Purchasing Controls - Prerequisites for Batch Release or even before Purchase Order

v9991

Trusted Information Resource
#1
following requirement translates to "evaluation of supplier" - specification - quality agreement - and 'type&controls"

my query is for following points.

a. how to interpret following .
...ensure that all purchased or otherwise received product and services conform to specified requirements...
option 1:- all the above mentioned relates are pre-requisites for purchase requisition.
option 2 :- all the above points to be in place before batch-initiation and batch-release.


Subpart E--Purchasing Controls
Sec. 820.50 Purchasing controls.

Each manufacturer shall establish and maintain procedures to ensure that all purchased or otherwise received product and services conform to specified requirements.
(a) Evaluation of suppliers, contractors, and consultants. Each manufacturer shall establish and maintain the requirements, including quality requirements, that must be met by suppliers, contractors, and consultants. Each manufacturer shall:
(1) Evaluate and select potential suppliers, contractors, and consultants on the basis of their ability to meet specified requirements, including quality requirements. The evaluation shall be documented.
(2) Define the type and extent of control to be exercised over the product, services, suppliers, contractors, and consultants, based on the evaluation results.
(3) Establish and maintain records of acceptable suppliers, contractors, and consultants.
(b) Purchasing data. Each manufacturer shall establish and maintain data that clearly describe or reference the specified requirements, including quality requirements, for purchased or otherwise received product and services. Purchasing documents shall include, where possible, an agreement that the suppliers, contractors, and consultants agree to notify the manufacturer of changes in the product or service so that manufacturers may determine whether the changes may affect the quality of a finished device. Purchasing data shall be approved in accordance with 820.40.
 
Elsmar Forum Sponsor

QA-Man

Involved In Discussions
#2
Re: Purchasing Controls - Prerequisites for Batch Release or even before Purchase Ord

I think it all means make sure what you received is what you wanted (more or less). It could be incoming inspection against documented specifications or it could be looking at a certificate of analysis.

I wouldn't focus on differentiating "purchased" or "otherwise received". I have seen raw materials and product received from another division within the same company that was treated like a purchase from an outside company.
 

v9991

Trusted Information Resource
#3
Re: Purchasing Controls - Prerequisites for Batch Release or even before Purchase Ord

I think it all means make sure what you received is what you wanted (more or less). It could be incoming inspection against documented specifications or it could be looking at a certificate of analysis.

I wouldn't focus on differentiating "purchased" or "otherwise received". I have seen raw materials and product received from another division within the same company that was treated like a purchase from an outside company.
I agree.
However the question and options I tried to inquire is whether 'pre-requisites' of audit-Quality/Technical agreement etc to be established before validation batches; OR they have to be done before placing purchasing order.
 

Sarah Stec

Involved In Discussions
#4
Re: Purchasing Controls - Prerequisites for Batch Release or even before Purchase Ord

a. how to interpret following .
Personally, I interpret it to mean that regardless if you bought the item or it was given to you, you need to apply purchasing controls. In other words, the item should conform when you receive it, not afterwards.

IME, the quality/technical agreement usually comes before the purchasing order, not once the manufacturer has already received the product. :2cents: I can imagine various situations in which the supplier wouldn't agree to guarantee a specific quality/technical specification for material the supplier no longer has. :bigwave:
 
