We are a small machine shop, AS9100 certified.
Attached is our current document used for incoming inspection (which I think is lacking to begin with). This week my supervisor tells me he wants to start batching part numbers on a single form to save time/money, so when a P.O. comes back from outside processing instead of filling out 1 form per part number, now we are to batch them all together per P.O.
Is this going to fly on our next audit? Just referencing the vendor COFC doesn't seem specific enough, ohh and if a part is non-conforming they want to just reference the NCR #....
I read the standard again last night and I'm failing to find anything directly linked to this...
Attached is our current document used for incoming inspection (which I think is lacking to begin with). This week my supervisor tells me he wants to start batching part numbers on a single form to save time/money, so when a P.O. comes back from outside processing instead of filling out 1 form per part number, now we are to batch them all together per P.O.
Is this going to fly on our next audit? Just referencing the vendor COFC doesn't seem specific enough, ohh and if a part is non-conforming they want to just reference the NCR #....
I read the standard again last night and I'm failing to find anything directly linked to this...
Attachments
-
176.6 KB Views: 204
-