I have Chrysler Submissions to do. I was told I need to complete PSO requirments. Someone told me I had to also do PPAP requirments. Is PSO (21 elements) done in leau of PPAP (18 elements) or in addition to?:bonk::confused:
 
Elsmar Forum Sponsor

Jim Wynne

Staff member
Admin
#2
Re: PSO & PPAP Which one?

I have Chrysler Submissions to do. I was told I need to complete PSO requirments. Someone told me I had to also do PPAP requirments. Is PSO (21 elements) done in leau of PPAP (18 elements) or in addition to?:bonk::confused:
PSO is separate from, and precedes, PPAP submission. From Chrysler's CSR document (supplementing ISO/TS 16949 requirements):
A systematic and sequential review of the organization’s process shall be completed through a Process Sign-Off (PSO) performed by the Product Team. The purpose is to verify the organization’s process readiness and to assure understanding of complete program requirements, prior to a PPAP submittal.
A Chrysler-led Process Sign-Off shall be performed for parts that have a high or medium initial risk evaluation as identified by the Product Team. Low risk parts shall have an organization-led PSO to establish production readiness. Parts that have been out of production for 12 months or more, shall have an organization led PSO unless otherwise determined by the Product Team. PSO should be completed prior to providing S2 level parts to Chrysler. The PSO shall be completed prior to S2 Start Readiness. PSO shall be completely approved prior to a PPAP submission.
(my emphasis)

The entire document may be downloaded from the IATF website.
 
A

angelom

#4
Re: PSO & PPAP Which one?

Thanks everyone , Looks like I have more work to do, but looks like alot of whats in PPAP is in PSO already.
 
H

Hopesmommy

#7
Hi - I was actually trying to start a new thread, but figured I could ask the question here as it relates to Chrysler PPAP.

I was the PPAP cordinator a few years ago for the GM platform. Soon I will be transferring back into PPAP, but this time on the Chrysler end of things.

Wondering how different PPAP is (or maybe isn't?) when comparing Chrysler to GM requirements. I've been out of PPAP a few years, so I'll need to reacquaint myself with it anyway.....but my only knowledge is on the GM side.

Thanks!
 
Thread starter Similar threads Forum Replies Date
B No Supplier PPAP or PSO (process approval) Requirement APQP and PPAP 3
M A PSO is Chrysler - Is PSOMAS a typo? APQP and PPAP 8
Q DaimlerChrysler PSO Manual - Is April 2005 the most current? IATF 16949 - Automotive Quality Systems Standard 2
J Material Handling Plan as Described in v5.5 of the PSO Document - Please critique Customer and Company Specific Requirements 3
S DCX PSO Part Handling Plan Example Customer and Company Specific Requirements 6
Q Newest Chrysler DCX PSO Edition? Information about the changes? Customer and Company Specific Requirements 1
M Has anyone made a DCX PSO plant book? Customer and Company Specific Requirements 1
R DCX PSO book 5th Edition - Does anyone have a typical index or check list? APQP and PPAP 6
M DaimlerChrysler Gage Standard - Where to find PSO 5th edition requirements Customer and Company Specific Requirements 2
E Looking for Chrysler FPSC form per procedure PSSP0106 - From Chrysler 2001 PSO manual Customer and Company Specific Requirements 2
H Chrysler announced PSO 5th Edition - Process Sign-off Manual as of Jan. 2005 Customer and Company Specific Requirements 9
A DCX (Daimler - Chrysler) - PSO (Process Sign-Off) and PAP (Product Planning) Info IATF 16949 - Automotive Quality Systems Standard 9
J Daimler Chrysler?s PSO (Process sign-off) - Language requirement Customer and Company Specific Requirements 1
H Process Sign Off Handbook - 4th edition of the DaimlerChrysler PSO handbook Customer and Company Specific Requirements 4
D What does a level 1 (PSW) PPAP actually promise? APQP and PPAP 10
R PPAP Requirements for Tool Repair or Refurbishment APQP and PPAP 5
abrego44 AIAG PPAP manual for service part APQP and PPAP 2
A PPAP question for audit APQP and PPAP 16
G PPAP for Chemical Products APQP and PPAP 4
T Re-PPAP after updating CMM program? Manufacturing and Related Processes 9
J Supplier not responding to PPAP request APQP and PPAP 5
J Part submission warrant for Level 1 PPAP APQP and PPAP 1
K Should APQP/PPAP has its own section in a QM? Quality Management System (QMS) Manuals 1
B Toyota PPAP Process - Three Questions APQP and PPAP 5
G Supplier delivered recent PPAP, should he deliver yearly layout inspection? IATF 16949 - Automotive Quality Systems Standard 4
F How to submit a PPAP when a subcontractor is the sole manufacturer IATF 16949 - Automotive Quality Systems Standard 2
P PPAP samples retention time IATF 16949 - Automotive Quality Systems Standard 5
K Updated MSA with the Annual PPAP validations APQP and PPAP 8
P Managing How PPAP Requirements are Communicated in the Manufacturing Process and to Suppliers APQP and PPAP 5
E Annual PPAP+ deviation request ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
K OEM specific requirements - PPAP was rejected by STA Customer and Company Specific Requirements 5
T PPAP for distributors? APQP and PPAP 1
A PPAP for Fire extinguisher APQP and PPAP 2
S PPAP Progress - Visual Status Board APQP and PPAP 0
C AS9145 Appendix D PPAP Approval Form APQP and PPAP 2
Pau Calvo PPAP customer requirements in the APQP APQP and PPAP 25
V 3 PQ lots mentioned as requirement in PPAP. Is this necessary? APQP and PPAP 2
B What is the role of Quality Engineer in APQP and PPAP APQP and PPAP 3
F How to submit PPAP without IMDS APQP and PPAP 10
GreatNate Excel PPAP Tracking templates or tool wanted APQP and PPAP 1
M Where can I find examples of PPAP? APQP and PPAP 6
R Process Specification - What is the name of this PPAP form? APQP and PPAP 15
I PPAP Assembly and Components Manufacturing and Related Processes 3
F PPAP Documentation Control APQP and PPAP 8
K PPAP Phases Vs PPAP Levels APQP and PPAP 2
R Plan to Volvo Cars for capacity verification in Phase 3 of PPAP Customer and Company Specific Requirements 3
G Job interview - So I have to do a presentation on PPAP APQP and PPAP 16
J AIAG PPAP: 2.2.11.3 Acceptance Criteria for Initial Study (page 9, 4th edition) APQP and PPAP 1
M Level 3 PPAP submission of intentional defective parts APQP and PPAP 4
L Reasons to submit a new PPAP or notify the customer APQP and PPAP 3

Similar threads

Top Bottom