SBS - The best value in QMS software

Providing confidence to lenders of Renewable Energy projects

Sidney Vianna

Post Responsibly
Staff member
Admin
#1
https://www.dnvgl.com/article/making-your-lender-more-comfortable-192366

To secure a loan to build your wind or solar plant, you need to make your lender both comfortable and confident in your proposition. They want to be as certain as possible that their investment will yield the expected return. The pathway to securing a loan is most often a bankable energy assessment prepared by a third-party consultant such as DNV GL. Not surprisingly, one of the most effective ways to assure your lender is to reduce uncertainty.
Many factors contribute to uncertainty in an energy assessment. However, one of the biggest contributors to resource measurement uncertainty that developers have control over is recovery rate of the sensors during the resource assessment campaign. Compared to other variables with the energy assessment that impact uncertainty, sensor recover rate is relatively easy to manage, but not often given attention until it’s too late.

Let’s consider a hypothetical resource assessment campaign. Imagine you’ve found a perfect location for your measurement device (remote sensing unit, solar monitoring station, or a meteorological tower). Your device has an optimized and redundant configuration, including the most accurate sensors on the market. After twelve full months of measurement, despite your intentional design, your recovery rate is only 50%. You’ve wasted half of your invested money and half of your invested time.
So how do you minimize your measurement uncertainty? Well, your equipment is exposed, faces the elements all day every day, and will undoubtably break at some point. When it does, you need to replace it quickly and carefully to avoid unnecessary increases in uncertainty due to changes in sensor manufacturer, model, or calibration facility. In order to upgrade effectively, you need to know the measurement device history, influences on uncertainty, trustworthy and reliable contractors, and how to coordinate cost, schedule, and access. The simple concept of taking measurements may suddenly feel like an overwhelming task, especially if you have a large portfolio of measurement devices and limited time.
Luckily, DNV GL has a team of experienced and dedicated project managers who solve these problems for both resource assessment and operating measurement campaigns on a regular basis. If you are having any issues with your measurement campaign, please reach out to DNV GL to get a quality and timely solution.
Great, now your measurement campaign equipment is well-managed! Nothing else to worry about, right? Well, not exactly. The question now becomes: how do you know if there is a problem with your measurement devices? In our experience, measurements are often unmonitored, and when it’s time for an energy assessment, we find out too late that a sensor has failed, a datalogger was fried, or a significant weather event. The best way to avoid these surprises is to regularly quality-check the data from your measurement devices to ensure they are functioning properly. This is simple and easy, but often neglected when other development tasks become priority. Additionally, as portfolios get larger, managing that much data and reviewing all those devices becomes very difficult and time-consuming.
Again, you might consider requesting support from a third-party expert like DNV GL. We have team of experienced data analysts who have quality-checked and cleaned thousands of tower years of data and continuously monitor hundreds of devices all over the world.
In the end, ensuring a high sensor recovery rate is straight forward and manageable way to reduce your project’s uncertainty. If you want to increase your odds of getting good terms from a lender, ensure they are as comfortable as possible with your measurement campaign by partnering with DNV GL!
 
