PPAP Submission Package - Tier II supplier to a Tier I

B

Bill Ryan - 2007

#11
As an organization/supplier you are required to submit/maintain a level 3 PPAP
I totally agree!!! I do maintain "Level 3" documentation, etc. The DFMEA is NOT an element of my "Level 3" as stated in I.2.2.4 of the PPAP manual (we are not "design responsible"). I guess I'm saying that I agree with my customers when they say I don't need an "exception" procured, because it is their DFMEA.


Failure to have this documentation constitutes a nonconformance.
I disagree, totally and I don't see how an auditor could even think of writing it up as one.

As far as "badgering" my customers for something I know they are not going to give me, I don't believe in it. There are times when being too "anal" with a customer gets in the way of forming, or can ruin, a "productive relationship".

Sorry. I don't mean to make this into an attack. IMO, as long as the B3 and Tier 1s (and even some of my Tier 2s) keep bastardi*ing standards and moving "the target", we suppliers don't stand much of a chance.

Bill
 
Elsmar Forum Sponsor
J

JaySturgeon

#12
Thanks for all the input.

Thanks Mike...

I totally agree with you. Badgering a customer is like arguing with an auditor. Futile exercise.

Thanks to all for your input. It is helpful to see how others view a situation.

So bottom line:
Do I use the templates I have made for those items I don’t have or am I better off to do what I’ve been doing and leave them out? Thinking, based on all the input, of leaving them out. Just do not want to get this submission rejected.
:bigwave:
 
B

Bill Ryan - 2007

#14
I might suggest using the templates. That way your customer sees that you have, at least, considered all the "missings".

Bill
 
C

Chemman

#15
Tier 2 supplier, not design responsible, and do not receive DFMEA despite all requests. We write the PFMEA to the best of our knowledge of the product and in consideration of designated characteristics on the drawing. While we have instructed our R&D group not to do so (not 9001), often they are asked to write the DFMEA for the customer for our product! We do not provide the PFMEA in the PPAP submission, but provide a statement that it is proprietary to our process and is available for review with customers. I have many trips to the customer for a 1 hr meeting only to fly back after meeting with SQEs that knew nothing about what you where talking about.

Chemman
 
Thread starter Similar threads Forum Replies Date
Q Faking Data - Refusing to sign Falsified PPAP Submission package Nonconformance and Corrective Action 27
Y PPAP requirements: Submission date and PSW (Statistical Process Package) APQP and PPAP 6
J Part submission warrant for Level 1 PPAP APQP and PPAP 1
M Level 3 PPAP submission of intentional defective parts APQP and PPAP 4
V PPAP documentation - Submission required in English APQP and PPAP 3
S Looking for a PPAP PSW, Part Submission Warrant, in Chinese APQP and PPAP 5
B PPAP: Submission, requirement to have all data in one file? APQP and PPAP 4
W Using a sub-supplier's PFMEA in PPAP Submission APQP and PPAP 4
B PPAP Level 3 Process Submission Capability, Accuracy and Stability - Processes, Machines, etc. 5
C Sample size for GM PPAP Submission APQP and PPAP 3
S PPAP Supplier Submission Questions - Automotive Paint IATF 16949 - Automotive Quality Systems Standard 2
T Who signs PSW's? (PPAP Part Submission Warrants) APQP and PPAP 1
B TS16949 Annual PPAP Submission Requirements for Ford and Chrysler Parts IATF 16949 - Automotive Quality Systems Standard 2
R PPAP Submission vs. Completion all of the PPAP Elements APQP and PPAP 11
C PPAP Submission - Point in Time Record or Live Document APQP and PPAP 4
M PPAP Submission Template Document Control Systems, Procedures, Forms and Templates 2
S PPAP Requirements for Submission to our Customers for a New Supplier APQP and PPAP 1
B Injection Molding Capability Studies for PPAP Submission Capability, Accuracy and Stability - Processes, Machines, etc. 19
automoto PPAP Forms - Part Submission (Warrant) form .xls Document Control Systems, Procedures, Forms and Templates 2
P Supplier Responsibilities to Initiate a PPAP Submission APQP and PPAP 15
S Problem with Falsified Data in PPAP Submission APQP and PPAP 29
P Reverting back to old and previously approved material - PPAP Re-submission? APQP and PPAP 24
S Customer PPAP notification and submission for a Change APQP and PPAP 2
P PPAP Approval - Customer approval of PSW (part submission warrant) APQP and PPAP 5
H How to refuse PPAP submission to a customer? APQP and PPAP 7
P PPAP submission for a new customer of an existing product APQP and PPAP 7
I Confused on PPAP re-submission - Help on PSW (Part Submission Warrant) APQP and PPAP 3
S New Edition of Ford Phased PPAP Submission Check List APQP and PPAP 9
S Supplier requesting Customer PPAP submission APQP and PPAP 5
R Engineering changes for customer notification - PPAP Submission APQP and PPAP 5
S PPAP Submission Required for Electronics Components i.e., Resistors, Capacitors, etc. APQP and PPAP 3
W PPAP Submission Items - Metal Stamping - Tooling Transfer, Replacement, Refurbishment APQP and PPAP 6
B PPAP Document Submission and Retention requirements APQP and PPAP 21
M How to do a PPAP Plan Submission - What do I submit? APQP and PPAP 4
B Quality Stand Down form - Part of a PPAP submission to Johnson Controls Document Control Systems, Procedures, Forms and Templates 12
kedarg6500 PPAP Purpose And Benefits - What is the purpose of PPAP Submission? APQP and PPAP 28
B New PSW (Part Submission Warrant) - 4th Edition PPAP Manual APQP and PPAP 38
J Outside vendor (supplier) Certified to do GMW3359 - Certification for PPAP submission Supplier Quality Assurance and other Supplier Issues 9
M how to decide the submission level for PPAP APQP and PPAP 2
A ProE for PPAP - Has anyone used ProE modelling tool during PPAP submission? Quality Assurance and Compliance Software Tools and Solutions 1
D Seeking CURRENT PPAP Part Submission Warrant APQP and PPAP 7
C New PPAP submission required when changing part number? APQP and PPAP 11
A Help needed for PPAP submission requirements including contents APQP and PPAP 3
J GM PPAP Specific Requirements - How many pieces for layout, submission - Gage R&R? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 4
J PPAP (Production Part Approval Process) Submission Level Differences - Forms attached APQP and PPAP 17
S PPAP and ISO/TS 16949 - PPAP Submission - What are the SHALLs? APQP and PPAP 17
Q Level of PPAP submission for Subcontractor APQP and PPAP 3
Stuart Andrews Design Record Changes and PPAP Re-submission? Design and Development of Products and Processes 13
B PPAP submission level classification - One dimension on print is changed APQP and PPAP 16
Q PPAP re-submission as a result of facility move. APQP and PPAP 2