Process FMEA (PFMEA) vs. Equipment FMEA (EFMEA) Differences

Y

Yew Jin

Hi guys,

1. What is the difference between the process FMEA and equipment FMEA?
(equipment is refer to the semi or fully automation)

2. How we want to do if there is overlapping on failure causes and effect when we implement these 2 FMEA? (When using the semi auto machine for a process) - some cases we confuse whether it is due to process or it is due to equipment.

3. If we go through on current control - prevention and detection, the team is loss especially when we did the equipment FMEA. Some of the member confuse by the term used, prevention = error proofing?

4. Is there any method to help us go smoothly when in the process of rating on the severity, occurance and detection? Most of the time the team member do not know how to rate with the existing control. This is very hard time in the whole FMEA implementation.

5. The team here set the priority of the action in 2 criteria,
a) RPN > 100
b) severity X detection = 81
I disagree on the b) as we should take action if there is any severity above 8 even the detection is high.

Please help!
:truce:
 

The Taz!

Quite Involved in Discussions
Re: Process FMEA vs Equipment FMEA

Hi. . . If I understand you correctly, you are developing a PFMEA for the process (Which includes the machine's cause/effect) and one for the machine itself.

Your PFMEA should include failure modes attributed to the machine/equipment. Your machine FMEA might include items such as periodic verification/validation of controls and sensors, and PM requirements that may prevent the failure modes found on the Process FMEA. It will also address PM issues to prevent downtime and maximize uptime. All can be included on the Process FMEA, but in doing a Machine FMEA, I think you will need to do one prior to actually selecting a specific piece of equipment because the equipment will need to meet all requirements for the product and process.

What I am saying amounts to using a PFMEA risk assessment to determine if a specific piece of production equipmewnt meets all criteria, and has the abilty to minimize the risks associated with the process. Also, as I stated earlier, what and when to review for PM purposes.

I hope I answered your question. . . with a FMEA, you only get out of it what you put into it.
 

Miner

Forum Moderator
Leader
Admin
Re: Process FMEA vs Equipment FMEA

1) Here are definitions from the Cove:

Types of Automotive FMEAs
Machinery FMEA – is used to analyze low-volume specialty machinery (equipment and tools), that allows for customized selection of component parts, machine structure, tooling, bearings, coolants, etc.
º Focuses on designs that improve the reliability and maintainability of the machinery for long-term plant usage.
º Considers preventive maintenance as a control to ensure reliability.
º Considers limited volume, customized machinery where large scale testing of a number of machines is impractical prior to production and manufacture of the machine.
º Considers parts that can be selected for use in the machine, where reliability data is available or can be obtained before production use.
Concept FMEA – is used to analyze concepts for systems and subsystems in the early stages.
° Focuses on potential failure modes associated with the functions of a concept proposal caused by design decisions that introduce deficiencies.
° Includes the interaction of multiple systems, and interactions between the elements of a system at concept stages.
° Would apply to all new machinery concepts that have never been done before, all new plant machinery layout, new architecture for machinery, etc.)
System FMEA – is used to analyze planned / proposed systems.
° Intended to transform an operational need into a description of system performance parameters and system configuration through the use of an interactive process of functional analysis, synthesis, optimization, design, test, and evaluation.
Design FMEA – is used to analyze products, high volume tools or standard machines, machine components, standard production tooling, etc., before they are released to production.
° Focuses on potential failure modes of products caused by design deficiencies.
° Focuses on parts that can be prototyped and tested or modeled before high volume production of the product is launched.
Process FMEA – is used to analyze manufacturing and assembly processes.
° Focuses on potential product failure modes caused by manufacturing or assembly process deficiencies.
° Useful in analyzing process steps that can influence the design of machinery, including selection of appropriate tooling and machinery component parts.

2) The goals of the two FMEAs are different and should be used for different reasons, so there should be little overlap.

3) Prevention is a control that detects a Cause before the defect has been produced. Detection detects the failure after it has been created.

