SBS - The best value in QMS software

Process Changes, but Work Instructions/Process Maps are not updated

A

azuker

#1
If during an employee interview, an internal auditor finds that a process has changed, but work instructions and process maps have not been updated to reflect that change, how should that finding be reported/classified?
 
Elsmar Forum Sponsor

Stijloor

Staff member
Super Moderator
#2
That's a nonconformity. Look at similar processes to ensure that this is not a systemic issue. You provide the objective evidence, write a CAR and submit to the Process Owner.
 
A

azuker

#3
Thank you for that confirmation. In this instance, a workflow was changed to make an improvement. The change was communicated to staff via email and implemented, but the work instruction and process map that support the procedure had not been updated at the time of audit.
 

Stijloor

Staff member
Super Moderator
#4
Thank you for that confirmation. In this instance, a workflow was changed to make an improvement. The change was communicated to staff via email and implemented, but the work instruction and process map that support the procedure had not been updated at the time of audit.
Still a nonconformity. Obvious weakness in the change management process. When I was auditing, one of the most recurring issues: poor change control - any change. Employees not aware and/or documents not updated.
 

insect warfare

QA=Question Authority
Trusted Information Resource
#5
Thank you for that confirmation. In this instance, a workflow was changed to make an improvement. The change was communicated to staff via email and implemented, but the work instruction and process map that support the procedure had not been updated at the time of audit.
IMO, you should write an NCR against the document control and/or change control processes and assign CA to those process owners - there's a disconnect there, and that audit trail should be followed to determine just how bad the disconnect really is.

Brian :rolleyes:
 
#6
If during an employee interview, an internal auditor finds that a process has changed, but work instructions and process maps have not been updated to reflect that change, how should that finding be reported/classified?
For a start, you don't report it based on what someone says has happened. It may be inaccurate and you might suspect them (if you know them) of less than good motives. Hence, you should obtain objective evidence, first hand, if you can, PLUS the results of following this different process. If you go around reporting what someone tells you without validation, people will, eventually, stop talking to you! You'll have to start your audit with "You have the right to remain silent..."

So, did you check and validate what they said happens? Did you see what the impact was on the result? I'd suggest it's NOT a document control issue - that's just a symptom and management don't get interested in documents. The REASON for documents not being changed is where you need to discover the issue. Is it planning or process change control etc. as Jan suggests. Reporting documentation issues is a cop out.
 
A

azuker

#7
Hi! The auditor has evidence of email communication from the process owner to staff members that outlines the change in the process, so there is more evidence to go by than just word of mouth. The result of the change is an improvement in the flow of work.

Should the auditor interview the process owner to investigate the reason behind why the work instructions and process maps have not been updated to reflect the changes?

Your input is appreciated, thanks! :)
 
#8
Hi! The auditor has evidence of email communication from the process owner to staff members that outlines the change in the process, so there is more evidence to go by than just word of mouth. The result of the change is an improvement in the flow of work.

Should the auditor interview the process owner to investigate the reason behind why the work instructions and process maps have not been updated to reflect the changes?

Your input is appreciated, thanks! :)
Good info! Yes, indeed! It now seems to me that the Process Owner doesn't understand the use of the QMS to achieve control over changes. Of course, the auditor should verify what provisions are made for the change process before hand, so that they can compare the story of the process owner to what SHOULD happen. Maybe the process is flawed and the Process Owner was doing the best they *thought* they could do (I'm wondering also what the MR is doing if the process is already broken so that management wouldn't know to use it, change it, improve it, too, of course)

See why dismissing this as "document control" is misleading?
 

John Broomfield

Staff member
Super Moderator
#9
azuker,

Your nonconformity statement perhaps:

Requirement: Documented procedures shall be reviewed and revised as necessary - 4.2.3b
Evidence: List the examples of process v procedure differences perhaps in a table and cite the emailed changes.
Nature: Failure to update the documented procedure(s) to specify the way the process is actually carried out.

You may need to refer to ISO 9000, the normative standard's definition of procedure.

John
 
Last edited:
#10
azuker,

Your nonconformity statement perhaps:

Requirement: Documented procedures shall be reviewed and revised as necessary (to reflect the actual undocumented procedure - 4.2.3b)
Evidence: List the examples of process v procedure differences perhaps in a table and cite the emailed changes.
Nature: Failure to update the documented procedure(s) to specify the way the process is actually carried out.

You may need to refer to ISO 9000, the normative standard's definition of procedure.

John
But John - you have put YOUR words into a requirement and called it an ISO requirement! Where does it say, in 4.2.3b "to reflect the actual undocumented procedure"?

If you presented that to me, I'd be asking where you learned to write an NC statement!

As I pointed out earlier, there's a bigger fish to fry than a simple document control issue...If the auditor chooses to bring value to management from their efforts. No wonder many organizations rarely see anything of interest from their audits!
 
