Re: FMEA Revision Requirements - Every six months?
FMEAs should be updated when:
- design of product is changed
- design of process is changed
- information becomes available that indicates a failure mode is missing, or a severity ranking is inaccurate, or a cause is missing, or probability of occurrence is inaccurate, etc. Such information may come about based on field failures, computer modeling, statistical studies, etc.