SBS - The best value in QMS software

Process Interaction - ISO 9001:2015

Q

qcstar

#1
Hello Members

Glad I came across this forum. As a quality consultant, I'm currently engaged in transition activities from ISO 9001:2008 to ISO 9001:2015. There are certain queries which requires clarifications. Appreciate your quick responses.

1. Will the Process interaction diagram differ in the 2015 standard from what we prepared in 9008 standard ?

2. Are there any tools available for calculating the number of days it would require for preparing just the transition documentation ? (One of my client requires just the document transition in accordance with 2015 revision. Any tool for calculation effort require for documentation phase).

Thanks in Advance Everyone.
 
Last edited by a moderator:
Elsmar Forum Sponsor

dsanabria

Quite Involved in Discussions
#2
Hello Members

Glad I came across this forum. As a quality consultant, I'm currently engaged in transition activities from ISO 9001:2008 to ISP 9001:2015. There are certain queries which requires clarifications. Appreciate your quick responses.

1. Will the Process interaction diagram differ in the 2015 standard from what we prepared in 9008 standard ?

2. Are there any tools available for calculating the number of days it would require for preparing just the transition documentation ? (One of my client requires just the document transition in accordance with 2015 revision. Any tool for calculation effort require for documentation phase).

Thanks in Advance Everyone.
in your statement you make a reference to ISP 9001 - typo?

Anyway - the processes of the company does not change. What is required is that you need to define the KPI, measure and determine if they meet requirements.

2. there are tools and standards for audit time but for preparation? Not sure what you are looking for... can you give us an example.
 
Q

qcstar

#3
@dsanabria, Thanks for bringing the error to my notice. Yeah its ISO and not ISP.

I agree the processes dont change so I'm planning ti retain interaction of processes from existing version to the ISO 9001:2015 version.

My 2nd query was one was my client requires only documents to be modifies in accordance with current ISO 9001 standard. Implementation and other related activities will be taken care by client itself.How can I calculate the number of days required for making document changes according to the latest standard

Thanks in Advance.
 

dsanabria

Quite Involved in Discussions
#4
@dsanabria, Thanks for bringing the error to my notice. Yeah its ISO and not ISP.

I agree the processes dont change so I'm planning ti retain interaction of processes from existing version to the ISO 9001:2015 version.

My 2nd query was one was my client requires only documents to be modifies in accordance with current ISO 9001 standard. Implementation and other related activities will be taken care by client itself.How can I calculate the number of days required for making document changes according to the latest standard

Thanks in Advance.
First - Do a GAP analysis of what needs to change - this could take 1 or 2 days or more.- depends on the complexity of the company and complexity of documentation.

go to: IAQG: Requirements for a GAP analysis worksheet and additional information.
 

howste

Thaumaturge
Super Moderator
#5
I agree with dsanabria. There is no way to know what level of effort is needed until you know what they already have and what needs to be changed.
 

Golfman25

Trusted Information Resource
#6
@dsanabria, Thanks for bringing the error to my notice. Yeah its ISO and not ISP.

I agree the processes dont change so I'm planning ti retain interaction of processes from existing version to the ISO 9001:2015 version.

My 2nd query was one was my client requires only documents to be modifies in accordance with current ISO 9001 standard. Implementation and other related activities will be taken care by client itself.How can I calculate the number of days required for making document changes according to the latest standard

Thanks in Advance.
Depends on how fast you can type. :)
 
Q

qcstar

#7
Thanks everyone for your inputs.


This is a small company with 20-50 employees,already have 9001:2008 in place.scope includes design and development.How many days document effort would take for changing to new version 2015. I estimated about 3 weeks. Not sure if its less or more.

Any suggestion,inputs are welcome...Thanks in advance.
 

Golfman25

Trusted Information Resource
#8
Thanks everyone for your inputs.


This is a small company with 20-50 employees,already have 9001:2008 in place.scope includes design and development.How many days document effort would take for changing to new version 2015. I estimated about 3 weeks. Not sure if its less or more.

Any suggestion,inputs are welcome...Thanks in advance.
Like others said, it depends on where you are starting from. We are changing standards and much of what IS0 9001:2015 requires was contained in our old standard. For example, we still had the old QS Business Plan requirement in our system. Well that blended perfectly with the context of the organization stuff. So we had almost no time required to develop new procedures and such. Our time was spent cleaning out old remnants that where no longer applicable. Everybody's journey will be different. Good luck.
 

howste

Thaumaturge
Super Moderator
#9
I estimated about 3 weeks. Not sure if its less or more.

Any suggestion,inputs are welcome...Thanks in advance.
I'm not sure either.

When I was doing QMS consulting I would ask to do a one to two day gap analysis first. The output of this would be a report that would identify the scope of everything that needed to be done at a high level. This would be used to determine how much time was necessary to implement the changes. I could then prepare a reasonable quote.

