Question about AQL - Why did the customer reject our products???

buffalo_hua

Starting to get Involved
#1
Dear All,

I have a question about the AQL, recently our customer rejected more than 10,000 of our products due to one minor problem occured in its plant, I wonder that according to the principle of AQL, as long as the out-going report for our products is OK and the customer also has not checked the defect after our products have been transferred to its plant, the products can be accepted by the customer, then why did they reject our products, does not this disobey the principle of AQL?

Hope someone can answer my question.

Thanks a lot in advance!!

---Buffalo_Hua :confused:
 
Elsmar Forum Sponsor

Wes Bucey

Prophet of Profit
#2
buffalo_hua said:
Dear All,

I have a question about the AQL, recently our customer rejected more than 10,000 of our products due to one minor problem occured in its plant, I wonder that according to the principle of AQL, as long as the out-going report for our products is OK and the customer also has not checked the defect after our products have been transferred to its plant, the products can be accepted by the customer, then why did they reject our products, does not this disobey the principle of AQL?

Hope someone can answer my question.

Thanks a lot in advance!!

---Buffalo_Hua :confused:
If I were the Quality Manager of EITHER customer or supplier, I would want a detailed report of WHAT the nonconformance was and whether it was process-related or damaged after processing, in handling or shipping. I would also want to know how the nonconformance affected the customer's operation (is the customer absolutely unwilling to use ANY of the product for fear a bad one might get installed and create a life, health, safety problem?)

Some customers have a "zero tolerance" policy - the supplier should have known that from the Contract Review. If the contract does NOT provide a zero tolerance, the return MIGHT be negotiated.

As part of the return, is the customer also asking for repair or replacement? Alternately, is the customer returning product and canceling order? If the customer wants to cancel the order, there may be a deeper problem than mere quality issues. We need more information.

Bottom line:
Without detailed information on the product, the nonconformance, and the real effect on customer's operation, we can't offer much more than sympathy.
 

Govind

Super Moderator
Leader
Super Moderator
#3
I agree with Wes feedback. You have to read the contract more thoroughly. I do not think your customer could reject 10,000 products due to a “minor” problem.

a.Your organization and your Customer may not be clear on the operational definition of “Minor” “Major” and “Critical” before entering into the agreement.
b.AQL May be tighter than you think. Assuming 10,000 as 1 lot, for a Level II, code L, Sample size is 200, until AQL 0.1, the acceptance # is “0”. Your description of minor problem does not match with this degree of AQL selection.
c.If the above 10, 000 were made of few lots, after rejecting the first few lots, customers would have rejected the entire consignment to save inspection time.
d.If you maintained a good traceability of lots for investigation and “homogeneity” of lots, you have a better chance of containing the situation.

As suggested by Wes, more details are required. Take a look at the business contract or Procurement Specification or Service level Agreement whatever the language being used. Some organizations maintain Quality agreement and Business contract separately, some blend them together. Anyways, check both.

Regards,
Govind.
 
M

M Greenaway

#4
I would think that your customer simply wants to return the burden of screening the batch for defects back to yourself - which sounds fair to me.

AQL is often linked to acceptance sampling plans, have you used an agreed sampling plan in this instance ? If so take a look at the OC curve, and understand the 'producers risk' and 'customers risk' when it comes to sampling.
 
Q

QA Lady

#5
Quality Planning

Up front Quality planning at the beginning of a job/project typically
will uncover your customer requirements. I make it very clear to my
suppliers that our company uses the " Zero Acceptance Number "
C = 0, Sampling plan. With that known, one defect (minor or not) rejects
the entire lot.

Hope that helps........
 
M

M Greenaway

#6
QA Lady

Do you use a 'proper' zero acceptance sampling plan, or simply knock the numbers down to zero in a standard sampling plan ?
 
Q

QA Lady

#7
Sample Plan

It is an established sample plan :

Zero Acceptance Number
C = O

Author : Nicholas L. Squeglia

It is widely accepted throughout the industry, even in the
military world due to the fact it is recognized by ISO and more
comprehensive than MIL-STD-105.

Good luck !
 
