scrap? Manufacturing and Related Processes 17
K Plastic Resin designated as Significant Characteristic Manufacturing and Related Processes 7
S ECH (ethylene chlorohydrin) residues - Plastic catheter packed in a sterile bag Other Medical Device Related Standards 5
J Plastic Compatibility tests with the contact of mucous membranes Other Medical Device Regulations World-Wide 3
E Cosmetic Standard for Sheets of Extruded Plastic Manufacturing and Related Processes 1
F Plastic Injection Moulder - Design exemption from AS9100 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 18

Similar threads

Top Bottom