Production Documents for Electrical/Electronic OEM

V

Vinayak Dixit

#1
Hello all.,

Can Any one provide the document list to be prepared for Production department for an Electrical/Electronic OEM.

Plz provide Me the details of the Documents If possible.As we are planning to set up a production facility as per ISO. Plz provide me the list.

Regards
VD
 
Elsmar Forum Sponsor

dsanabria

Quite Involved in Discussions
#2
Hello all.,

Can Any one provide the document list to be prepared for Production department for an Electrical/Electronic OEM.

Plz provide Me the details of the Documents If possible.As we are planning to set up a production facility as per ISO. Plz provide me the list.

Regards
VD
For clarification purposes, do you have the following?

Work Instructions, router or shop orders or travelers, preventive maintenance log book, log book for ESD, if so which documents are you looking for?

or

Are you looking for procedures, specifications, manuals or the requirements of the standard.

Let us know so we could provide opinios as to your next move
 
V

Vinayak Dixit

#3
Hello

Yes i have the work instruction but no the others like ESD procedures, specifications, manuals or the requirements of the standard.

Sp of you could guide me then it will be grt..

Vinayak
 

dsanabria

Quite Involved in Discussions
#4
Hello

Yes i have the work instruction but no the others like ESD procedures, specifications, manuals or the requirements of the standard.

Sp of you could guide me then it will be grt..

Vinayak
Do you have a copy of ISO 9001:2008 or the draft of ISO 9001:2015?

This will help you established the minimum requirements that your need in order to establish a shop that complies with the requirements of the standard.

Second point - have you looked at the "More Free Files" section (top of the page) - for already established documents, forms and other useful information?
 
V

Vinayak Dixit

#5
Thank you for the support

Yes i do have the ISO 9001:2008 but its not actually clearing my doubts on the document preparation means which are the documents... !! I am working on that to understand the specific things..

And i will check the free file section.

Now i am understanding how difficult is to set up a facility..

Thanq n plz do help me i u have any related documents for me.

Thank u
 

dsanabria

Quite Involved in Discussions
#6
Thank you for the support

Yes i do have the ISO 9001:2008 but its not actually clearing my doubts on the document preparation means which are the documents... !! I am working on that to understand the specific things..

And i will check the free file section.

Now i am understanding how difficult is to set up a facility..

Thanq n plz do help me i u have any related documents for me.

Thank u
Now that I have a better understanding this is what you are going to do

First Step is to define your processes and the interaction of processes.

Make a flowchart of your main processes beginning with contract review - purchasing - receiving - production / inspection steps / non conforming material - final inspection / non conforming material - shipping.

Add the clauses of the standard and include supporting roles (internal audits, management review etc.

Second step is to do a GAP Analysis (you can use the checklist on AS9101D) and omit the aerospace criteria. NOTE: If you don't have it - PM me.

A Gap analysis is like a in depth internal audit that you will follow and identify areas that needs procedures / work instructions... etc.

Third step - identify the "SHALL" on the ISO Standard and develop your own procedures.

Finally, asking for other about procedures is like copying their processes - not yours and eventually you begin to change processes in order to comply with someones processes instead of developing your own.
 
V

Vinayak Dixit

#7
Hi

Thank you for the reply. And i think i am on the right track.

I will follow your guidance.

Thank you.
 