If a client insisted on getting a full quote before a gap analysis (which happened frequently) then I would give a quote including a gap analysis and then a not-to-exceed range of days to do the work. If I guessed well in the quote then I would get the work done somewhere in the range of days quoted. If I underestimated then I still got it done by the max days quoted, but the actual working days tended to be a little longer and I asked their process owners to do more... :notme:
 
Thread starter Similar threads Forum Replies Date
K Process Interaction Model in ISO 9001 Standard Document Control Systems, Procedures, Forms and Templates 6
D Process Interaction Examples for ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
M Process Interaction Map for ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 10
H Process Interaction Chart example as required by ISO 13485 2003 ISO 13485:2016 - Medical Device Quality Management Systems 11
K Turtle diagram or process interaction chart - Making it easier for an auditor Process Maps, Process Mapping and Turtle Diagrams 23
A Sequence and Interaction of the Processes - Please review my Process Map ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
K The Process Interaction Matrix from Quality Works Process Maps, Process Mapping and Turtle Diagrams 9
M Do I need a Procedure for Each Process? And the Interaction of Processes - TS16949 IATF 16949 - Automotive Quality Systems Standard 20
S Example of EMS Process Flow with interaction of core elements - Chemical industry Miscellaneous Environmental Standards and EMS Related Discussions 8
P Criticize my Company wide Process Interaction Mapping IATF 16949 - Automotive Quality Systems Standard 4
A Seeking: Process Interaction Example ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
C Process Interaction Chart - Graphical representation of top level business processes ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 19
L Documented Information in Internal Audits Process (9.2) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 0
A Sampling plan for in-process QC (medical devices) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
R MRB Process using MS Sharepoint or MS Teams Manufacturing and Related Processes 0
M Clinical Benefit of device that only aids in a process for managing or treating disease EU Medical Device Regulations 2
C In-process inspection - Tooling and assembly lines for automotive companies AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
M Efficacy of an IT process after a cyber attack ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
N Sterilization Protocol Change in Validation Process and further impacts ISO 13485:2016 - Medical Device Quality Management Systems 1
N Riveting - special process Manufacturing and Related Processes 11
M Material incoming to the production process reflected in PFMEA FMEA and Control Plans 5
A API Spec Q1 Purchasing Process - Supplier Reevaluation based on Supplier Risks 5.6.1.4 Oil and Gas Industry Standards and Regulations 12
B Handling lower detection limits for SPC and process performance Statistical Analysis Tools, Techniques and SPC 1
S Approval Process for Disinfectant Sanitizers in Dubai Elsmar Xenforo Forum Software Instructions and Help 0
D Measurables for Plastic Injection molding process Manufacturing and Related Processes 1
S Cleaning process center change ISO 13485:2016 - Medical Device Quality Management Systems 4
Z Rapid audit template for plastic parts manufacturing process Manufacturing and Related Processes 12
R Inspection and Work order process Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
T ISO 13485:2016 Clauses related to process matrix ISO 13485:2016 - Medical Device Quality Management Systems 3
A How to reduce the process SPC monitoring Capability, Accuracy and Stability - Processes, Machines, etc. 3
John Predmore Configuration Management as a process instead of a procedure AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R PCBA process validation Qualification and Validation (including 21 CFR Part 11) 2
U Internal Auditor not trained but done Audit for some process Nonconformance and Corrective Action 5
B Two excellent examples of process capability analysis from Quality Magazine Capability, Accuracy and Stability - Processes, Machines, etc. 5
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
S Sterilization validation after changing sterilization process provider Qualification and Validation (including 21 CFR Part 11) 3
Pau Calvo Quality Management process is mandatory in ISO9001? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Tagin Template or Checklist for Process Change Document Control Systems, Procedures, Forms and Templates 5
LostLouie Manufacturer divorced from Design process, is he justified in design process deficiencies? ISO 13485:2016 - Medical Device Quality Management Systems 9
J 1.11 Preliminary Identification of Special Product and Process Characteristics APQP and PPAP 4
D Question regarding customer feedback process ISO 13485:2016 - Medical Device Quality Management Systems 3
T What does AS9100 mean when it says you must establish a process to do X? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 24
J Process FMEA Template with examples - Cold and Hot Forged components FMEA and Control Plans 4
D Questions regarding process validation ISO 13485:2016 - Medical Device Quality Management Systems 6
D Question regarding ECO process, specifically for Life Science products and defining form fit and function ISO 13485:2016 - Medical Device Quality Management Systems 1
P Managing How PPAP Requirements are Communicated in the Manufacturing Process and to Suppliers APQP and PPAP 5
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
L Process changes and biocompatibility (ISO 10993-1) Other Medical Device Related Standards 1
A Validation of Forced Aeration Process ISO 13485:2016 - Medical Device Quality Management Systems 3
R Error Proofing Label process Manufacturing and Related Processes 4

Similar threads

Top Bottom