Received a Major finding during IATF Surveillance audit for loss of BIQS Level 3 (more than 6 SPPS in 6 months)...how should we address SYSTEMIC CA?

#1
Received a Major finding during IATF Surveillance audit for loss of BIQS Level 3 (more than 6 SPPS in 6 months)...how should we address SYSTEMIC CA?
 
Elsmar Forum Sponsor

Sebastian

Trusted Information Resource
#2
There should be definitelly FAQ how to properly start this kind o thread.
1. What IATF 16949 clause number or CSR was pointed out by auditor as source of requirement?
2. Observation made by auditor, as evidence of nonconformity.
I can guess, but I don't want to.
 
#4
“GM CSR June 1st, 2019 requires that a major nonconformity shall be raised if organization’s BIQS is at level 1 or level 2.”
We exceeded the maximum allowance of 6 complaints (SPPS) IN A 6 month period...this dropped us from level 3 to level 1. The issues were all product defects related.
 
#5
There should be definitelly FAQ how to properly start this kind o thread.
1. What IATF 16949 clause number or CSR was pointed out by auditor as source of requirement?
2. Observation made by auditor, as evidence of nonconformity.
I can guess, but I don't want to.
SEE EXPLANATION BELOW...
 

Howard Atkins

Forum Administrator
Leader
Admin
#7
The major NC is mandatory and not to the discretion of the auditor.
In fact one must notify the CB within 5 days of the loss of the BIQS or there will be another for non notification
GM -IATF 16949 - Customer Specific Requirements
BIQS Requirements
Organizations shall achieve and maintain BIQS Level of 3, 4 or 5. The organization whose BIQS Level
falls below Level 3 shall notify its Certification Body within 5 business days after falling below the
stated requirement. If the organization fails to notify their Certification Body, the Certification Body
shall issue a minor non-conformance against IATF 16949:2016, clause 9.1.2.1.

The Certification Body shall issue a major non-conformance against IATF 16949:2016, clause 9.1.2.1,
when they are notified (or discover) the organization is at a BIQS Level 1 or 2. The Certification Body
shall conduct an on-site special audit.
Organizations that have not had their initial IATF 16949 certification and are BIQS Level 1 or 2 shall
not be issued a non-conformance.

To close this major non-conformance during the on-site special audit, the organization shall have
either 1) achieved BIQS metrics of Level 3, 4 or 5; or 2) a documented action plan, confirmed by the
GM SQE or SQE designee, detailing the steps, improvements, with target dates, being made to
achieve BIQS Level 3, 4 or 5.

NOTE: The GM system Sourceability Report will indicate a BIQS Level of 1 or 2 for those
organizations not meeting the BIQS requirements.
I would expect to see an analysis of the PRRs if there is a common thread etc.
 

Sebastian

Trusted Information Resource
#8
Howard pointed out 9.1.2.1, so I am sure your auditor did the same.
Using last sentence of this section consider following aspects:
1. Assignation of authority for monitoring customer scorecards
2. Competence of personnel monitoring customer scorecards including escalation process
3. Trigger initiating management review when results are poor and management review scope (9.3.1.1, 9.3.2.1 i)
4. Management involvement in preparation of action plan against poor results (9.3.3.1)
 
#9
The major NC is mandatory and not to the discretion of the auditor.
In fact one must notify the CB within 5 days of the loss of the BIQS or there will be another for non notification


I would expect to see an analysis of the PRRs if there is a common thread etc.
Thank you Howard...there were 3 repeat issues that were found the same week by the same GM Plant Side SQE.
 