4) Create your own rating scales with clear, specific definition for each. Base it on your existing controls, knowledge of occurrences and actual severities that you have seen.

5) I have seen the following:
Priority 1: Severity = 9 or 10
Priority 2: Severity X Occurrence = ##
Priority 3: S x O x D > ###
 
Last edited:
A

AndyJP - 2012

Re: Process FMEA vs. Equipment FMEA Differences

Miner has hit it on the head.

The simple prioroty is anything with a severity of a 9 or 10 you do first as a corrective action is mandated as it invloves safety. Then SxO with severity of 5 and above and an occurance of 5 and above mandate a corrective action. Then and only then look at RPN. To be RPN fixated is to be a fool!:cool:
 
R

ralphsulser

Re: Process FMEA vs. Equipment FMEA Differences

Miner has hit it on the head.

Then and only then look at RPN. To be RPN fixated is to be a fool!:cool:

Apparently some of the B3 have not become aware of this. ;-)
 
Y

Yew Jin

Re: Process FMEA vs. Equipment FMEA Differences

Thanks to all of you guys.

I believed the concept over here on the process and equipment FMEA is difference.

Management is looking on the machine FMEA which screen all the functionality on an auto machine such as loading function, XY movement, dispenser function, unloading function.

Such as the function do we consider the process?
I am confuse on the function and process for an auto machine for process which replace the manual process.

Can you guys provide me any FMEA for the machinery?

If we design a auto machinery to replace the manual process, should we do the process or machinery FMEA or both?
 

Stijloor

Leader
Super Moderator
Re: Process FMEA vs. Equipment FMEA Differences

Thanks to all of you guys.

I believed the concept over here on the process and equipment FMEA is difference.

Management is looking on the machine FMEA which screen all the functionality on an auto machine such as loading function, XY movement, dispenser function, unloading function.

Such as the function do we consider the process?
I am confuse on the function and process for an auto machine for process which replace the manual process.

Can you guys provide me any FMEA for the machinery?

If we design a auto machinery to replace the manual process, should we do the process or machinery FMEA or both?

Hello Yew Jin,

I am a little bit confused about what you're looking for.....:confused:

I decided to do a search. Here are the results. Is there anything that would help answering your questions?

Stijloor.
 
Y

Yew Jin

Actually I am confuse by the management concept.

Correct me if I am wrong.

Machinery FMEA objective is to evalaute the risk of the machinery part and tools that will be replace or wear and tear. To fond which item to be the first priority to prevent.

Process FMEA objective is to evaluate the risk of the special cause in the process which will affect customer inculding internal and external product characteristic requirement.
 