Thread starter Similar threads Forum Replies Date
B Documents for production process IATF 16949 - Automotive Quality Systems Standard 8
R Managing Level 3 Production Documents - Document Control System Help Document Control Systems, Procedures, Forms and Templates 6
R Part Prints - Controlled and Uncontrolled Documents (e.g.: The Production Floor) Document Control Systems, Procedures, Forms and Templates 13
Z Date Stamp on Documents from Production - Medical Devices 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
F Who should Sign Supplier PPAP (Production Part Approval Process) documents? APQP and PPAP 13
B EO Production Batch Failure ISO 13485:2016 - Medical Device Quality Management Systems 1
B How to satisfy clause 5.7.1.5 process validation for valve production API 6D Oil and Gas Industry Standards and Regulations 13
Watchcat When to begin putting together postmarket production QMS for a mobile app? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 13
H Production Validation- CE Mark ISO 13485:2016 - Medical Device Quality Management Systems 3
S Wooden Pallets in Production Clean Room Food Safety - ISO 22000, HACCP (21 CFR 120) 5
A Production line for medical devices Other Medical Device Related Standards 1
O PPAP'ed part manufacturer has discontinued production Elsmar Cove Forum Suggestions, Complaints, Problems and Bug Reports 7
I Static Mixer on Solution production Mixer Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 0
A Traceability unequal lots/batches delivery production IATF 16949 - Automotive Quality Systems Standard 8
qualprod Setup time only at starting production? Lean in Manufacturing and Service Industries 5
J ISO 9001:2015 Clause 8.5.1 Control of Production and service provision - Help with Work Instruction Access ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 13
DuncanGibbons Pre FAI production terminology AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
C Validation of process for production and servicing 5.7.1.5 API Spec Q1, 9th Edition Oil and Gas Industry Standards and Regulations 9
O Production run inventory sell-by expiration date? APQP and PPAP 3
A ISO 9001 Internal Audits - No production right now due to furloughs Internal Auditing 5
DuncanGibbons Process flow & PFMEA for production planning and simulation activities? Process Maps, Process Mapping and Turtle Diagrams 7
D 6.1.2.3 Contingency Plan - Dispositions to restart production after an unplanned stoppage IATF 16949 - Automotive Quality Systems Standard 3
S Production Work Order Procedure 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
Techilady Ford Special Characteristics Communication and Agreement Form (SCCAF) provides production requirements? FMEA and Control Plans 4
thisby_ Post Market/Production Risk Assessment ISO 14971 - Medical Device Risk Management 0
Felony Melony Project Milestone Plan-Development to Mass Production APQP and PPAP 2
M Difference between "Production Trial Run" and "Run at Rate" IATF 16949 - Automotive Quality Systems Standard 8
M Material incoming to the production process reflected in PFMEA FMEA and Control Plans 9
C Scrapping on production floor - Setup parts 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
G Dealing with non conformity caused by Supplier Components detected in the production line IATF 16949 - Automotive Quality Systems Standard 14
T IATF Rules for sharing production space with another company IATF 16949 - Automotive Quality Systems Standard 10
qualprod Best practice to ensure inputting of data in production Lean in Manufacturing and Service Industries 19
R Monitor production quality - Internal KPIs Manufacturing and Related Processes 5
E Routine production tests - dielectric voltage withstand test IEC 60601 - Medical Electrical Equipment Safety Standards Series 4
P Conformity assessment based on a quality management system or production quality assurance EU Medical Device Regulations 3
Anonymous16-2 Dietary Supplement Raw Material/Component Storage and Production Manufacturing and Related Processes 1
L Significant Production Run - How 300 was determined to be the minimum quantity APQP and PPAP 2
Q ISO 9001 8.5.1 - Control of production and service performance ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
C Production and Post Production feedback - ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 4
DuncanGibbons How is the arrangement between Design and Production organisation envisaged? EASA and JAA Aviation Standards and Requirements 4
J Production Line Test Brasil - High Voltage Dielectric Strenght Test Other Medical Device Regulations World-Wide 5
J Iterative design and production for custom made products ISO 13485:2016 - Medical Device Quality Management Systems 3
M Production approval testing - Alternative ideas for Validation Reliability Analysis - Predictions, Testing and Standards 4
S How do you record your Nonconforming product? Batch production of staged processes Nonconformance and Corrective Action 2
A When there is a 2 year lapse in production, is a full FAI required? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
P Definition of production tooling in IATF16949 clause 8.5.1.6 IATF 16949 - Automotive Quality Systems Standard 4
Moncia Production Planning procedure ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
D Pre-Production Capability Assesment Reliability Analysis - Predictions, Testing and Standards 5
N Calibration Requirements for Production Equipment ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
A Production of raw materials in university labs? Lean in Manufacturing and Service Industries 11

Similar threads

Top Bottom