Hello everyone,
yesterday our new customer had an internal audit in our plant, one of open issues is " PFMEA does not cover overall processes, including <1>materials stock-in, <2>finished goods stock-in and <3>dock audit..." I have never seen a PFMEA involing incoming materials and out-going products. as we just perform incoming mat'l inspection and sampling check our finished goods. are such PFMEAs mandatory? as far as know, P--Process, only covers from the first working station to the last working station of an assembly line, excluding incoming / dock audit inspection. Am I right?
BTW, Our product is motor.
Thx in advance.:eek:
 
Elsmar Forum Sponsor

antoine.dias

Quite Involved in Discussions
#2
Process FMEA's

"Process" goes further than Manufacturing Process.

In ISO TS - item 7.3.1.1 it is stated that FMEA's ( and control plans ) should be developed to prepare for product realisation. And this is a lot more than only the manufacturing process.
On the other hand in item 7.3.3.2 there is a specific question for manufacturing process FMEA.

Hope this clarifies a bit.

Antoine
 

Howard Atkins

Forum Administrator
Staff member
Admin
#3
I have always beleived that the PFMEA should cover the whole process from receipt to dispatch.
Does your control plan and flow chart cover these areas?
If so then the PFMEA must as well.
 

Ron Rompen

Trusted Information Resource
#4
In the past, we restricted our PFMEA's to processes that we actually controlled. However, after much discussion with our major customers, and THEIR customers (Ford most especially) we have rethough our strategy.

We now include all processes, from raw material in, to finished goods out. We normally have several outsourced processes as well (deburring, heat treating, plating) and we try and identify the MAJOR potential failures in their processes, to show what WE are doing to either prevent or detect those failures.

One other thing that we have added is failures which relate to health and safety, since they impact our ability to meet customer requirements. I have shared a generic PFMEA which we have developed in the past, and would be happy to share it if anyone would like to see.
 

buffalo_hua

Starting to get Involved
#5
Helllo all,

thank you for your helps, but I am still confused about the control plan (CP) and PFMEA, yes, we have incoming material CP, production CP, dock audit CP for different stage use, olny Production CP prepared based upon the PFMEA, as to the other 2 types of CPs, we have no FMEA for reference except for the Key Control Characteristics in the engineering drawings. maybe it is a systematic problem in our plant?
I cannot find an FMEA reference manual in English version. Sigh~~~

Dear Mr. Ron Rompen,
could you please attach the past PFMEA of yours for our information? thanks a lot in advance!!

Buffalo
 

Ron Rompen

Trusted Information Resource
#6
Ask and ye shall receive.

The macro attached to this file is a non-entity....it actually serves no purpose (from a previous PFMEA revision).

If anything needs clarification, don't hesitate to ask.
 

Attachments

Caster

An Early Cover
Trusted Information Resource
#7
Flow/FMEA/Control Plan

buffalo_hua said:
Hello everyone,
yesterday our new customer had an internal audit in our plant, one of open issues is " PFMEA does not cover overall processes, including <1>materials stock-in, <2>finished goods stock-in and <3>dock audit..." I have never seen a PFMEA involing incoming materials and out-going products. as we just perform incoming mat'l inspection and sampling check our finished goods. are such PFMEAs mandatory? as far as know, P--Process, only covers from the first working station to the last working station of an assembly line, excluding incoming / dock audit inspection. Am I right?
BTW, Our product is motor.
Thx in advance.:eek:
Hi Buffalo_hua

We just got whacked pretty hard during our TS16949 audit for being "part" focused on our control plan.

They reminded us that first you map your process flow (sorry to say starting at receiving and ending at shipping), then you do FMEA to prioritize risks, then put in place controls in a control plan to mitigate those risks.

The reminded us it was a P for Process not P for Part control plan.

Like most auto suppliers, we just pulled the critical part dimensions off the customers print and called it done. D'oh!

So we have lots of work ahead of us...now that we see it more clearly we were missing many operations that can and have caused problems.

So I guess I agree with your customer. Dock to dock. Good luck.
 
S

Steve Magirias

#8
Thanks for the example PFMEA attached. Could you please send the subsequent control plan generated from this PFMEA as an example to be used for training purposes.

We are in our infancy of using FMEAs and Control Plans.

Thanks!
 