Thread starter Similar threads Forum Replies Date
R Changes vs CMO - How can we simplify this process? Supplier Quality Assurance and other Supplier Issues 3
L Process changes and biocompatibility (ISO 10993-1) Other Medical Device Related Standards 1
K Changes in process dispersion, and location hypotheses tests Using Minitab Software 3
V IATF 16949 9.2.2.1 Internal Audit Program - "Process Changes" IATF 16949 - Automotive Quality Systems Standard 11
M Informational New Zealand – Changes to Medical Device Adverse Event Reporting process Medical Device and FDA Regulations and Standards News 0
S Qualification Builds & Process Changes (AS9102 - First Article Inspection) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
O PFMEA - Reducing Severity (S) Ranking - Manufacturing Process Design Changes FMEA and Control Plans 4
Q Form for Managing Coating Process Parameter Changes during Production Document Control Systems, Procedures, Forms and Templates 2
J Process Changes - Customer Notification Requirements APQP and PPAP 12
R Verification of Process Changes (AS9100 clause 7.5.1.2) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
AnaMariaVR2 FDA, Suppliers, & Process Changes [article] Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 0
M AS 9100 4.2.4 Process for making changes to records is not fully effective Quality Manager and Management Related Issues 4
V ECR/DCR Process Flow - What changes require an ECR vs. a DCR Document Control Systems, Procedures, Forms and Templates 2
L Changes to Manufacturing Process or Device with CE Marking CE Marking (Conformité Européene) / CB Scheme 2
M Changes Assessment as per AS9100 Clause 7.5.1.2 Control of Production Process Changes AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
T How to link Process Design Changes in Serial Production to Design & Development? Design and Development of Products and Processes 6
M Document Changes not affecting the process - Adding Logos, etc. Document Control Systems, Procedures, Forms and Templates 8
5 Changes to Control Plans or PFMEA's (Process FMEA) FMEA and Control Plans 6
M Process changes related to Components APQP and PPAP 4
R Informing Customers of Process Changes - Is this considered a process change? Manufacturing and Related Processes 19
R Preventative Action - Organizational ideas - Process or Work Instruction Changes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
S PPAP for my tier 3 suppliers - Sub-Supplier Process Changes APQP and PPAP 16
M Looking for Best Way to Communicate Process Changes to Production Employees ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
G Defining Process Changes and Customer Notification Requirements IATF 16949 - Automotive Quality Systems Standard 33
R Manufacturing Process Changes (7.1.4) IATF 16949 - Automotive Quality Systems Standard 3
J Process Control / Changes QS-9000 - American Automotive Manufacturers Standard 13
M Process changes QS-9000 - American Automotive Manufacturers Standard 5
K APQP - Is the APQP process supposed to include process changes? APQP and PPAP 2
J License renewal process in Iran Other Medical Device Regulations World-Wide 0
J Definition Outsourced process - Clear definition - 13485 Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 5
S IS0 13485 process flows ISO 13485:2016 - Medical Device Quality Management Systems 2
H Verification Process for the existing MDS Product IEC 62304 - Medical Device Software Life Cycle Processes 5
C Revalidation of Process Equipment for Equipment Transfered to New Facility. ISO 13485:2016 - Medical Device Quality Management Systems 5
Q Process map Evaluation and Analysis Method Process Maps, Process Mapping and Turtle Diagrams 3
S In process inspection Manufacturing and Related Processes 2
S Brexit 100% inspection during in process inspection Manufacturing and Related Processes 11
A Complaint review as part of the complaint handling process? ISO 13485:2016 - Medical Device Quality Management Systems 3
mustomutlu Process Validation Final Report Other Medical Device and Orthopedic Related Topics 2
Q Process Matrix_Audit Matrix Quality Management System (QMS) Manuals 4
Q Process description for outsourced processes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
Q Process matrix examples of ISO 9001 & 14001 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
J Need Help with FPY Data in Assembly Process Manufacturing and Related Processes 7
A When someone refuses to follow a process.... Misc. Quality Assurance and Business Systems Related Topics 27
E Software maintenance Process Software maintenance Process to IEC 6204? IEC 62304 - Medical Device Software Life Cycle Processes 3
R AS5553 Clause 3.1.7 f - "Implement a returns process....." AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
normhowe "The Problem with Quality Management: Process orientation, controllability and zero-defect processes as modern myths" Book, Video, Blog and Web Site Reviews and Recommendations 2
Judy Abbott General temperature used in the blasting process and laser process Manufacturing and Related Processes 2
B SOP for CNC turret punching machine for sheet metal process Manufacturing and Related Processes 0
A API Monogram audit review process Oil and Gas Industry Standards and Regulations 4
R AS9102 FAI Change in Material / Process Supplier AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4

Similar threads

Top Bottom