Project About Polycarbonate Carboy Production Quality Management System

E

eelitok

#1
I am currently focused on a project about a Quality Management System on PC Carboy production. I have handled most of my project. I want to ask you some questions, i hope you can help me.

  • What are your documentation techniques about your process? How do you prepare your record forms?
  • What are your management responsibilities about your process and quality management system? How does your manager reviews inputs coming from the results of audits, customer feedback? How does your manager reviews outputs which make you to improve your process, meet customer requirements? What quality techniques he/she uses in order to put these outputs to the system again?
  • How do you control your human resources? How you determine the resources in order to implent them in a continous way to your system? Have the employees being trained on the equipments they use? How do you measure the effectiveness of these trainings? Do you keep maintain records?
  • What is the quality of your process and what are the customer expectation from you? Which criterion determine your quality? What are your verification, validation, monitoring, inspection and test for product acceptance techniques? How do you measure the specification limits of your raw material? How do you determin these specification limits? Which criterion make you to understand the quality of your goods coming from your supplier?
  • How do you ensure you are meeting customer's requirements? How do you audit your process to ensure conformity on a regular basis? How do you control your non-conforming products, can they be salvaged? What are your corrective&preventive action quality techniques?
Thank you very much!
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration with a Mask on...
Staff member
Admin
#2
Recomendation: You will probably get the best replies by starting a new thread for each individual question. When a bunch of different questions are asked in one post it makes things very confusing.
 
Thread starter Similar threads Forum Replies Date
E Zero part to part variation - Gage R&R project Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 15
L Project Managers - Questions For You Career and Occupation Discussions 0
Felony Melony Project Milestone Plan-Development to Mass Production APQP and PPAP 2
R Project Transfer to New Factory ISO 13485:2016 - Medical Device Quality Management Systems 6
S Need guidance on project ISO 13485:2016 - Medical Device Quality Management Systems 2
Sidney Vianna IATF 16949 News Update on the IATF CARA Project (“Common Audit Report Application”) - 12/2020 IATF 16949 - Automotive Quality Systems Standard 1
R Electrical contractor Project Quality Management Plan Quality Manager and Management Related Issues 1
G Should I perform Gage R&R only at the beginning of a new project? Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 6
R What's the major difference between Green Belt and Black Belt in term of training and project Six Sigma 3
Q Project Tracker - Something that shows the status of each project Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 5
M IEC 62304 Class A Project IEC 62304 - Medical Device Software Life Cycle Processes 15
K A proposal for the model Quality Management - I need help for the project ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
S How to start with ISO process in project based team - Documentation Document Control Systems, Procedures, Forms and Templates 4
qualprod ISO 9001 vs PMBOK (project management) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
L Managing design projects: New Medical Device Project or Change Design and Development of Products and Processes 1
H FORD's project milestone acronyms Customer and Company Specific Requirements 4
R Extension of product nonconformances - Construction project Nonconformance and Corrective Action 7
M PDCA as a project tool Quality Tools, Improvement and Analysis 5
QIE Electronic IFU - new project, need input Other Medical Device and Orthopedic Related Topics 0
N Student trying to apply Lean Six Sigma on a Construction project in my thesis Lean in Manufacturing and Service Industries 3
B Will you please help me with my academic project? Repair & calibration service for test equipment ISO 17025 related Discussions 0
B [Help] Customer Engagement Survey for MBA Project - due Apr19 Manufacturing and Related Processes 0
B Help with Customer Engagement Survey for MBA Project - due Apr19 General Measurement Device and Calibration Topics 0
supadrai Aviation MRO Project facility coming to U-Tapao airport in Thailand - Help Career and Occupation Discussions 2
I GMP 21 CFR Part 11 Electronic Records Compliance Project Help Qualification and Validation (including 21 CFR Part 11) 9
S Project Management System - What do you currently use? Design and Development of Products and Processes 4
Sam Lazzara Notified Body CE Project Manager - Worst job ever? EU Medical Device Regulations 6
B How do you manage your project? Data Conversion and Digitization Records and Data - Quality, Legal and Other Evidence 9
K Implementing ISO13485:2016 in the Middle of a New Device Project ISO 13485:2016 - Medical Device Quality Management Systems 1
L Ways to improve testing on our department - Project Kickoff Misc. Quality Assurance and Business Systems Related Topics 4
A Free software similar to Microsoft Project - Any suggestion? APQP and PPAP 5
R University Research Project - Management Review Management Review Meetings and related Processes 17
E Best Ways to Close a Project APQP and PPAP 3
A How to rollout Security Awarness at Project Level in the Organisation IEC 27001 - Information Security Management Systems (ISMS) 1
G Where I could find any project HSE plan templates Occupational Health & Safety Management Standards 4
S ISO 9001:2015 Transition Project Plan example wanted ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
G Senior Project for BS Mechanical Engineering Student Career and Occupation Discussions 4
L KPI Project help - Business and Management Degree Benchmarking 4
N Non-conformances whilst in the Design and Development stage of a project ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
Richard Regalado Project Plan of New ISO 22301 BCMS Certified Company Business Continuity & Resiliency Planning (BCRP) 1
W Certification on AS9100C - FAI or PPAP? Project Management or APQP? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 11
A Application / Use of Hypothesis Testing in any Six Sigma Black Belt Project Six Sigma 8
A AS9100 Clause 7.1.1 Project Management - Process vs Project. AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
M Presentation Material for New Project Kick Off Meeting Manufacturing and Related Processes 2
V Pareto Analysis - Six Sigma - 'Productivity Improvement' project Service Industry Specific Topics 1
J Lean Transformation Project - Distribution centre in Europe Lean in Manufacturing and Service Industries 1
L Does every document on a project require a document number? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
M Conducting a Project for Safety Improvement Misc. Quality Assurance and Business Systems Related Topics 4
A Project Management Due Diligence Procedure example wanted Other ISO and International Standards and European Regulations 1
M Large Construction Project Quality Plan - ISO 9001-2008 using ISO 10006 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18

Similar threads

Top Bottom