Process Correction vs. Corrective Action - Failure to React when Out of Control

Q

qsmso

#1
One case about Correction

Dear the Cove friends,
Regarding Correction and Corrective Action that we need to provide to our registrar when they audited and raised NC to us, I would like to ask a question.
If the content of NC was that “Auditor found on X-MR chart that there was not any of correction taken when the chemical composition (desire to be Special Characteristic item) was out control”, how to write correction and corrective action properly?
IMO, the corrective action might be training that operator for more understanding about SPC concept and guidance to take action when something abnormal. However, what about CORRECTION? Do we have to do anything about that X-MR chart? Or do we have to track back to the product to validate and assure product quality doesn’t have any effect.

Best regards,
QSMSO
:confused:
 
Elsmar Forum Sponsor
#2
Hello QSMSO,

I'm not sure I understand your distinction between corrective action and correction, but:

I think you are correct about the suggested training. It may very well be part of the corrective action regarding the root cause. What is your current procedure when the process goes out of control? In a case like this one, the registrar (as well as yourself) obviously wants to see that action is taken to get the process back on track and that the action is somehow registered.

As for the product in question: If you in fact determine that it was affected in a negative way, you need to look at (if we are talking about ISO 9001:2000) clause 8.3, control of nonconforming product..

/Claes
 
Q

qsmso

#3
Thank you Claes,
I forgot to explain more details that the X-MR chart the auditor found was the quliaty record of the week prior to the audit. (Out of control happenned on Dec 10th, but auditor audited on Dec 16th.
So, we are not really know how to take correction, whether with the control chart, the product or either.

Thank you
 
M

M Greenaway

#4
qsmo

I would say it is your choice on whether or not you correct the product and/or the chart - only you know how important it is, and the associated risks.
 
D

D.Scott

#5
qsmo - The advice given is very good. I think you should look at this nonconformance as something deeper than just the control chart being out of control. Claes touched on the current procedure for OOC. I think you need to be sure there IS a procedure for taking action, and that it gets the results you want.

Training the operator won't solve the problem if another operator can make the same mistake. Training of all operators may be needed.

I also agree that the effect on the product has to be reviewed and a decision made as to effect.

When I have a nonconformance I try to address the immediate problem, determine a root cause and initiate a corrective action, train the affected people, then confirm the problem is fixed by auditing.

Dave
 

Marc

Fully vaccinated are you?
Staff member
Admin
#6
I may have missed something, but the two aspects are:<ol><li>Correction - What did you do to correct the problem at the time (also known as Reaction on a control plan), and <li>Corrective Action - An 8-D or whatever you want to call it which includes determining root cause and preventive action.</ol>
 

gpainter

Quite Involved in Discussions
#7
Correction- Immediate fix More than likely 100% inspection, Non-value added
CA- Permanent fix No more problem Value added
 

Raffy

Quite Involved in Discussions
#8
Does the definition for corrective and preventive action evolving through times? What I mean, when the transition to iSO9001:2000, does the definition for the Corrective and Preventive Action change?

Please comment.

Thanks and best regards,
Raffy
 
R

Randy Stewart

#9
Does the definition for corrective and preventive action evolving through times?
I think I know what you are asking and my answer would be no.
Way back in the '70s in the Navy we had to fill out what was called a TFR - Trouble Failure Report for every little problem found in the weapon system. These reports were sent to John Hopkins University for review and evaluation. Anyway, they had sections for CA, PA and suggested Permanent CA. In other words I have heard the same definitions for (wow) 30 years now!
I think what evolves is how we apply them in our "systems" and how our understanding of them matures.
 