Thread starter Similar threads Forum Replies Date
D Do purchasing controls apply to non-medical parts? ISO 13485:2016 - Medical Device Quality Management Systems 5
K "Purchasing Controls" for Stand-alone Software US Food and Drug Administration (FDA) 2
E ISO 9001-2008 Purchasing controls ? Issuing POs Without Specific Approvals Quality Manager and Management Related Issues 8
M Supplier Audit Form for Purchasing Controls ISO 13485:2016 - Medical Device Quality Management Systems 2
M Distributor and 21 CFR Part 820.50 Purchasing Controls 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 8
S 21CFR820-820.50 Purchasing controls - Using Non-Approved Suppliers 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 10
M QSR Purchasing Controls governing evaluation and use of consultants ISO 13485:2016 - Medical Device Quality Management Systems 1
L Purchasing procedure and workload ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
W Non-Conformance from recent Audit carried out on Purchasing AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 11
Q Purchasing requirements for Toll Manufacturers Manufacturing and Related Processes 1
R Do Brands Matter When Purchasing Bore Gauge? General Measurement Device and Calibration Topics 2
J COC (Certificate of Conformity) when NOT purchasing medical devices direct from the Manufacturer Other Medical Device Related Standards 2
R ISO 13485 purchasing QMS and ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 8
A Purchasing - Internal Audit Questions Internal Auditing 8
M Case study - If the restaurant (ISO 9001:2015 certified) was run by 2 persons covering cooking and purchasing processes (Mother and Father) supported ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
D Use of non-ISO 9001 Supplier - Purchasing through a distributor IATF 16949 - Automotive Quality Systems Standard 7
M AS9100d Controlling External Provided Processes (purchasing 8.4) - The customer want us to use supplier X AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
S Purchasing for Design and Development Organization ISO 13485:2016 - Medical Device Quality Management Systems 3
Q AS 9100 C and D Purchasing requirements difference AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 2
Q Risks and opportunities that could be associated with the purchasing department ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
R DFARS Compliance - Purchasing Aluminum Alloy 7075 -T73511 per AMS-QQ-A-200/11 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 4
N ISO 17025 Clause 4.6 Purchasing Services & Supplies (Compliance) ISO 17025 related Discussions 3
L ANVISA RDC 16 - purchasing records Other Medical Device Regulations World-Wide 2
H Cause analysis for an Audit Finding - Purchasing Procedure Content ISO 13485:2016 - Medical Device Quality Management Systems 9
D Can we exclude purchasing and supplier evaluation - ISO9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 11
S Difference between 7.4.1 & 7.4.3 - Purchasing Requirements ISO 13485:2016 - Medical Device Quality Management Systems 6
S AS9100 7.4 "Purchasing of a Service" - Stress and Design Analysis AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 7
A Question on Purchasing clause 7.4.1 of ISO 9001 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
A 7.4 Purchasing Question - My company only provides services ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
W ISO 9001 Clause 7.4.2 Purchasing Information for Retail Products ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
L AS9100 - 7.4.2d Purchasing - Specification revision for raw material needed? AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 3
P Purchasing Process Out of Control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
H Methods to Ensure that we are Purchasing what we've Designed Benchmarking 16
T Purchasing SPC Software for Automotive Company Statistical Analysis Tools, Techniques and SPC 9
P Supplier Scorecard for ISO 9001 - Help me review the draft from my purchasing team ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
V Satisfying AS9100 7.4.2 Purchasing Requirements AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 10
quality1 Exclusion to Purchasing - AS9100 Clauses 7.4.1 & 7.4.2 AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 5
S Do I have to audit 7.4 Purchasing ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
D AS9100 Tooling Purchasing Process Manufacturing and Related Processes 5
T Purchasing a Digital Multimeter Calibration and Metrology Software and Hardware 3
B Bill of Material Content to meet Purchasing Requirements Manufacturing and Related Processes 2
W ISO 9001:2008 Purchasing Requirements ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
T ISO 9001 Clause 7.4.1 Purchasing Process (Supplier Approval) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
A Purchasing Performance KPI (Key Performance Indicators) Benchmarking 4
K Purchasing a Portable CMM to Measure a 14' Cylinder that's 5' Tall Calibration and Metrology Software and Hardware 3
C Purchasing Department Internal Audit HELP! Internal Auditing 12
T Employee not following Purchasing Process Other Medical Device Related Standards 27
Q AS9100 Clause 7.4.1 Purchasing Process and Approved Supplier List Records AS9100, IAQG 9100, Nadcap and related Aerospace Standards and Requirements 37
A Purchasing Verification & Supplier Selection ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
R ISO 9001:1987 or 1994 - Wording of Purchasing in section 6.0 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 17
Similar threads


















































Top Bottom