Thread starter Similar threads Forum Replies Date
S Question regarding AQL - ISO 3951 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 0
N The question asks about sampling plans and AQL Reliability Analysis - Predictions, Testing and Standards 5
B AQL Sampling Tables Question Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
L AQL (Acceptable Quality Level) Question Quality Manager and Management Related Issues 7
T AQL question on Changing Lot Sizes AQL - Acceptable Quality Level 1
S Determining the Total Sample Size using AQL - AQL Lot Quantity question AQL - Acceptable Quality Level 8
J New Vendor (Supplier) Certification & AQL Question AQL - Acceptable Quality Level 1
Z AS9102B Form 1, line 19 question. Is a printed name and signature both required or is only a signature sufficient? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
K Question on registration of class 1 medical device in Turkey Other Medical Device Regulations World-Wide 0
L General FMEA Question FMEA and Control Plans 2
D What do you think of Chat GPTs answer to this Risk Acceptability question? ISO 14971 - Medical Device Risk Management 5
M ISO 13485 Supplier Question ISO 13485:2016 - Medical Device Quality Management Systems 13
A Question regarding new VDA_AIAG fmea approach for process FMEA FMEA and Control Plans 0
Ed Panek FDA Submission Question US Medical Device Regulations 2
M Cleanroom Question Manufacturing and Related Processes 10
T Aircraft GAPP Software Testing Compliance Question AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
sonflowerinwales Quick question M3 screw plug gauge AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 0
B FDA regulations medical device prescription fulfillment DME question US Medical Device Regulations 0
M An interesting question about import company Other Medical Device Regulations World-Wide 5
Sam.F Question about training Training - Internal, External, Online and Distance Learning 20
B Labeling question about different manufacturers on a single label Manufacturing and Related Processes 4
J Question regarding classification of custom made device EU Medical Device Regulations 5
Sam.F Question about granite surface plates out of spec AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 9
Ed Panek MDR question - Meaning of Stability CE Marking (Conformité Européene) / CB Scheme 6
B GD&T Question, True Position Confusion Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2
D Initial Importer question Other US Medical Device Regulations 1
Ed Panek Calibration question Manufacturing and Related Processes 4
M Class Exempt Medical Device Recall Question US Food and Drug Administration (FDA) 3
sonflowerinwales Metric or Imperial; that is the question... After Work and Weekend Discussion Topics 6
M Can someone help me with this CMM programming question? Manufacturing and Related Processes 2
A A strange question about predicate device selected in 510(k) submission Medical Device and FDA Regulations and Standards News 8
D Document Control Question involving DocuSign US Food and Drug Administration (FDA) 6
JoeRandom11 Question about Customer Supplied Equipment AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
M ISO 13485: 2016 Lot numbering question ISO 13485:2016 - Medical Device Quality Management Systems 4
S Nadcap - Heat Treatment Proof of Verification question for Digital results AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 5
JoeRandom11 Question of Calibration Cycles AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
D Software Validation Question ISO 13485:2016 - Medical Device Quality Management Systems 10
B 8.5.1.1 Control Plan - question audit NC IATF 16949 - Automotive Quality Systems Standard 5
C Document Identification Question ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
D Question regarding PCR workstation Fume Hood upon first use ISO 13485:2016 - Medical Device Quality Management Systems 0
Moncia ISO 9001 calibration question please ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
Quality Specialist Quick question on the sequence of ISO 17025 external audits ISO 17025 related Discussions 14
D ISO 13485--Question regarding performing calibrations in house. ISO 13485:2016 - Medical Device Quality Management Systems 13
S Document numbering question? ISO 13485:2016 - Medical Device Quality Management Systems 7
J Has the facility been inspected? question in Certificate to Foreign Government application Other US Medical Device Regulations 0
M ESTAR 510(k) submission question Medical Device and FDA Regulations and Standards News 0
J Question on clause 5.2.2 IEC 62304 - Medical Device Software Life Cycle Processes 2
Ed Panek ISO 15223 Question EU Medical Device Regulations 2
R Question: Cg/Cgk formula Capability, Accuracy and Stability - Processes, Machines, etc. 2
J Quick question on responsible person's experience requirements UK Medical Device Regulations 3

Similar threads

Top Bottom