Received a minor for not having good measureables/goals. Need help with KPIs.

P

Phantasm

"Top Management shall ensure that quality objectives to meet customer requirements are defined, established and maintained for relevant functions, processes and levels throughout the Organization. "

So I recieved a minor on this clause. I need to get some measureables & goals together for out processes. So far, I have:

Training - Goal of 2 employees crosstrained in other areas outside of their day to day duties per year.

Manufacturing - Goal of Cost of poor quality not to exceed $3,000 per year.

Quality Planning/Safety - Goal of 0 safety incidents per year.

Quoting - Goal of 0 RFQ's not being processed within 3 days of recieving them.

Process Design - Goal of $3,000 in savings from process design improvements per year.

Shipping - Goal of 100% on time delivery (not sure if this is even atainiable)

Outsource Process - Goal of 0 supplier defects per year.


Now, Im stuck on the following:

Corrective & Preventitive action
Doc & Record control
Internal Auditing
Management review
Receiving
Purchasing
Maintenance
Calibration

Any ideas of what I could track for those? We are a small (less than 50 employees) prototype shop that does 3 & 5 axis laser, machining, and welding.
 

Sebastian

Trusted Information Resource
This section (6.2.2.1) is related to Customer Orientated Processes of organization, where customer requirements are external issues which shall be considered. Not all organizational processes are COP, so please share more details related to this nc.
 

Ron Rompen

Trusted Information Resource
See my comments (in blue) below

"Top Management shall ensure that quality objectives to meet customer requirements are defined, established and maintained for relevant functions, processes and levels throughout the Organization. "

So I recieved a minor on this clause. I need to get some measureables & goals together for out processes. So far, I have:

Training - Goal of 2 employees crosstrained in other areas outside of their day to day duties per year.

Manufacturing - Goal of Cost of poor quality not to exceed $3,000 per year.

Quality Planning/Safety - Goal of 0 safety incidents per year.

Quoting - Goal of 0 RFQ's not being processed within 3 days of recieving them.

Process Design - Goal of $3,000 in savings from process design improvements per year.

Shipping - Goal of 100% on time delivery (not sure if this is even atainiable)

Outsource Process - Goal of 0 supplier defects per year.


Now, Im stuck on the following:

Corrective & Preventitive action - Number of CAR/PAR completed and closed within xx days (goal is all)
Doc & Record control
Internal Auditing Number of internal audits completed
(goal is all) This also feeds back to Corr & Prev actions

Management review
Receiving
Purchasing
Maintenance Number of incomplete PM per month (goal is 0)
CalibrationNumber of overdue calibrations per month (goal is 0)

Any ideas of what I could track for those? We are a small (less than 50 employees) prototype shop that does 3 & 5 axis laser, machining, and welding.
 

Golfman25

Trusted Information Resource
What was the minor? What does "good" mean?

As I work thru your list, with your sized company its overkill. Why so many? What value are you adding?

Have you even identified cross training as a need? What happens when everyone is cross trained?
Your shipping to 100% on time could be modified to include that your "late" shipments caused no disruptions at the customer. Many times we find we are hitting a computer schedule rather than an actual need schedule. It's a big waste.
 

northbranch

Starting to get Involved
To add to Ron's list --- my answers are in green

Corrective & Preventitive action - Number of CAR/PAR completed and closed within xx days (goal is all)
Doc & Record control - 0 audit findings due to document and record control
Internal Auditing Number of internal audits completed
(goal is all) This also feeds back to Corr & Prev actions

Management review - 1. management review held as scheduled - goal 100%; 2. Mgt Rev attendance is >85%. (Not an effective meeting if attendance is low)
Receiving
Purchasing
Maintenance Number of incomplete PM per month (goal is 0)
CalibrationNumber of overdue calibrations per month (goal is 0)
 

Ninja

Looking for Reality
Trusted Information Resource
And the last two...

Receiving: Do not set a goal here. If materials are not received, it will ding on OTD and you'll catch it there...there's no point setting a goal here.

Purchasing: # of production delays attributed to slow or incorrect purchasing. (goal 0)
Separate out slow purchasing and late internal requests for purchase in any RCA that reaches here. Vendor lead time is vendor lead time...not purchasing.