Thread starter Similar threads Forum Replies Date
J Process FMEA Template with examples - Cold and Hot Forged components FMEA and Control Plans 4
C FMEA Process assessment In the Draft for the AIAG/VDA FMEA Manual is gone FMEA and Control Plans 0
Jimmy123 Example of a P-Diagram for Process FMEA - Uncontrollable noises FMEA and Control Plans 39
eule del ayre Merging FMEA and Quality Control Process Flow FMEA and Control Plans 0
K AIAG/VDA FMEA & Process Control Plans FMEA and Control Plans 0
S New AIAG FMEA Process - How to complete the new format FMEA and Control Plans 32
K PFMEA (Process FMEA) - Can be common for 3000 products? FMEA and Control Plans 2
D Where does FMEA fit in your ISO 14971 Risk Management process? ISO 14971 - Medical Device Risk Management 13
N In-Process Production Test Stations in PFMEA (Process FMEA) FMEA and Control Plans 18
N Process FMEA Occurrence Ranking for New Process FMEA and Control Plans 3
G AIAG FMEA - Major customers of the FMEA process FMEA and Control Plans 3
E How do I create a FMEA for the Internal Audit process? Internal Auditing 11
D How to fill a Process FMEA - Three columns - Severity, occurrence and Detection FMEA and Control Plans 16
L Injection & Extrusion Process FMEA FMEA and Control Plans 1
S Pilot Process FMEA Occurence Rankings FMEA and Control Plans 4
K Process FMEA Ranking Table for for Landing Door of an Elevator FMEA and Control Plans 7
G Severity in Process FMEA for Rework Process FMEA and Control Plans 1
R Is PFMEA (Process FMEA) for OEM sufficient to address Risk? ISO 13485:2016 - Medical Device Quality Management Systems 7
H FMEA sample for complete CNC machining process FMEA and Control Plans 1
T Software for linking Process Flow Diagram, Process FMEA and Control Plan APQP and PPAP 9
V Process FMEA for Stamping Process FMEA and Control Plans 5
G FMEA for Steel Tube Process for Automotive FMEA and Control Plans 4
L Most appropriate Auditor to check the FMEA & PCP of a Manufacturing Process IATF 16949 - Automotive Quality Systems Standard 5
C List Error Proofing in the Process FMEA or the Control Plan FMEA and Control Plans 2
J Process FMEA w/ Contracted Manufacturing ISO 14971 - Medical Device Risk Management 2
B FMEA example for Cokemaking Process at a integrated Iron and Steelmaking Plant IATF 16949 - Automotive Quality Systems Standard 3
S FMEA Process Step or Current Control FMEA and Control Plans 3
Z Pass-Though Characteristics in PFMEA (Process FMEA) FMEA and Control Plans 2
Q Chrysler required FMEA and Control Plan Document Audit Forms and Process Audit Check FMEA and Control Plans 7
V Examples of Design and Process FMEA for Pharmaceutical Product Development ISO 14971 - Medical Device Risk Management 7
S Galvanize and Chrome Plating Process FMEA wanted FMEA and Control Plans 2
S Product FMEA vs. Process FMEA - Aerospace Industry Machine Shop FMEA and Control Plans 5
R PFMEA (process FMEA) for Incoming Material stage FMEA and Control Plans 3
P PFMEA (Process FMEA) Recommended Actions help FMEA and Control Plans 9
J What is Incorporation in Assembly/Manufacturing Process in FMEA? FMEA and Control Plans 4
A Will Inspection Process need an FMEA? FMEA and Control Plans 7
F Process FMEA for Welding and Laser Cutting FMEA and Control Plans 3
G Very Basic PFMEA (Process FMEA) Guidelines FMEA and Control Plans 17
R Process to use Special Characteristics as FMEA Inputs IATF 16949 - Automotive Quality Systems Standard 3
M PFMEA (Process FMEA) - What is the best approach? FMEA and Control Plans 14
F FMEA Optimization for our Die Setup Process FMEA and Control Plans 2
M PFMEA (Process FMEA) for Attribute Data Inspection Process FMEA and Control Plans 2
A Current Control Periodic Document Reviews - Process Updates in the FMEA FMEA and Control Plans 3
T PFMEA (Process FMEA) Recommended Actions Column FMEA and Control Plans 10
B Process FMEA (PFMEA) Same Multiple Causes for Different Effects FMEA and Control Plans 6
M Changing PFMEA (Process FMEA) RPN Values based on a Rejection FMEA and Control Plans 4
Chennaiite FMEA for Business Process Imported Legacy Blogs 6
K Does FMEA include Inspection Process? FMEA and Control Plans 11
Q Using a Custom Process FMEA (PFMEA) Form FMEA and Control Plans 4
H What should be included in a Machining Process FMEA? FMEA and Control Plans 8

Similar threads

Top Bottom