Dear all,

As the new building is almost finished and the re-location of our production is the next step, we were advised by our ISO9001 EN9100 auditor to make up a Quality plan.
This way the chance of forgetting important steps will be limited.
Has anyone done this before?
Advise more than welcome.:thanx:

Kind regards,
Els Janssens
 
Last edited by a moderator:
Elsmar Forum Sponsor

harry

Super Moderator
#2
Re: Quality plan for relocation

A process FMEA is another way to go.

Identify all the steps in this moving exercise and for each, brainstorm what could go wrong with each step and come up with suggestions to overcome (prevent) it.

Also discuss with your customers. If they need uninterrupted supplies, you may need to consider phasing out the moving process.

It is also time to go back to your records for 'lessons learned' - they served as inputs for preventing any repeat of poor layouts, infrastructure or other problems.
 
E

elsjanssens

#3
Re: Quality plan for relocation

Unfortunately doing a FMEA for the complete production will take more time then I can spend.
But I agree this would be the best way to go!
 

Stijloor

Staff member
Super Moderator
#4
Re: Quality plan for relocation

Dear all,

As the new building is almost finished and the re-location of our production is the next step, we were advised by our ISO9001 EN9100 auditor to make up a Quality plan.
This way the chance of forgetting important steps will be limited.
Has anyone done this before?
Advise more than welcome.:thanx:

Kind regards,
Els Janssens
Goedemiddag Els,

Moving a production operation is a project that has to be completed correctly and on time. Every project is unique in some manner, but has also elements in common with other projects. Project management comes to mind and there are quite a bit of tools available. Your auditor mentioned a quality plan, but any description of activities and necessary controls will be fine. I would not get too hung up on "Quality Plan."

Others may chime in with additional suggestions.

Stijloor.
 

qusys

Trusted Information Resource
#5
Re: Quality plan for relocation

Goedemiddag Els,

Moving a production operation is a project that has to be completed correctly and on time. Every project is unique in some manner, but has also elements in common with other projects. Project management comes to mind and there are quite a bit of tools available. Your auditor mentioned a quality plan, but any description of activities and necessary controls will be fine. I would not get too hung up on "Quality Plan."

Others may chime in with additional suggestions.

Stijloor.
Agree.
Probably the quality plan was also referred to the validation of the new production environment after the move out from the previous one.
In this case 6.3 and 6.4 of ISO 9001 should have been considered and re-assessed in the light of the relocation.
We do not have additional details about the type of production, if the production environment has to meet particular standard requirement or not.
So, just in case Els wants to give more news, we could give other interpretation.
However, the classical approach of project management is useful, in fact the organization can monitor the "quality" of the move out day by day. I am confident that the organization has tought about this in whatever shape, probably a structured approach based upon known methodology could be helpful so far for this huge change.:bigwave:
 

Statistical Steven

Statistician
Staff member
Super Moderator
#6
Dear all,

As the new building is almost finished and the re-location of our production is the next step, we were advised by our ISO9001 EN9100 auditor to make up a Quality plan.
This way the chance of forgetting important steps will be limited.
Has anyone done this before?
Advise more than welcome.:thanx:

Kind regards,
Els Janssens
The approach I use is to identify the Critical to Quality (CTQ), Critical Process Parameters (CPP), process output requirements and any validated processes I use. For each category you need to determine how to "prove" equivalence between the performance pre-move to post move. Are there any processes that will need to be re-validated? Do you have any environmental parameters that need to be monitored? Basically you go through the process and find areas where a failure to execute during the move can have impact on quality.
 

jkuil

Quite Involved in Discussions
#7
I have been involved in the transfer of the production site of a medical device production site from the Netherlands to Mexico. The transfer was handled via the change management process. It actually required multiple change request with scheduled implementation activities and appropiate validation and verification plans. The robust change management system faciltated the track and tracing of all required activities to effective completion.
 

Bev D

Heretical Statistician
Staff member
Super Moderator
#8
I like to use a hybrid of elements of what the medical/pharma industries use in their validation of special processes and what automotive/aerospace would look for:

Installation: A checklist that all equipment is installed correctly, proper electrical hookups, water, hydraulics, etc. does it turn on correctly? heat up correctly? etc. this ensures that the equipment wasn't catastrophically damaged in teh move and was installed correctly.

First article: at least one part is measured completely for each dimension, property or function and compared to past performance or specificaitons to ensure that the process didn't get catastrophically out of whack.

Process capability / Process Qualification: I would produce 3 sequential lots that have all CTQs measured or tested and analyzed for equivelent performance to specifications and past performance. I typically do a simple run chart of each characteristic for several lots just prior to the move and teh 3 lots just subsequent to the move. no fancy stats needed (unless your Customer requires it) just look at the charts - is the after performance equivelent in average adn variation to the before performance?
 
