Receiving Inspection - Quantity Received different from Pack List & C of C

Q

QAManager101

#1
I?ve looked in the supply chain management handbook and haven?t found material that covers this topic?????????

Looking for some advice or guidance to specific documents that can help clarify the following??

When receiving standards or material that has an accompanying C of C with a specific lot# & quantity listed but, the actual amount of parts is over the amount stated on the pack list and the C of C.

Example: We order 150 bolts NAS XXXX-XX , we receive pack list that says 150 and a C of C that states 150 from lot# XXXX-X, but when counted we have a quantity of 153.

What is the industry standard for acceptance?

Should we contact the vendor and have them adjust the quantity on the C of C?

Should we adjust the C of C ourselves noting Date/ time /stamp/ initials on the C of C?

Just accept the parts and paper work, disregarding the quantities?

My belief is that if we want the extra parts the C of C and pack list should reflect the actual amount of parts we are accepting into our inventory, so we should contact the vendor to adjust the amounts on the paperwork.

If we are not keeping the parts because of the time involved ?vs- the cost of the parts, we should dispose of them in the same manner as non-conforming parts.
 
Elsmar Forum Sponsor
S

ssz102

#2
i don't know what product are produced in your company, and your customer or law/ regular in your company had required to provided this statement by yourself?

C of C meas certificate of complaince what i was learned
 
#3
I?ve looked in the supply chain management handbook and haven?t found material that covers this topic?????????

Looking for some advice or guidance to specific documents that can help clarify the following??

When receiving standards or material that has an accompanying C of C with a specific lot# & quantity listed but, the actual amount of parts is over the amount stated on the pack list and the C of C.

Example: We order 150 bolts NAS XXXX-XX , we receive pack list that says 150 and a C of C that states 150 from lot# XXXX-X, but when counted we have a quantity of 153.

What is the industry standard for acceptance?

Should we contact the vendor and have them adjust the quantity on the C of C?

Should we adjust the C of C ourselves noting Date/ time /stamp/ initials on the C of C?

Just accept the parts and paper work, disregarding the quantities?

My belief is that if we want the extra parts the C of C and pack list should reflect the actual amount of parts we are accepting into our inventory, so we should contact the vendor to adjust the amounts on the paperwork.

If we are not keeping the parts because of the time involved ?vs- the cost of the parts, we should dispose of them in the same manner as non-conforming parts.
The said lot number might have much more parts out of which a certain number has come to you. The 150 being 153 perhaps a counting error.
So why not Just accept the parts and paper work, disregarding the quantities? What is the risk you see in this ?
We get PCB mount plunger switch in packs of 1000's of various plunger lengths, the quantity never being 1000. Either 10s, 20s less and seldom more.
 

harry

Trusted Information Resource
#4
I?ve looked in the supply chain management handbook and haven?t found material that covers this topic????????? .....................................
Welcome to the Cove.

I guess you are in the aerospace sector and I moved your post to that forum so as to receive relevant attention.
 
A

amit_rd

#5
I appreciate the fact that you are so particular about this point. - A difference in stated and actual quantities is always a concern. It may be more today but it may be less in future so very valid point.

About the action - First action point is to specify in your specific requirements that suppliers need to adhere to the packaging quantities strictly and the delivery should not be less/higher than the delivery schedule.

Control point: You may start addressing all such issues in delivery PPM and make it a part of supplier performance review.
 
S

silentrunning

#6
At our company the incoming inspector notes on the CofC and packing list the actual received quantity and then initials it. If it is a piece of hardware costing a penny or two we just ignore it and let it go because the cost of correction would far outweigh the value of the parts. Since most bulk parts are weighed, not counted, this happens often. When parts are serialized for aerospace usage you can't do this.
 
Q

QAManager101

#7
Thank you all for the initial input.
My company is aerospace based. Lot traceability of certain materials is vital in the manufacturering process.
My main concern is directly related to C of C's that have lot numbers serial #'s associated with them, if lot#'s and serial #'s are not part of the C of C then it?s a non-issue in my book.
At one time I worked in Aerospace welding where every piece of certified welding rod had to be accounted for and traced on the Work Order.
I just don?t see how you could justify or validate to a customer how you produced 54 units from a specific lot# but only had material certs or C of C's for enough material or details to make 50. In addition tion the inventory headaches that those kind of practices could create.
 
D

Darrell B

#8
Nuts and bolts are often weighed, and not counted by hand. As long as you note the overage on your receiver, you should be fine. If you don't want to bother with the 2 or 3 extra, just dispose of them. Rivets are usually bought by the pound. Do you count them before putting them in stock?
 
