It doesn't make a lot of sense to me that TUV should require you to use a moist heat standard to validate an EtO process. I think I would appeal the finding. Just to be sure, are we talking about using the hollow load test from ISO 17665-2 and somehow adopting to EtO sterilization? I am not sure if it is even feasible to do this test with EtO.