Do any of you have experiance with this Zinc plating specification. I'm trying to figure out what test need to be performed by our suppliers in order to PPAP. The spec list a bunch of test like:
  • ISO 1463 microscopic test to measure plating thickness (Code A is 10 g/m^2 )
  • GMW3286 salt spray min 24 hours to red rust
  • GMW14729 humidity testing for Adhesion
  • GMW14829 tape test for adhesion
If a platers PPAPs stamping made from 2340 steel, do they have to do all these test. I'm used to just seeing salt spray test submitted. I would like to talk to someone about this.
 
J

JLang

Vardar,

I have not worked specifically with that GM specification before, but it is pretty standard in our company to ask our suppliers to provide all testing that is required by the specification. If our suppliers cannot provide specific tests we will then send parts out to an A2LA accredited lab for those tests. We generally try to avoid submitting a plated part without full testing.

Have you talked to you customer on this to see what their requirements are? Do they require all of the testing or just the salt spray testing?

I have seen cases before where the customer is alright with just plating thickness and salt spray test submissions and will bypass the adhesion and humidity tests.

The positive is that it is only a 24 hour salt spray which means you could probably get all four of those tests done for relatively cheap depending on the lab you use (200-300 dollars would probably be a safe bet).
 

Jim Wynne

Leader
Admin
Do any of you have experiance with this Zinc plating specification. I'm trying to figure out what test need to be performed by our suppliers in order to PPAP. The spec list a bunch of test like:
  • ISO 1463 microscopic test to measure plating thickness (Code A is 10 g/m^2 )
  • GMW3286 salt spray min 24 hours to red rust
  • GMW14729 humidity testing for Adhesion
  • GMW14829 tape test for adhesion
If a platers PPAPs stamping made from 2340 steel, do they have to do all these test. I'm used to just seeing salt spray test submitted. I would like to talk to someone about this.

The time to deal with this is in the beginning. The best way I've found is to get a quote from a qualified independent lab and include it as line items in the quotation. Without a specific waiver from your customer you're obligated to have all of the testing done.
 
Last edited:
V

vardar3

I talked about it with our plater. It appears that the humidity test and tape adhesion are for painted parts, so all that is required for Phos and Oil is the plating thickness and salt spray. Looking at previous PPAP it appears that's all that was passed on to the customer and they accepted.
 
Last edited by a moderator:
Thread starter Similar threads Forum Replies Date
A Help needed for PPAP submission requirements including contents APQP and PPAP 3
C PPAP requirements for consumer product APQP and PPAP 2
R PPAP Requirements for Tool Repair or Refurbishment APQP and PPAP 5
P Managing How PPAP Requirements are Communicated in the Manufacturing Process and to Suppliers APQP and PPAP 5
K OEM specific requirements - PPAP was rejected by STA Customer and Company Specific Requirements 5
Pau Calvo PPAP customer requirements in the APQP APQP and PPAP 25
eule del ayre List of Level 3 PPAP requirements for automotive suppliers APQP and PPAP 20
P Paint shop vs PPAP requirements IATF 16949 - Automotive Quality Systems Standard 5
Sidney Vianna AS9100 News PPAP in the Aerospace Sector - What is it? AS9145 - Requirements for Advanced Product Quality Planning and Production Part Approval Process AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 10
M Annual Layout requirements for PPAP/Control Plan FMEA and Control Plans 6
G Supply Chain PPAP Requirements APQP and PPAP 11
P Automotive Supplier PPAP Level Requirements Supplier Quality Assurance and other Supplier Issues 12
G PPAP 4th edition or VDA - VW Requirements APQP and PPAP 2
Y Customer Specific PPAP Level 3/4 Requirements - Fastener Manufacturer APQP and PPAP 2
A Cost of Deviating Away From PPAP Requirements APQP and PPAP 3
V Inactive Gauge Retention Time - PPAP Section 6 Requirements APQP and PPAP 1
I AS9100 PPAP requirements for outside Heat Treat vendors/suppiers AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
M PPAP requirements when adding Part Transfer Robots between Machines APQP and PPAP 1
P Bulk Material Requirements Checklist to send along with my PPAP APQP and PPAP 2
B Bulk Materials (Lead {Pb} Alloys) PPAP Requirements APQP and PPAP 5
T PPAP Requirements for Contract Manufacturers APQP and PPAP 4
J PPAP (Production Part Approval Process) Requirements for Annual Revalidations APQP and PPAP 1
V PPAP Requirements for Plating a "Family of Parts" APQP and PPAP 8
P PPAP Requirements for Sub-Assemblies APQP and PPAP 6
V Plating Supplier PPAP Revalidation Requirements - A-Coat GM 9984132 Plating Process APQP and PPAP 1
V PPAP - Requirements when Cpk is <1.67 - 100% Sort for Defectives APQP and PPAP 8
R Does anyone have the list of Toyota PPAP requirements? APQP and PPAP 6
M For Bulk Material (eg. paint), are there any guidelines for Ford PPAP Requirements? APQP and PPAP 1
B TS16949 Annual PPAP Submission Requirements for Ford and Chrysler Parts IATF 16949 - Automotive Quality Systems Standard 2
B TS 16949 PPAP/ Layout Inspection Frequency Requirements APQP and PPAP 8
Q Level of PPAP - Bulk Chemicals Supplier Requirements APQP and PPAP 2
F PPAP Material Test Results Requirements - Material Supplier Identification QS-9000 - American Automotive Manufacturers Standard 1
S PPAP Requirements for Submission to our Customers for a New Supplier APQP and PPAP 1
Q Supplier PPAP Requirements - TS 16949 Clause 7.3.6.3 IATF 16949 - Automotive Quality Systems Standard 12
S Can PPAP be submitted when not all customer requirements can be met? APQP and PPAP 5
K Supplier PPAP Requirements - Level 3 or Level 4 APQP and PPAP 6
J PPAP Requirements - Suppliers who are changing their Suppliers APQP and PPAP 7
L PPAP List Requirements - Molds, Tools or the Checking Tools? APQP and PPAP 5
J Requirements for Retaining PPAP Master Samples APQP and PPAP 2
J Prior Notice of Sub-Supplier or Material Source Change - PPAP Requirements Question APQP and PPAP 13
J PPAP Requirements Question APQP and PPAP 4
S PPAP requirements for sub-suppliers APQP and PPAP 5
C Honda PPAP requirements APQP and PPAP 12
H Requirements in TS for PPAP - Full PPAP or as per Customer Requirement? IATF 16949 - Automotive Quality Systems Standard 14
S Are the AIAG document (FMEA, PPAP, SPC, MSA, APQP) guidelines or requirements FMEA and Control Plans 6
K PPAP Requirements for Raw / Bulk Materials? APQP and PPAP 6
R GM revised its Specific Requirements for TS16949 and PPAP 4th, effective immediately Customer and Company Specific Requirements 4
B PPAP Document Submission and Retention requirements APQP and PPAP 21
B PPAP Requirements - Laboratory results and IMDS system RoHS, REACH, ELV, IMDS and Restricted Substances 12
M DaimlerChrysler (DCX) Customer Specific Requirements for PPAP 4th Edition Customer and Company Specific Requirements 8

Similar threads

Top Bottom