F

Fuzzix

#9
It is frustrating that there is not a standard for this. Thank you for this question and forum for making that easier to determine. I've run across this problem and hit some of the same stumbling blocks. My problem is compounded by documentation within a database. I look forward to a standard being developed. :)
 
Thread starter Similar threads Forum Replies Date
W Proper gage to use for receiving inspection General Measurement Device and Calibration Topics 9
R AS9100 - 8.4.2 - Receiving Inspection Requirements AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
Skooma Receiving Inspection - Boss trying to save money AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 7
I Receiving Inspection Requirement in IATF IATF 16949 - Automotive Quality Systems Standard 3
D Incoming (Receiving) Inspection - General form for incoming part inspection Document Control Systems, Procedures, Forms and Templates 17
V Receiving Inspection AQL - Am I allowed to just pick a AQL? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10
J Receiving Inspection for Metal Strips & Wires Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
L Objectives for Receiving Inspection (Resources) ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
J Hardware Receiving Inspection AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 12
N Receiving Inspection - Who should receive raw material Inspection, Prints (Drawings), Testing, Sampling and Related Topics 12
kedarg6500 Use of safety glasses at receiving inspection Occupational Health & Safety Management Standards 7
L How do you specify your receiving inspection parameters? Misc. Quality Assurance and Business Systems Related Topics 2
D Receiving Inspection Training Materials Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7
S So Annoyed with Receiving Inspection! Inspection, Prints (Drawings), Testing, Sampling and Related Topics 16
R Minimum Essential Receiving Inspection (M.E.R.I.) Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
M Definition Receiving Inspection of Parts, finished products, service parts etc. Definitions, Acronyms, Abbreviations and Interpretations Listed Alphabetically 6
kedarg6500 Receiving Inspection Documentation Best Practices Supplier Quality Assurance and other Supplier Issues 2
L Must we do Receiving Inspection for everything? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 15
M Does 21 CFR 820.80 (b) require a Supplier to have Receiving Inspection? 21 CFR Part 820 - US FDA Quality System Regulations (QSR) 13
M Calculating Adequate Receiving Inspection Sample Size Statistical Analysis Tools, Techniques and SPC 2
L How to define R & D Receiving (Incoming) Inspection Plan Design and Development of Products and Processes 18
M Receiving Inspection of Customer Owner Property IATF 16949 - Automotive Quality Systems Standard 5
M Partial Incoming (Receiving) Inspection Delivery Inspection. Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
alonFAI Establishing a Receiving Inspection Procedure Document Control Systems, Procedures, Forms and Templates 5
S Ensuring Print Dimensions are in Control Plans, WI's and Receiving Inspection Document Control Systems, Procedures, Forms and Templates 3
S How to calculate Supplier PPM at Receiving Inspection Document Control Systems, Procedures, Forms and Templates 2
C Supplier Management and Receiving Inspection Improvement Statistical Analysis Tools, Techniques and SPC 20
C Receiving Raw Materials, Inspection, Release Inspection, Prints (Drawings), Testing, Sampling and Related Topics 8
G Reduced Receiving Inspection - Now What Inspection, Prints (Drawings), Testing, Sampling and Related Topics 12
M Incoming (Receiving) Inspection Procedure - Please Review Supplier Quality Assurance and other Supplier Issues 7
P Random Sampling at Receiving Inspection: A Practical Implementation needed Inspection, Prints (Drawings), Testing, Sampling and Related Topics 13
M How to Eliminate Receiving Inspection Supplier Quality Assurance and other Supplier Issues 10
A Receiving Inspection - One drum leaks - Should entire lot be rejected? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5
V Measurement Reports for Receiving Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
K Incoming (Receiving) Inspection for Commodity Items used in Medical Devices ISO 13485:2016 - Medical Device Quality Management Systems 11
S Inspection Forms - Receiving Inspection on Buses that will get Refurbished Document Control Systems, Procedures, Forms and Templates 7
C Medical Device On The Floor Receiving (Incoming) Quality Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
I Medical Device Receiving Inspection AQL AQL - Acceptable Quality Level 5
R Receiving inspection and Internal Audit schedule ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 20
T How do I Reduce Frequency of Receiving Inspection Testing for Quality Control Inspection, Prints (Drawings), Testing, Sampling and Related Topics 9
P How you do Receiving Inspection for Chemicals? Supplier Quality Assurance and other Supplier Issues 9
E Measuring Receiving Inspection Process Effectiveness AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
T Is 'Supplier Part Batch' a Root Cause - No Receiving Inspection Problem Solving, Root Cause Fault and Failure Analysis 11
U What Legal Documentation is required for Receiving Inspection of Parts Federal Aviation Administration (FAA) Standards and Requirements 1
T Should the pFMEA start with Receiving Inspection? FMEA and Control Plans 18
S How to maintain 0 Rejections for Quality Receiving Inspection Inspection, Prints (Drawings), Testing, Sampling and Related Topics 4
T Is Material Certification Required for Incoming Material (Receiving) Inspection? Supplier Quality Assurance and other Supplier Issues 10
N How to apply Incoming (Receiving) Inspection to Customer Supplied Material? IATF 16949 - Automotive Quality Systems Standard 18
L Critical Characteristics in Incoming (Receiving) Inspection - Inspection Levels Inspection, Prints (Drawings), Testing, Sampling and Related Topics 18
P Implement FAI process in my Incoming (Receiving) Inspection Procedure ISO 13485:2016 - Medical Device Quality Management Systems 6

Similar threads

Top Bottom