Thread starter Similar threads Forum Replies Date
karinca PFMEA (Process FMEA) - Can be common for 3000 products? FMEA and Control Plans 2
N In-Process Production Test Stations in PFMEA (Process FMEA) FMEA and Control Plans 18
R Is PFMEA (Process FMEA) for OEM sufficient to address Risk? ISO 13485:2016 - Medical Device Quality Management Systems 7
Z Pass-Though Characteristics in PFMEA (Process FMEA) FMEA and Control Plans 2
R PFMEA (process FMEA) for Incoming Material stage FMEA and Control Plans 7
P PFMEA (Process FMEA) Recommended Actions help FMEA and Control Plans 9
G Very Basic PFMEA (Process FMEA) Guidelines FMEA and Control Plans 17
M PFMEA (Process FMEA) - What is the best approach? FMEA and Control Plans 14
M PFMEA (Process FMEA) for Attribute Data Inspection Process FMEA and Control Plans 2
T PFMEA (Process FMEA) Recommended Actions Column FMEA and Control Plans 10
B Process FMEA (PFMEA) Same Multiple Causes for Different Effects FMEA and Control Plans 6
M Changing PFMEA (Process FMEA) RPN Values based on a Rejection FMEA and Control Plans 5
Q Using a Custom Process FMEA (PFMEA) Form FMEA and Control Plans 4
D PFMEA (Process FMEA) Process and Rankings (S-O-D) Document Control Systems, Procedures, Forms and Templates 8
A PFMEA (Process FMEA) Detection Rating - Actions to Reduce RPN FMEA and Control Plans 3
L PFMEA (Process FMEA) Forms - Dyadem FMEA Software Products FMEA and Control Plans 5
L Rotational Molding and Machining PFMEA (Process FMEA) - Plastics - example wanted FMEA and Control Plans 6
Chennaiite PFMEA (Process FMEA) for Vehicle Assembly wanted FMEA and Control Plans 4
H How to perform interesting PFMEA (Process FMEA) Training Training - Internal, External, Online and Distance Learning 6
M PFMEA (Process FMEA - Potential Causes and Failure) - Operator's Role FMEA and Control Plans 11
5 Changes to Control Plans or PFMEA's (Process FMEA) FMEA and Control Plans 6
P PFMEA (Process FMEA) Acceptable Effectivity Rate for Reoccurances of Issues FMEA and Control Plans 1
T DFMEA (Design FMEA) - We already have a PFMEA (Process FMEA) FMEA and Control Plans 5
D Laser Welding PFMEA (Process FMEA) - Metal FMEA and Control Plans 15
Casana Detection level in PFMEA (Process FMEA) - Bulk Fluids FMEA and Control Plans 10
P Problem with "failure mode? interpretation in PFMEA (Process FMEA) FMEA and Control Plans 8
R Addressing Inspection in PFMEA (Process FMEA) FMEA and Control Plans 2
S Pfmea (Process FMEA) at Process Audit FMEA and Control Plans 4
J When to Update PFMEA (Process FMEA) - Rejection is found at the customer FMEA and Control Plans 12
V Integrating the FMEA process with problem investigation/RCA process and PFMEA FMEA and Control Plans 11
C DFMEA (Design FMEA) and PFMEA (Process FMEA) - Who should lead? FMEA and Control Plans 14
C PFMEA (Process FMEA) Detection Scale - Aerospace engine components FMEA and Control Plans 4
H How to Make PFMEA (Process FMEA) from the beginning to the end FMEA and Control Plans 4
H Corrective Action: When to update the Process FMEA (PFMEA) FMEA and Control Plans 15
M Process FMEA (PFMEA) Assumptions Regarding Causes Identification FMEA and Control Plans 6
M Process FMEA (PFMEA) for D.C. Welding of Sheet Metal Parts - Electrode Material FMEA and Control Plans 1
N How to Calculate RPN in Design FMEA (DFMEA) vs. Process FMEA (PFMEA) FMEA and Control Plans 9
J When to update a PFMEA (Process FMEA) FMEA and Control Plans 17
S Detection Criteria Examples - PFMEA (Process FMEA) - Emergency Safety Fixtures FMEA and Control Plans 2
E PFMEA (Process FMEA) Class Symbols FMEA and Control Plans 6
Kales Veggie Informational How to develop a Control Plan from a PFMEA (Process FMEA) FMEA and Control Plans 63
kedarg6500 Supplier PFMEA (Process FMEA) Audit Form FMEA and Control Plans 4
J Updating a PFMEA (Process FMEA) after a Process Failure FMEA and Control Plans 3
J The real Link between a PFMEA (Process FMEA) and the Control Plan FMEA and Control Plans 19
W Actual examples of FMEA (DFMEA, PFMEA) for Car Assembly Process IATF 16949 - Automotive Quality Systems Standard 5
L PFMEA (Process FMEA) issue about lower RPN - AIAG 3rd edition page 55 FMEA and Control Plans 13
M Connections between PFMEA (Process FMEA) and the Control Plan. FMEA and Control Plans 20
M PFMEA Severity - What is Process FMEA Severity estimation based on? FMEA and Control Plans 77
K Change in Occurrence for Low Volume Assembly Process FMEA (PFMEA) FMEA and Control Plans 8
M Include Risk of Rework in a PFMEA (Process FMEA)? FMEA and Control Plans 5