Process Verification And Aproval - Phase 4 of APQP

I

IGORTS

#1
Question:

Concerning the process verification, Is there any other way to verify the designed process than the PHASE 4 of APQP( QS-9000 or someone could verify the designed process with a process AUDIT?
In the first case, where we need to do a Process Audit according QS-9000.

Second, the designed process when is aproved? when the part is approved by the customer or any other way is avaible?

REGARDS
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration
Staff member
Admin
#2
Process verification is typically done prior to start of production. I guess you could use a process audit as part of verification, but typically verification is running the part and then checking to see if the part is being made correctly and to print. Typically an engineering function (such as a manufacturing engineer or team) does this as part of their responsibilities. You can only verify your process after it is designed and ready to run and you have to do it prior to start of production. I don't know when else you could do it.

Whether or not you need a customer approval depends upon your customer and their specific requirements. Typically you validate your process and the proof is in the PPAP package, but many customers do require a signoff.

I suggest you take a read through http://Elsmar.com/APQP/ for some general info.
 
I

IGORTS

#3
TANKS

Thank you vey much,

I have already got the APQP guide, and I think it´s clear and verifying the file I think I could start with the solution.

Thank you
 
Thread starter Similar threads Forum Replies Date
P Design verification driven by new equipment. How is this different than process validation? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 1
G Devices from IQ, OQ or PQ process to be used for verification, validation and summative? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 5
N Design Verification & Process Validation - Statistical sample sizes Design and Development of Products and Processes 2
R Supplier related drawings and verification of process requirements - Source Inspection AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
APHX02 Thread Roll Process Verification w/in AS9100 (i.e. BSP-F-69/AS8879) Manufacturing and Related Processes 2
S "Process Verification" of manual process Design and Development of Products and Processes 2
S Annex II List A IVDs - Batch Verification Process EU Medical Device Regulations 2
S SAE AS9015 Supplier Self Verification Process - Delegation Programs. AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
R Verification of Process Changes (AS9100 clause 7.5.1.2) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
V Sampling Plan for Final Inspection and Process Verification Inspection, Prints (Drawings), Testing, Sampling and Related Topics 21
G AS9100 Clause 7.5.1.1 Production Process Verification Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
J Production Process Verification - AS9100 Clause 7.5.1.1 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
D Verification Requirements in a Machining Process Qualification and Validation (including 21 CFR Part 11) 6
D Precision Balance Verification and Calibration Process General Measurement Device and Calibration Topics 3
M Sample Size in Design Verification & Process Validation Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
W Can Process Validation actually be Design Verification? Design and Development of Products and Processes 4
Z Incoming Verification process utilizing the supply base Supplier Quality Assurance and other Supplier Issues 1
Q Differences between Sample Sixes for Design Verification vs. Process Validation ISO 13485:2016 - Medical Device Quality Management Systems 2
D Difference between Process Verification vs. Process Validation in APQP? APQP and PPAP 4
A CPA (Corrective and Preventive Action) Verification and Validation Process Steps Nonconformance and Corrective Action 9
Q Verification / Validation methods - 8D (Eight Disciplines) process Nonconformance and Corrective Action 1
R Sampling Plan - The process involves verification of employment Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
D Design and Process - Validation vs. Verification - What is the difference? Design and Development of Products and Processes 20
John Predmore Configuration Management as a process instead of a procedure AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R PCBA process validation Qualification and Validation (including 21 CFR Part 11) 2
U Internal Auditor not trained but done Audit for some process Nonconformance and Corrective Action 5
B Two excellent examples of process capability analysis from Quality Magazine Capability, Accuracy and Stability - Processes, Machines, etc. 5
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
S Sterilization validation after changing sterilization process provider Qualification and Validation (including 21 CFR Part 11) 3
Pau Calvo Quality Management process is mandatory in ISO9001? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Tagin Template or Checklist for Process Change Document Control Systems, Procedures, Forms and Templates 5
LostLouie Manufacturer divorced from Design process, is he justified in design process deficiencies? ISO 13485:2016 - Medical Device Quality Management Systems 9
J 1.11 Preliminary Identification of Special Product and Process Characteristics APQP and PPAP 4
D Question regarding customer feedback process ISO 13485:2016 - Medical Device Quality Management Systems 3
T What does AS9100 mean when it says you must establish a process to do X? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 24
J Process FMEA Template with examples - Cold and Hot Forged components FMEA and Control Plans 4
D Questions regarding process validation ISO 13485:2016 - Medical Device Quality Management Systems 6
D Question regarding ECO process, specifically for Life Science products and defining form fit and function ISO 13485:2016 - Medical Device Quality Management Systems 1
P Managing How PPAP Requirements are Communicated in the Manufacturing Process and to Suppliers APQP and PPAP 5
I Control Plan (Product/Process specification/ Tolerance) acceptance FMEA and Control Plans 27
L Process changes and biocompatibility (ISO 10993-1) Other Medical Device Related Standards 1
A Validation of Forced Aeration Process ISO 13485:2016 - Medical Device Quality Management Systems 3
R Error Proofing Label process Manufacturing and Related Processes 4
B New Release of CQI-12 Coatings Process (Revision 3- Release date- 7/2020) Customer and Company Specific Requirements 2
D Layered Process Audits - FCA 9.2.2 - Exemption Clause? IATF 16949 - Automotive Quality Systems Standard 5
B ISO 11607-2 "Critical Parameter" vs. "Process Parameter" Other Medical Device Related Standards 6
Q Example Process orientation to the process leadership, management, goals (tasks of the top management) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
S Process Inspection -Sub assembly process inspection sheet Lean in Manufacturing and Service Industries 3
T ISO 13485 8.3 - Non-Conforming Materials - on-line rework or part of process? ISO 13485:2016 - Medical Device Quality Management Systems 11
T Outsourced process in ISO 45001 Occupational Health & Safety Management Standards 2

Similar threads

Top Bottom