Thread starter Similar threads Forum Replies Date
DuncanGibbons Process flow & PFMEA for production planning and simulation activities? Process Maps, Process Mapping and Turtle Diagrams 7
N Help with understanding Process Controls Manufacturing and Related Processes 4
M VDA 6.3 – Workshop for Certified Process Auditor VDA Standards - Germany's Automotive Standards 1
C Process Consistency Manufacturing and Related Processes 5
I PFD (Process Flow Diagram) approach. Setup details as part of PFD? Manufacturing and Related Processes 3
K Business Process Flowchart Process Maps, Process Mapping and Turtle Diagrams 2
L Looking for Control Plan and FMEA Stamping process FMEA and Control Plans 2
J License renewal process in Iran Other Medical Device Regulations World-Wide 0
J Definition Outsourced process - Clear definition - 13485 Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 5
S IS0 13485 process flows ISO 13485:2016 - Medical Device Quality Management Systems 2
H Verification Process for the existing MDS Product IEC 62304 - Medical Device Software Life Cycle Processes 5
C Revalidation of Process Equipment for Equipment Transfered to New Facility. ISO 13485:2016 - Medical Device Quality Management Systems 5
Q Process map Evaluation and Analysis Method Process Maps, Process Mapping and Turtle Diagrams 5
S In process inspection Manufacturing and Related Processes 2
S Brexit 100% inspection during in process inspection Manufacturing and Related Processes 11
A Complaint review as part of the complaint handling process? ISO 13485:2016 - Medical Device Quality Management Systems 3
mustomutlu Process Validation Final Report Other Medical Device and Orthopedic Related Topics 2
Q Process Matrix_Audit Matrix Quality Management System (QMS) Manuals 4
Q Process description for outsourced processes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
Q Process matrix examples of ISO 9001 & 14001 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
J Need Help with FPY Data in Assembly Process Manufacturing and Related Processes 7
A When someone refuses to follow a process.... Misc. Quality Assurance and Business Systems Related Topics 27
E Software maintenance Process Software maintenance Process to IEC 6204? IEC 62304 - Medical Device Software Life Cycle Processes 3
R AS5553 Clause 3.1.7 f - "Implement a returns process....." AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
normhowe "The Problem with Quality Management: Process orientation, controllability and zero-defect processes as modern myths" Book, Video, Blog and Web Site Reviews and Recommendations 2
Judy Abbott General temperature used in the blasting process and laser process Manufacturing and Related Processes 2
B SOP for CNC turret punching machine for sheet metal process Manufacturing and Related Processes 0
A API Monogram audit review process Oil and Gas Industry Standards and Regulations 4
R AS9102 FAI Change in Material / Process Supplier AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
A Process mapping Process Maps, Process Mapping and Turtle Diagrams 1
R MDEL Process Canada Medical Device Regulations 4
optomist1 Rates Daily or Hourly Process Improvement Training Consultants and Consulting 2
S Manufacturing Process FDA FOIA Medical Device and FDA Regulations and Standards News 3
S Manufacturing Process FDA FOIA US Food and Drug Administration (FDA) 4
B Toyota PPAP Process - Three Questions APQP and PPAP 4
R Changes vs CMO - How can we simplify this process? Supplier Quality Assurance and other Supplier Issues 3
A Ethics Committee Review Process for IVD Products EU Medical Device Regulations 2
V Laser Welding Process - Impact on Electrical Properties Reliability Analysis - Predictions, Testing and Standards 4
Q Process: Knowledge Section 7.1.6 of ISO 9001:2015 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
L Documented Information in Internal Audits Process (9.2) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
A Sampling plan for in-process QC (medical devices) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 13
rerusk1 MRB (Material Review Board) Process using MS Sharepoint or MS Teams Manufacturing and Related Processes 2
M Clinical Benefit of device that only aids in a process for managing or treating disease EU Medical Device Regulations 2
C In-process inspection - Tooling and assembly lines for automotive companies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
M Efficacy of an IT process after a cyber attack ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
N Sterilization Protocol Change in Validation Process and further impacts ISO 13485:2016 - Medical Device Quality Management Systems 1
N Riveting - special process Manufacturing and Related Processes 11
M Material incoming to the production process reflected in PFMEA FMEA and Control Plans 9
A API Spec Q1 Purchasing Process - Supplier Reevaluation based on Supplier Risks 5.6.1.4 Oil and Gas Industry Standards and Regulations 17
B Handling lower detection limits for SPC and process performance Statistical Analysis Tools, Techniques and SPC 1