Also, set a reasonable purchasing turn-time...1day, 3days, etc...and it's only their fault if they exceed this time AND delay production.

:2cents:
 

AndyN

Moved On
"Top Management shall ensure that quality objectives to meet customer requirements are defined, established and maintained for relevant functions, processes and levels throughout the Organization. "

So I recieved a minor on this clause. I need to get some measureables & goals together for out processes. So far, I have:

Training - Goal of 2 employees crosstrained in other areas outside of their day to day duties per year.

Manufacturing - Goal of Cost of poor quality not to exceed $3,000 per year.

Quality Planning/Safety - Goal of 0 safety incidents per year.

Quoting - Goal of 0 RFQ's not being processed within 3 days of recieving them.

Process Design - Goal of $3,000 in savings from process design improvements per year.

Shipping - Goal of 100% on time delivery (not sure if this is even atainiable)

Outsource Process - Goal of 0 supplier defects per year.


Now, Im stuck on the following:

Corrective & Preventitive action
Doc & Record control
Internal Auditing
Management review
Receiving
Purchasing
Maintenance
Calibration

Any ideas of what I could track for those? We are a small (less than 50 employees) prototype shop that does 3 & 5 axis laser, machining, and welding.

Hi neighbor!

What was the actual wording of the minor? I'm with Golfman on this! It sounds like a subjective nc to me...
 

Mr.Ruiz

Starting to get Involved
"Top Management shall ensure that quality objectives to meet customer requirements are defined, established and maintained for relevant functions, processes and levels throughout the Organization. "

So I recieved a minor on this clause. I need to get some measureables & goals together for out processes. So far, I have:

Training - Goal of 2 employees crosstrained in other areas outside of their day to day duties per year.

Manufacturing - Goal of Cost of poor quality not to exceed $3,000 per year.

Quality Planning/Safety - Goal of 0 safety incidents per year.

Quoting - Goal of 0 RFQ's not being processed within 3 days of recieving them.

Process Design - Goal of $3,000 in savings from process design improvements per year.

Shipping - Goal of 100% on time delivery (not sure if this is even atainiable)

Outsource Process - Goal of 0 supplier defects per year.

Now, Im stuck on the following:

Corrective & Preventitive action
Doc & Record control
Internal Auditing
Management review
Receiving
Purchasing
Maintenance
Calibration

Any ideas of what I could track for those? We are a small (less than 50 employees) prototype shop that does 3 & 5 axis laser, machining, and welding.

Hello,

I think, you or the Lead auditor are confusing a couple of clauses, if your company established all of those 15 processes as part of your QMS, you should have a way to measure the effectiveness of them (and in some cases the efficiency), but, that is a requirement per sub-clause 5.1.1.2 Process effectiveness and efficiency, the one you are quoting is 6.2.2.1 quality objectives and planning to achieve them -supplemental, part of the 6.2 clause, and as Sebastian already said, 6.2.2.1 is for COPs referred.

I believe if you share the proper statement of the NC Finding, would lead us to give you better support.
 

AndyN

Moved On
Putting objectives to all these things is NOT what the standard requires. Frankly, putting objectives to things like management review, document control and other is a waste of time. I'd go back and look at the business and what those objectives are. Wasting time on measurable for records, documents, internal audits etc is not going to garner support from management.
 
