Prioritized reduction plan on scrap not being corrected by corrective action

D
#1
Just had assessment audit. Everything went well -16 minors.
But I took a hit for not having a prioritzed reduction plan on scrap not being corrected by corrective action. If corrective action hads been taken, I cna't use that. He wants to see a reduction plan on the scrap we do nothing with. Any ideas?
 
Elsmar Forum Sponsor

Marc

Fully vaccinated are you?
Leader
#4
I think what they are looking at here is the theory you are never at a point where scrap is eliminated - so - they ask for a 'plan'. Your plan would be based (at least in part) upon identified nonconformances, not a single nonconformance and it would be 'living' (that is it will change with time as new nonconformances are identified). Reviews and updates of FMEAs and control plans would probably be part of the plan.

Did you ask where (specifically - paragraph number, etc.) in QS9000 this is a stated requirement?
 
Thread starter Similar threads Forum Replies Date
A Prioritized Reduction Plan & Kaizen IATF 16949 - Automotive Quality Systems Standard 1
M Prioritized Reduction Plan - TS 16949 Clause 4.13.2.1 - Meeting this requirement? QS-9000 - American Automotive Manufacturers Standard 3
J Prioritized Reduction Plans - What is the intent of section 4.13.2.1? Nonconformance and Corrective Action 1
D Prioritized Action Plan - Start by identifying major scrap items/categories/costs? QS-9000 - American Automotive Manufacturers Standard 5
M CI Prioritized Action Plan QS-9000 - American Automotive Manufacturers Standard 1
P QS-9000 Clause 4.2.5 - Prioritized Action Plans Preventive Action and Continuous Improvement 9
N ISO 13485 Scope Reduction Other ISO and International Standards and European Regulations 2
Q NACE Code 25.6 no reduction in CB audit days? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 23
O MDSAP Reduction in Scope Other Medical Device Related Standards 0
D Reduction of software class based on multiple external risk controls IEC 62304 - Medical Device Software Life Cycle Processes 5
Q Information for safety EN ISO 14971:2012 - Customer Risk Reduction ISO 14971 - Medical Device Risk Management 6
B Proactive efforts to reduce risk - PFMEA risk reduction activities IATF 16949 - Automotive Quality Systems Standard 8
K Risk Reduction by Risk Control: IEC:62304-Class C ISO 14971 - Medical Device Risk Management 15
F Calculation of reduction on audit time - IAF MD1:2007, IAF MD5:2015 and IAF MD11:2013 General Auditing Discussions 1
M Severity Reduction in a Design FMEA (DFMEA) FMEA and Control Plans 26
0 Calculation of Contamination Reduction Efficiency Statistical Analysis Tools, Techniques and SPC 4
A Destructive Test Sample Size Reduction Statistical Analysis Tools, Techniques and SPC 10
W Justifying an Inspection Reduction Plan to a Customer Statistical Analysis Tools, Techniques and SPC 3
C Setup Time Reduction Project - How big should my team be? Six Sigma 2
W Complaint Code - Sample Size Reduction Inspection, Prints (Drawings), Testing, Sampling and Related Topics 14
B Contour Plots of Time, Temperature and Log Reduction of Cells Using Minitab Software 9
P Reduction in the Inspection Frequency - Is approval required? IATF 16949 - Automotive Quality Systems Standard 1
D Defibrillation Energy Reduction ? PWB Connector Pitch Spacing IEC 60601 - Medical Electrical Equipment Safety Standards Series 5
S Medical Device or Cosmetic Device in Korea? Hand Held Wrinkle Reduction LED Light Other Medical Device Regulations World-Wide 1
S Medical Device or Cosmetic Device in Japan? Hand Held Wrinkle Reduction LED Light Japan Medical Device Regulations 3
R EMS Programme Target is Reduction in CO2 Emission Miscellaneous Environmental Standards and EMS Related Discussions 5
K Energy Reduction Objectives and Targets help ISO 14001:2015 Specific Discussions 2
J Reduction of Pull Off Test Inspection Frequency - Capability Query Quality Tools, Improvement and Analysis 1
N Usability Formula to Predict Use Error Reduction IEC 62366 - Medical Device Usability Engineering 6
J Cost Reduction Information Request Manufacturing and Related Processes 9
J Is anyone using "Costaware" Cost Reduction Software? Quality Assurance and Compliance Software Tools and Solutions 0
Howard Atkins FMEA RPN Reduction Process FMEA and Control Plans 4
Z Rework Reduction Six Sigma Project - Need help Six Sigma 5
P Risk Analysis and Risk Reduction requirements in 7.2.2.2 IATF 16949 - Automotive Quality Systems Standard 8
A Reduction of Pages in Work Instructions and Procedures Document Control Systems, Procedures, Forms and Templates 5
bobdoering Ford Executives To Take Thirty Percent Salary Reduction. World News 7
Ajit Basrur Reduction of calibration frequency for CMM (coordinate measuring machine) General Measurement Device and Calibration Topics 9
R Cost Reduction Calculation Formula - KPI (Key Performance Indicators) IATF 16949 - Automotive Quality Systems Standard 5
C What would be the Cost Reduction Activities for HR Department ? Training - Internal, External, Online and Distance Learning 9
D Waste Reduction by Implementation of Lean - Project Report Lean in Manufacturing and Service Industries 10
C Scrap Reduction with PF/CE/CNX/SOP Methodology The Reading Room 8
D Business Case for Lead Time Reduction Project Lean in Manufacturing and Service Industries 9
A Lead time reduction project on several processes Lean in Manufacturing and Service Industries 6
Q Reduction Of Foreign Matter (Contamination) Complaints in your Factory Manufacturing and Related Processes 6
CarolX PPM Reduction Action Plans - Goal of 10 PPM's at Production Launch IATF 16949 - Automotive Quality Systems Standard 3
T PPM Production Launch and Reduction Action Plan examples needed Document Control Systems, Procedures, Forms and Templates 3
M Cost Avoidance Calculation - Scrap Reduction Statistical Analysis Tools, Techniques and SPC 4
S Factory Overhead Cost Reduction Misc. Quality Assurance and Business Systems Related Topics 9
U Documentation Reduction - Over Documented ISO 9001:2000 QMS Document Control Systems, Procedures, Forms and Templates 23
B Severity Reduction by Product or Process Design Change? Seeking Good Example Design and Development of Products and Processes 2

Similar threads

Top Bottom