Re: Inspection dept: Key Performance Indicator(KPI)
For Receiving Inspection you could simply do Accepted Lots vs. Rejected Lots, (or even a PPM Calculation). As for Calibration, ideally you need all Calibrations completed on time. But, you could monitor Cals done on Time vs. Cals Late. I would express them both of these suggestions in a % and monitor the trends over time to see what the data tells you.