Thread starter Similar threads Forum Replies Date
C Determining an as received OOT condition during calibration does not affect measurements taken prior to calibration. General Measurement Device and Calibration Topics 16
L 3rd party audit issues - No audit agenda received a week before the audit Registrars and Notified Bodies 7
B How many nonconformances have you received on average during IATF audits? General Auditing Discussions 27
V Quality review Meeting with Customer for complaints we received Customer Complaints 6
Ed Panek Corona Virus impact on Supplier Audits and Received Parts ISO 13485:2016 - Medical Device Quality Management Systems 4
M Informational TGA – Submissions received: Regulation of software, including Software as a Medical Device (SaMD) Medical Device and FDA Regulations and Standards News 1
CPhelan Nonconformance opened as incorrect expiration date placed on received product. Escalate to CAPA? Nonconformance and Corrective Action 4
M We still have not received our certificate due to a 'backlog' with our auditing body Registrars and Notified Bodies 25
P Received a minor for not having good measureables/goals. Need help with KPIs. IATF 16949 - Automotive Quality Systems Standard 52
K Internal Audit CAR - How Long for Responses to be Received? Internal Auditing 8
W AS9100 (8.5.1 j) - Missing Parts when received back from External Provider AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
L Supplier Revision Confirmation of Received Engineering Documents ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Help with SCAR - Not all sub-assemblies had properly received a First Article Nonconformance and Corrective Action 2
Y Part 21-G organization - Compliance documents of received product Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
V Pre-dispensed API material received in predetermined quantities & given to production Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 1
K APQP requirement when a new print or spec is received from a customer - Existing Part APQP and PPAP 3
Q Recommendation for a suitable PA on a complaint received Preventive Action and Continuous Improvement 3
marmotte 510(k) "received date" discrepancy Other US Medical Device Regulations 1
R Is IMDS required for Shipping cap received from our suppliers RoHS, REACH, ELV, IMDS and Restricted Substances 7
M Should we analyse risk at the quotation phase or after the order is received? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
Q Receiving Inspection - Quantity Received different from Pack List & C of C AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
M Corrective Action - Customer Received Mislabeled Parts Nonconformance and Corrective Action 6
D We received our AS9100 Rev C. certificate! Thank you! AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Hershal This morning I received notification that I have my third copyright Coffee Break and Water Cooler Discussions 11
J Internal Audit Reports - Is it acceptable if received after due date? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
C Received 510K Market Approval - Use in Advertising US Food and Drug Administration (FDA) 5
M "As Found" (aka "As Received") Calibration Data - ISO 13485 Requirements ISO 13485:2016 - Medical Device Quality Management Systems 8
C Contaminated Sharp Medical Devices received by mail - Biohazard? Other Medical Device and Orthopedic Related Topics 2
K Ts-16949 certification received! IATF 16949 - Automotive Quality Systems Standard 8
Ajit Basrur Laboratory Monthly Report template needed (samples received, samples tested, etc.) General Measurement Device and Calibration Topics 2
R On/OFF switch received from supplier - No CE marking but with Certificate CE Marking (Conformité Européene) / CB Scheme 1
Stijloor Consultants, have you received calls from Registrars lately? Registrars and Notified Bodies 9
J Received TS 16949 Certification Today! IATF 16949 - Automotive Quality Systems Standard 19
E Supplier PPAP - Section 7.3.6.3. - Our company received a minor - Help IATF 16949 - Automotive Quality Systems Standard 7
C Notice Received from Customer Regarding PPAP's & FAIR's APQP and PPAP 8
C (DDR) Delivery Discrepancy Report received from customer for late delivery Nonconformance and Corrective Action 3
R UL Requirements - Received a variation notice - Safety caution text Various Other Specifications, Standards, and related Requirements 3
P I Received an AQL questionnaire from a customer - Comments? AQL - Acceptable Quality Level 3
L ISO 9001-2000 Registered - We received our ISO 9001:2000 certificate yesterday ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 30
S Purchasing Procedure - Purchasing process is not complete until product is received? IATF 16949 - Automotive Quality Systems Standard 11
L Registrar Quotes - Quality of Responses Received - Discussion Registrars and Notified Bodies 29
R Has anyone received the ASQ publication of the DIS for ISO9001:2000? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
D Is it possible to control Customer Drawings (Prints) by a "Received" Date Stamp? QS-9000 - American Automotive Manufacturers Standard 16
Sidney Vianna Tesla Lacks Major Automotive Quality Certifications such as IATF 16949 and ISO 9001 IATF 16949 - Automotive Quality Systems Standard 15
C IATF 16949:2016 Major NC pertaining to 7.1.5.2.1 Calibration/verification records IATF 16949 - Automotive Quality Systems Standard 15
J Minor / Major findings with MDR EU Medical Device Regulations 4
S ISO9001 Major for repeat issue. ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 24
D Major NC from last audit not fixed not sure how to fix General Auditing Discussions 10
U How to pick between ANSI Z1.4 vs. ISO2859-1 for AQL Inspection? What are the major differences? AQL - Acceptable Quality Level 4
A Define timeline for Major and Miner Audit finding General Auditing Discussions 4

Similar threads