Thread starter Similar threads Forum Replies Date
E Supplier PPAP - Section 7.3.6.3. - Our company received a minor - Help IATF 16949 - Automotive Quality Systems Standard 7
C Determining an as received OOT condition during calibration does not affect measurements taken prior to calibration. General Measurement Device and Calibration Topics 16
L 3rd party audit issues - No audit agenda received a week before the audit Registrars and Notified Bodies 7
B How many nonconformances have you received on average during IATF audits? General Auditing Discussions 27
V Quality review Meeting with Customer for complaints we received Customer Complaints 6
Ed Panek Corona Virus impact on Supplier Audits and Received Parts ISO 13485:2016 - Medical Device Quality Management Systems 4
E Received a Major finding during IATF Surveillance audit for loss of BIQS Level 3 (more than 6 SPPS in 6 months)...how should we address SYSTEMIC CA? IATF 16949 - Automotive Quality Systems Standard 11
M Informational TGA – Submissions received: Regulation of software, including Software as a Medical Device (SaMD) Medical Device and FDA Regulations and Standards News 1
CPhelan Nonconformance opened as incorrect expiration date placed on received product. Escalate to CAPA? Nonconformance and Corrective Action 4
M We still have not received our certificate due to a 'backlog' with our auditing body Registrars and Notified Bodies 25
K Internal Audit CAR - How Long for Responses to be Received? Internal Auditing 8
W AS9100 (8.5.1 j) - Missing Parts when received back from External Provider AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
L Supplier Revision Confirmation of Received Engineering Documents ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
M Help with SCAR - Not all sub-assemblies had properly received a First Article Nonconformance and Corrective Action 2
Y Part 21-G organization - Compliance documents of received product Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1
V Pre-dispensed API material received in predetermined quantities & given to production Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 1
K APQP requirement when a new print or spec is received from a customer - Existing Part APQP and PPAP 3
Q Recommendation for a suitable PA on a complaint received Preventive Action and Continuous Improvement 3
marmotte 510(k) "received date" discrepancy Other US Medical Device Regulations 1
R Is IMDS required for Shipping cap received from our suppliers RoHS, REACH, ELV, IMDS and Restricted Substances 7
M Should we analyse risk at the quotation phase or after the order is received? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
Q Receiving Inspection - Quantity Received different from Pack List & C of C AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
M Corrective Action - Customer Received Mislabeled Parts Nonconformance and Corrective Action 6
D We received our AS9100 Rev C. certificate! Thank you! AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
Hershal This morning I received notification that I have my third copyright Coffee Break and Water Cooler Discussions 11
J Internal Audit Reports - Is it acceptable if received after due date? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
C Received 510K Market Approval - Use in Advertising US Food and Drug Administration (FDA) 5
M "As Found" (aka "As Received") Calibration Data - ISO 13485 Requirements ISO 13485:2016 - Medical Device Quality Management Systems 8
C Contaminated Sharp Medical Devices received by mail - Biohazard? Other Medical Device and Orthopedic Related Topics 2
K Ts-16949 certification received! IATF 16949 - Automotive Quality Systems Standard 8
Ajit Basrur Laboratory Monthly Report template needed (samples received, samples tested, etc.) General Measurement Device and Calibration Topics 2
R On/OFF switch received from supplier - No CE marking but with Certificate CE Marking (Conformité Européene) / CB Scheme 1
Stijloor Consultants, have you received calls from Registrars lately? Registrars and Notified Bodies 9
J Received TS 16949 Certification Today! IATF 16949 - Automotive Quality Systems Standard 19
C Notice Received from Customer Regarding PPAP's & FAIR's APQP and PPAP 8
C (DDR) Delivery Discrepancy Report received from customer for late delivery Nonconformance and Corrective Action 3
R UL Requirements - Received a variation notice - Safety caution text Various Other Specifications, Standards, and related Requirements 3
P I Received an AQL questionnaire from a customer - Comments? AQL - Acceptable Quality Level 3
L ISO 9001-2000 Registered - We received our ISO 9001:2000 certificate yesterday ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 30
S Purchasing Procedure - Purchasing process is not complete until product is received? IATF 16949 - Automotive Quality Systems Standard 11
L Registrar Quotes - Quality of Responses Received - Discussion Registrars and Notified Bodies 29
R Has anyone received the ASQ publication of the DIS for ISO9001:2000? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
D Is it possible to control Customer Drawings (Prints) by a "Received" Date Stamp? QS-9000 - American Automotive Manufacturers Standard 16
T Minor Change vs. New Revision AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 4
A PFMEA - Minor Non-Conformance for field left blank IATF 16949 - Automotive Quality Systems Standard 56
J Minor / Major findings with MDR EU Medical Device Regulations 4
W Minor NC - IATF Rules 5th Edition Sanctioned Interpretations against 4.2 IATF 16949 - Automotive Quality Systems Standard 7
M IEC 62304 Software changes - Minor labeling changes on the GUI IEC 62304 - Medical Device Software Life Cycle Processes 3
M Major vs. Minor for Internal Audits? Internal Auditing 10
C Fact or fiction - Repeat minor becomes a major IATF non-conformance IATF 16949 - Automotive Quality Systems Standard 7

Similar threads

Top Bottom