Thread starter Similar threads Forum Replies Date
D Quality plan for moving locations ISO 13485:2016 - Medical Device Quality Management Systems 3
R Electrical contractor Project Quality Management Plan Quality Manager and Management Related Issues 1
qualprod Annual SWOT for 4.1? I plan to revise quality objectives and strategic route ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
H Need help on Quality Improvement Plan (QIP) Quality Tools, Improvement and Analysis 5
L Quality Manual for a Quality Plan (Manufacturing secrets?) Request Misc. Quality Assurance and Business Systems Related Topics 1
S Quality Plan at a small Medical Device Company - Is the quality plan a DMR document ISO 13485:2016 - Medical Device Quality Management Systems 6
D API 5CT Compliant Quality Plan for Manufacturing Manufacturing and Related Processes 0
Q What is a Quality Charter and how does it differ from a Quality Plan? Quality Manager and Management Related Issues 4
shimonv 21 CFR 820.20(d) says: Each manufacturer shall establish a Quality Plan 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
L Quality Plan to decommission a Medical Device Facility Decommissioning and Transfer Quality Manager and Management Related Issues 1
S Quality Assurance Plan template for CNC Milling Industry AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M Does a process map satisfy 21 CFR 820.20(d) (Quality Plan)? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 4
P Need suggestion on Software or App for Tracking Quality Plan Status Software Quality Assurance 1
A Quality Plan - Inspection method, equipment list for inspection of a Spur Gear Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
K NPI (New Product Introduction) Quality Plan Outsourced Manufacturer/Supplier APQP and PPAP 3
L Difference between a Quality Plan and Inspection & Test Plan (ITP) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
P What should a Quality Plan Include and Examples Misc. Quality Assurance and Business Systems Related Topics 3
M Large Construction Project Quality Plan - ISO 9001-2008 using ISO 10006 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 18
G QMS Quality Plan Documents Software Document Control Systems, Procedures, Forms and Templates 4
M Business Plan vs Quality Plan in the TS16949 standard Benchmarking 5
I Contingency Plan that meets requirements of API Q1 Quality Management System Other ISO and International Standards and European Regulations 3
A Quality Plan for Plastic Industry for ISO 9001:2008 ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Requirements of a TS 16949 Quality Plan IATF 16949 - Automotive Quality Systems Standard 2
R Quality Plan for Cookies and Crackers - Baking Industry ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
B Quality Plan Template for producing a New Medical Device ISO 13485:2016 - Medical Device Quality Management Systems 8
5 MDD Quality Plan Templated Wanted Document Control Systems, Procedures, Forms and Templates 2
L Electrical Cable Harness Quality Control - Sampling Plan for Pull Test Manufacturing and Related Processes 4
Z Quality Assurance Plan for Engineering Service Industry Quality Manager and Management Related Issues 1
V Improvement Plan for existing QUALITY TEAM Quality Manager and Management Related Issues 6
Q PQP (Project Quality Plan) and QCP (Quality Control Plan) Differences ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
S Quality Plan Revisions and Numbering ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 14
I Quality Assurance Business Plan & Strategy Quality Tools, Improvement and Analysis 3
C Quality Management Plan example wanted AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R Quality Manual and Quality Plan for Customer Experience ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 1
B QCP (Quality Control Plan) from client with EN 10204 type 3.1 Material Certificates Various Other Specifications, Standards, and related Requirements 2
M What is a Quality Assurance Plan? Help with Content for a Sea Port QA Plan Misc. Quality Assurance and Business Systems Related Topics 8
somashekar Can Documents of External Origin be a Quality Plan? ISO 13485:2016 - Medical Device Quality Management Systems 2
K I need a Quality Plan template Document Control Systems, Procedures, Forms and Templates 3
I Business Plan for Setting Up a Quality Department Quality Manager and Management Related Issues 4
Q Vendor (Supplier) Quality Plan vs. Our QMS? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 12
Y Improvement Projects and Quality Plan (Examples and Advice needed) ISO 13485:2016 - Medical Device Quality Management Systems 6
V Quality Plan (Inspection, Recording and Corrective Actions) Records and Data - Quality, Legal and Other Evidence 2
P EASA 145 (145.A.30) Man Hour Plan for Quality Monitoring EASA and JAA Aviation Standards and Requirements 2
K ISO 9001 Compliant Project Quality Plan Requirements Misc. Quality Assurance and Business Systems Related Topics 4
A Supplier Quality Plan for Service Providers - Assistance and advice wanted Supplier Quality Assurance and other Supplier Issues 2
R ISO 17025 sufficient enough to drop ISO 10005 Quality Plan? ISO 17025 related Discussions 1
V Quality Plan for Development & Manufacturing ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
V Implementation Plan for ICH Q10 - Gap analysis of cGMP vs ICH Q10 Quality Systems US Food and Drug Administration (FDA) 2
R Quality Plan Requirements - Per Part or per Assembly Quality Manager and Management Related Issues 15
S Quality Auditing System - Audit Plan per guidance from ISO 19011 Internal Auditing 8

Similar threads

Top Bottom