A
Hi there again,
I have two queries which I will greatly appreciate your kind replies and inputs.
1) Scope of Work is defined in the Quality Manual as stated herein;
"Construction of Mechanical & Infrasturcture Projects, Roads and Buildings as per customer requirements, concrete plant and asphalt plant."
2) Part of the Quality Manual states that;
"If the scope of work of a project includes design, the company will outsource such design works to external design consultancy firms. Control is ensured thru design review and verification procedures No. QMP-DE-010."
Also, part of the Quality Manual for Design and Development states that;
"The ESP (organization) shall carry out the design and development activities in the operations where requried by the customer, although there are required in some projects and excluded in the most. The client often..."
My question is this:
GOD BLESS YOU ALL.
I have two queries which I will greatly appreciate your kind replies and inputs.
1) Scope of Work is defined in the Quality Manual as stated herein;
"Construction of Mechanical & Infrasturcture Projects, Roads and Buildings as per customer requirements, concrete plant and asphalt plant."
- Does this imply that the clause 7.3 of ISO 9001:2008 is applicable? or to be excluded?
2) Part of the Quality Manual states that;
"If the scope of work of a project includes design, the company will outsource such design works to external design consultancy firms. Control is ensured thru design review and verification procedures No. QMP-DE-010."
Also, part of the Quality Manual for Design and Development states that;
"The ESP (organization) shall carry out the design and development activities in the operations where requried by the customer, although there are required in some projects and excluded in the most. The client often..."
My question is this:
- Does these two statements found in the QUality Manual simply and directly says that the clause 7.3 of ISO 9001:2008 is NOT TO BE EXCLUDED?
- If YES, then it is only rightful for the AUDITOR to audit the DESIGN process?
GOD BLESS YOU ALL.