A documented procedure shall be established to define the controls needed a) to approve documents for adequacy prior to issue,
Above is one of the first requirement in control of documents as in ISO9001.
A drawing for a 60mm custom 'O' ring was issued to development and being an electronic industry, a little less attention was paid for rubber parts. The person to approve was not available and it was agreed to go ahead with development (tooling included) as it was a simple and a small part.
The first article was promptly inspected and accepted by the inspection based on the drawing copy had, and was communicated. When the time came for the assembly of the new product, the assembly supervisor promptly stopped the final assembly, put the 'O' ring around his neck and shouted ..

for the reason that it was a 60cm 'O' ring which he was issued.
Big loss of time, money, face-off, blame game, followed.

..... Had the drawing been approved for adequacy prior to issue >>>>