Elsmar Forum Sponsor
Thread starter Similar threads Forum Replies Date
Sidney Vianna ISO/TS 17033:2019 Providing confidence in Ethical Claims Other ISO and International Standards and European Regulations 0
K Providing Confidence that Quality Requirements will be Fulfilled ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
Le Chiffre Online training available for ISO/IEC 17021-1: Requirements for bodies providing audit and certification of management systems Training - Internal, External, Online and Distance Learning 2
J Sister-company providing parts is only ISO 9001 registered IATF 16949 - Automotive Quality Systems Standard 7
J Extent of 2017/745: providing 3rd party mass produced devices to NHS patients EU Medical Device Regulations 0
M Informational US FDA Draft Guidance – Providing Regulatory Submissions for Medical Devices in Electronic Format – Submissions Under Section 745A(b) of the Federal F Medical Device and FDA Regulations and Standards News 0
S Providing IFU (Instructions for Use) in multiple languages EU Medical Device Regulations 0
M IATF 16949 - 8.5.6.1.1 Providing a list of process controls: Does this requirement add value to QMS? IATF 16949 - Automotive Quality Systems Standard 4
M Specifications Aerospace - Who is responsible for providing the correct specification(s) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 14
O ISO 9001:2015 4.4.1 - Providing Evidence of QMS Processes "Shalls" ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
A Does anyone have experience providing a summary of Pre-IDE discussions in the 510k US Food and Drug Administration (FDA) 1
M Providing accompanying Medical Device Accessories CE Marking (Conformité Européene) / CB Scheme 2
S What are the next steps after providing response to FDA 483 ? US Food and Drug Administration (FDA) 7
Ajit Basrur New Guidance - Providing Regulatory Submissions in Electronic Format US Food and Drug Administration (FDA) 1
R Help on providing Pesticide Details US Food and Drug Administration (FDA) 1
B Providing a potential Customer with a Sample Medical Device in Brazil Other Medical Device Regulations World-Wide 1
T Providing Instructions for Use (IFU) vs. 'Help' pages 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 3
A Example of Design (Clause 7.3) for Organizations providing Transport Service ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
bio_subbu FDA releases draft guidance on Providing Regulatory Submissions in Electronic Format Other US Medical Device Regulations 1
B Calibration Requirements in Organizations Providing Engineering Services General Measurement Device and Calibration Topics 5
M AS9100 Rev C - Determining, Providing and Maintaining" Infrastructure AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
S Providing Evidence of Compliance to MIL-I-45208A and ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
M Scope Clarification for company providing NDT service ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
O Simple process for providing Serial/Lot Numbering for our product Document Control Systems, Procedures, Forms and Templates 5
V ESD testers and providing calibration service - 7.6.3.2 External Laboratory IATF 16949 - Automotive Quality Systems Standard 3
M Delayed PPAP - Supplier has delayed providing PPAP for 2 years APQP and PPAP 25
R TS Certification Scope - Semiconductor subcontractor providing assembly and testing IATF 16949 - Automotive Quality Systems Standard 14
Steve Prevette Business Model for Providing Statistical Services Service Industry Specific Topics 5
M Where is (waldo) the customer? Providing consultancy for a "Marketing Company" ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
T Providing A2LA w/ Proficiency Test results General Measurement Device and Calibration Topics 5
B Providing Auditee with Checklist prior to Audit General Auditing Discussions 48
a_bardi FMEA and service providing - FMEA examples in fixed network carriers sector or CATV FMEA and Control Plans 2
T Reliability & Maintainability - No customers providing input into the R&M area Reliability Analysis - Predictions, Testing and Standards 3
H Graphical analysis of results - Confidence level bands nomenclature Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 2
S Need help wrapping my head around confidence vs beta error Statistical Analysis Tools, Techniques and SPC 2
S Significance of regression, correlation coefficient, hypothesesi, confidence interval Using Minitab Software 8
L ISO 2859-2 LQL sampling plan linked to %confidence/%reliability Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
H Sample Size Calculation (Confidence Interval and Reliability) - Medical Devices Reliability Analysis - Predictions, Testing and Standards 6
F Supplier Audits - Creative ways to gain confidence in the next Supplier Training - Internal, External, Online and Distance Learning 6
M 1 and 2-Sample Poisson Rate - Confidence Level - Minitab/Excel Statistical Analysis Tools, Techniques and SPC 5
R Control Chart Constants and Confidence Interval Statistical Analysis Tools, Techniques and SPC 7
U Sample size to prove parts are good with 99.73% confidence Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
S Determining sample size for inspection to achieve x% confidence re defects Misc. Quality Assurance and Business Systems Related Topics 10
R Are ISO 9001 certificates delivering confidence in line with the expected outcomes? Registrars and Notified Bodies 2
R Formula to tie together - Confidence/Reliability Level AQL? LTPD? Reliability Analysis - Predictions, Testing and Standards 3
M Defining Reliability and Confidence Levels Reliability Analysis - Predictions, Testing and Standards 3
H 87% Confidence Level for the Product Quality Control for Various Products Inspection, Prints (Drawings), Testing, Sampling and Related Topics 8
P One sided confidence interval for probability plot in Minitab Using Minitab Software 1
G Calculating the Fraction Defective Confidence Interval for a Lot Statistical Analysis Tools, Techniques and SPC 2
M Sampling Level for Defective Units with a confidence level of ~95% Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9

Similar threads

Top Bottom