PPAP re-submission as a result of facility move.

Q

Quality Diva

#1
We are a small Tier 1 automotive manufacturing facility and we are re-locating in 2 weeks. We of course have been asked to re-submit our PPAP's after the move. When they ask for a Level 3 submission, does that mean we have to go through all of our validation tests again? The only thing that is changing is our address.
 
Elsmar Forum Sponsor

Howard Atkins

Forum Administrator
Leader
Admin
#2
You are changing your adress together with your production.
This means that the machines etc are in a completly different environment, have to be leveled etc.
I beleive that they are justified in Level 3 PPAP.
 
Thread starter Similar threads Forum Replies Date
K Level 1 PPAP Submission APQP and PPAP 12
J Part submission warrant for Level 1 PPAP APQP and PPAP 1
M Level 3 PPAP submission of intentional defective parts APQP and PPAP 4
V PPAP documentation - Submission required in English APQP and PPAP 3
S Looking for a PPAP PSW, Part Submission Warrant, in Chinese APQP and PPAP 5
B PPAP: Submission, requirement to have all data in one file? APQP and PPAP 4
W Using a sub-supplier's PFMEA in PPAP Submission APQP and PPAP 4
B PPAP Level 3 Process Submission Capability, Accuracy and Stability - Processes, Machines, etc. 5
C Sample size for GM PPAP Submission APQP and PPAP 3
Q Faking Data - Refusing to sign Falsified PPAP Submission package Nonconformance and Corrective Action 27
S PPAP Supplier Submission Questions - Automotive Paint IATF 16949 - Automotive Quality Systems Standard 2
T Who signs PSW's? (PPAP Part Submission Warrants) APQP and PPAP 1
B TS16949 Annual PPAP Submission Requirements for Ford and Chrysler Parts IATF 16949 - Automotive Quality Systems Standard 2
R PPAP Submission vs. Completion all of the PPAP Elements APQP and PPAP 11
C PPAP Submission - Point in Time Record or Live Document APQP and PPAP 4
M PPAP Submission Template Document Control Systems, Procedures, Forms and Templates 2
S PPAP Requirements for Submission to our Customers for a New Supplier APQP and PPAP 1
B Injection Molding Capability Studies for PPAP Submission Capability, Accuracy and Stability - Processes, Machines, etc. 19
automoto PPAP Forms - Part Submission (Warrant) form .xls Document Control Systems, Procedures, Forms and Templates 2
P Supplier Responsibilities to Initiate a PPAP Submission APQP and PPAP 15
S Problem with Falsified Data in PPAP Submission APQP and PPAP 29
P Reverting back to old and previously approved material - PPAP Re-submission? APQP and PPAP 24
S Customer PPAP notification and submission for a Change APQP and PPAP 2
P PPAP Approval - Customer approval of PSW (part submission warrant) APQP and PPAP 5
H How to refuse PPAP submission to a customer? APQP and PPAP 7
P PPAP submission for a new customer of an existing product APQP and PPAP 7
I Confused on PPAP re-submission - Help on PSW (Part Submission Warrant) APQP and PPAP 3
S New Edition of Ford Phased PPAP Submission Check List APQP and PPAP 9
S Supplier requesting Customer PPAP submission APQP and PPAP 5
R Engineering changes for customer notification - PPAP Submission APQP and PPAP 5
S PPAP Submission Required for Electronics Components i.e., Resistors, Capacitors, etc. APQP and PPAP 3
W PPAP Submission Items - Metal Stamping - Tooling Transfer, Replacement, Refurbishment APQP and PPAP 6
B PPAP Document Submission and Retention requirements APQP and PPAP 21
M How to do a PPAP Plan Submission - What do I submit? APQP and PPAP 4
B Quality Stand Down form - Part of a PPAP submission to Johnson Controls Document Control Systems, Procedures, Forms and Templates 12
kedarg6500 PPAP Purpose And Benefits - What is the purpose of PPAP Submission? APQP and PPAP 28
B New PSW (Part Submission Warrant) - 4th Edition PPAP Manual APQP and PPAP 38
J Outside vendor (supplier) Certified to do GMW3359 - Certification for PPAP submission Supplier Quality Assurance and other Supplier Issues 9
M how to decide the submission level for PPAP APQP and PPAP 2
A ProE for PPAP - Has anyone used ProE modelling tool during PPAP submission? Quality Assurance and Compliance Software Tools and Solutions 1
Y PPAP requirements: Submission date and PSW (Statistical Process Package) APQP and PPAP 6
D Seeking CURRENT PPAP Part Submission Warrant APQP and PPAP 7
C New PPAP submission required when changing part number? APQP and PPAP 11
A Help needed for PPAP submission requirements including contents APQP and PPAP 3
J GM PPAP Specific Requirements - How many pieces for layout, submission - Gage R&R? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
J PPAP Submission Package - Tier II supplier to a Tier I APQP and PPAP 14
J PPAP (Production Part Approval Process) Submission Level Differences - Forms attached APQP and PPAP 17
S PPAP and ISO/TS 16949 - PPAP Submission - What are the SHALLs? APQP and PPAP 17
Q Level of PPAP submission for Subcontractor APQP and PPAP 3
Stuart Andrews Design Record Changes and PPAP Re-submission? Design and Development of Products and Processes 13

Similar threads

Top Bottom